girder stay 中文意思是什麼

girder stay 解釋
縱梁牽索
  • girder : n. 【建築】縱梁,大樑,撐柱,撐桿,大型工字梁。 a framed girder構桁。adj. -less
  • stay : vi ( stayed 〈古美〉 staid)1 停留;暫住,逗留。2 保持下去;持久,堅持。3 站住,停止,中止。 暫...
  1. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  2. Under selfgravity and secondary dead load, the wide steel box girder cable - stay bridge has a large deflection in transverse

    梁寬較大的斜拉橋鋼箱梁在自重和二期恆載的作用下,在橫橋向有著較大的撓度,在設計中必須予以考慮。
  3. Secondly, the construction techniques of cantilever concreting method of girder are analyzed in details. the construction program of stay rope formwork traveler, including the selection of formwork traveler type and the design of formwork traveler, is introduced

    本文重點分析了主梁的懸灌施工技術,從掛籃方案的比選與定型,到掛籃的設計與使用都做了詳細的介紹,本橋採用牽索式掛籃施工方案。
  4. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離式雙主肋截面是由橋面板與邊主梁組合而成,由於其施工方便,在大跨度預應力混凝土斜拉橋中得到廣泛應用。
  5. Because the intervals of two side girders are relatively large in the structure of the floor, it is not even and some and out of shape that its bridge of panels must be produced at the same time horizontally and crookedly and vertically except deforming wholly, level analyse can receive the satisfied result already at this moment, is it is it accord with floor structure real work state, girder of cable - stay bridge just to analyse with whole out of shape relevant non - linear space of function while being out of shape while being above - mentioned to consider only, but about this research rarely seen to report bridge worker is it understand their receive strength characteristic in an all - round way to need badly publicly

    由於肋板結構中兩個邊主梁的間距較大,其橋面板除整體受力變形外必然同時產生橫向彎曲和縱向不均勻局部變形,此時平面分析已不能得到滿意的結果,只有考慮上述變形與整體變形相關作用的非線性空間分析才符合肋板結構主梁斜拉橋的實際工作狀況,但有關這方面的研究鮮見公開報道,橋梁工作者急需全面了解其受力特性。
  6. A detailed model of non - linear parametric excitation vibration coupling the stay cable and the girder, in which the static sag as well as the geometric non - linearity are considered, is proposed in this paper. based on several numeric examples investigated by the galerkin method composed with the integration strategy, several kinds of factors effecting stay cable parameter vibration are studied. another parameter vibration model by the axial excitation is presented and the corresponding nonlinear equations are derived

    本文創新地提出了斜拉橋拉索-橋面耦合參數振動模型,推導了索-橋耦合非線性參數振動方程組,聯合galerkin法及數值積分方法,對各種特性的拉索進行了數值求解,得出了影響拉索參數振動的各種因素;提出了斜拉索受軸向端激勵參數振動模型,導出了模型的非線性振動方程,使用諧波平衡法得出了產生參數振動需要的最小激勵幅值、共振時瞬態及穩態的振動幅值及索拉力的變化特性,並用數值積分方法對實際斜拉橋拉索進行了計算,分析了拉索阻尼對參數振動的影響。