gravel layer 中文意思是什麼

gravel layer 解釋
礫石層
  • gravel : n 1 〈集合詞〉砂礫,礫石。2 【地質學;地理學】砂石,礫。 gravel bed 礫層。3 【醫學】尿砂。vt (〈...
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  1. A layer of coarse gravel is often placed around the drain tile.

    常常在排水瓦管周圍鋪一層粗石礫。
  2. The earth surface of the region across it is mostly thicker humus soil or leaf falling covering layer, and has good heat reserving property, it is mostly weathering shingle, soil - aggregate mixture, and clay - gravel 0. 5m - 4. 0m under it, and weathering rock

    所經地區的地表多為較厚的腐殖土或落葉覆蓋層,其保溫性良好,下層0 . 5 ? 4 . 0米多為風化沙礫、碎石土和礫石土, , 4 . 0米以下為風化巖石。
  3. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與管徑的調配設計,增大環狀粒料層和止水粘土層的厚度;濾水管外包尼龍紗網;粒料與止水粘土接觸界面上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投粘土球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地區人飲水井施工提供技術示範作用。
  4. Dig jade is it leave riverbed in river valley terrace, do beach to refer to, ancient river and alluviation, diluvian gravel that fan have dig seeking and d jade gravel of the layer in front of the mountains the jade of these places is brought by the flowing water too

    挖玉是指離開河床在河谷階地干灘古河道和山前沖積洪積扇上的礫石層中挖尋和闐玉礫。這些地方的玉也是由流水帶來的。
  5. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  6. Boring technology for pile foundation with deep gravel layer

    高速公路深厚卵礫石層樁基成孔技術
  7. Fast drilling technology on deep overburden gravel layer in treatment of coal gob area

    采空區治理工程中深覆蓋厚卵礫石層鉆進施工
  8. Gravelly - sand over an iron - pan and gravel layer

    沙礫覆于鐵質土層與砂礫層之上。
  9. The cushion layer for the dam is constructed with the material prepared mainly with natural sandy gravel and mixed with proper amount of pebble and coarse sand

    大壩墊層料採用以天然砂礫料為主、摻入小石和粗砂以調整級配的方式生產。
  10. The basement of the basin is consist of precambrian crystal basement and paleozoic folding basement, while the cover has undergone the evolution of intra - continental rife in permian, down warped basin in triassic - cretaceous period and inter - mountains basin in tertiary. the main sediments are huge - thick volcanic rock, shallow intrusive rock and tuff in early permian, dark mudstone, marl and muddy dolostone in lucaogou formation in middle permian, huge thick volcanic rock, intruder in tiaohu formation in middle permian, miscellaneous sandy gravel, sandstone and gray mudstone in triassic ( the red is under the gray, and huge - thick dark gray, gray sandy gravel, sandstone, mudstone with coal layer in jurassic

    盆地基底由前寒武紀結晶基底和古生代褶皺基底組成,盆地蓋層則經歷了二疊紀的裂谷盆地、三疊紀?白堊紀的坳陷盆地和第三紀后的山間盆地的演化過程。盆地主要沉積了下二疊統巨厚火山巖、淺成侵入巖和凝灰巖;中二疊統蘆草溝組的暗色泥巖、泥灰巖、白雲質巖石以及條湖組的巨厚層火山巖、侵入巖;三疊系雜色砂礫巖、砂巖及灰色泥巖(下紅上灰) ;以及侏羅紀厚層深灰、灰色砂礫巖、砂巖、泥巖夾煤層。
  11. The university was pro - active in making the well - being of the flame tree outside the station an important consideration in the improvement project. strict supervision was in place during the work so that the tree would not be affected. a gravel layer was added to provide protection for the root area of the tree

    大學積極保育火車站外的一株鳳凰木,該樹亦被列入改善工程的重要考慮因素,嚴格監控在施工期間鳳凰木不會受到工程影響,並特別用疏水石堆成保護層,保護鳳凰木的根部。
  12. Study on stability of percolation of sandy gravel layer of xiaolangdi dam foundation

    小浪底大壩壩基砂礫石層滲透穩定性研究
  13. Moreover, this article also discussed how the variation of relative density and average grain diameter influenced the shear stress of sand and gravel layer

    另外,順便探討了相對密度、平均粒徑對砂礫石層剪應力的敏感度。
  14. Railway jacking bridge engineering passing through sand pebble ( gravel ) layer, because it is a complex loose coarse fragment accumulation layer, the roadbed must be reinforced

    摘要鐵路頂橋工程中遇到砂卵(礫)石層時,因砂卵(礫)石層是一種復雜鬆散粗碎屑堆積層,因此必須對鐵路路基進行加固。
  15. The bridge is located on the alluvial plain in the front of pearl river sloping field. its piles pass through weak soil layer, sandy clay and gravel stratum ; piles " sustaining layer sits in weak - weathering or faint - weathering mudstone

    該橋位於珠江三角洲坡前沖積平原,採用樁基穿越軟土、亞粘土、砂土和礫砂,持力層置於弱風化和微風化的泥質砂巖和泥灰巖夾泥巖中。
  16. Under the function of big pressure and dynamic load, the grains may be moved which may cause the soil body distortion. at present, the relatively ripe methods of drill in gravel layer are mostly double - wall drill pipe reverse circulation drilling, auger stem breast wall drilling and down - the - hole hammer follow down drilling

    論文根據jsl ? 30型礫石鉆機潛孔錘同心跟管鉆具結構,採用程序計算得到了鉆桿內各深度處壓力分佈、鉆頭壓力降、環形空間壓力分佈及空氣流速分佈。
  17. This article discussed the application of shear stress pairing method to evaluation dam base vibration liquefaction of earth - fill dam according to the problem that the sand and gravel layer of main dam base could be liquefied in the condition of seismic intensity grade vll in the design of nierji hydro project

    本文結合尼爾基水利樞紐工程設計中主壩壩基砂礫石層( < 5mm含量> 30 =在地震裂度級工況下可能發生液化的問題,探討了用剪應力對比法在評價土壩壩基震動液化中的應用。
  18. Gravel layer is a usual complex instable formation in drilling engineering. there are some basic features such as looseness of structure, increment, unequal sized grain. it is commonly to form discrete single - grained structure

    在三個計算式的基礎上採用visualbasic編制了潛孔錘同心跟管鉆進風量、風壓計算及空壓機選型程序。
  19. To determine if the dam base been liquefied through contrasting the shear stress which caused sand and gravel layer liquefied measured from indoor dynamic triaxial teat with calculated shear stress caused by earthquake in different depth of sand and gravel layer. and according to result of comparison to direct the design scheme of dam base

    根據室內系統的動三軸試驗測定的砂礫石層液化所需的剪應力與計算的砂礫石層中不同深度處由地震引起的剪應力相對比,從而最終判定壩基是否液化,並根據該結論指導了壩基設計處理方案。
  20. Abstract : the paper presented a kind of drilling hole method that adopted direct circulation and percussion drilling, casing and cliff - protection by mud. the method applied in the complex gravel layer which has the trend to emerge cave - in and drop from the drilling wall

    文摘:介紹一種在砂卵石地層層厚復雜、孔壁易掉塊、易坍塌的鉆孔的成孔方法? ?正循環回轉與沖擊鉆進、套管與泥漿護壁成孔。
分享友人