grid capacity 中文意思是什麼

grid capacity 解釋
柵極電容
  • grid : n 1 格子,格柵。2 (蓄電池的)鉛板。3 【無線電】柵級。4 鐵道網;【電學】電力網;〈英國〉(全國)...
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國水電在系統中所佔比重的增加及單機容量的增大,大型水電站和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發電廠的生產成本,也將提上各個電廠的議事日程。
  2. The plant will have a capacity of 800 megawatts, or eight percent of the current capacity of the national grid

    該發電廠的預期發電能力為800兆瓦,即相當于以色列目前全國總發電量的8 % 。
  3. With increasing of capacity of power grid, every unit may turn into peak load unit

    隨著電網容量的不斷增長,各類機組都會參與調峰。
  4. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期容量3000千瓦的火力發電廠,總供電能力超過7500萬千瓦,日負荷達1 . 5萬千瓦時。區內代電網路齊全,供民線路覆蓋城鄉。
  5. In this paper, river water quality prediction is integrated with water pollution control measures. two parameters, water environmental capacity and pollution index are selected for pollution control measures. the objective is achieved after the development of simulation model using one - dimensional advection dispersion equation. the model algorithm and computer program is an improvement over the existing water quality models, since the model solution involves four point implicit upwind schemes for water quality prediction and pollution control measures at each grid point. model simulation results the assessment of water environmental capacity that yield the acceptable and realistic pollutants concentration in order to maintain water quality objectives. the pollution and overall pollution index of the river is suggested for integrating number of contaminants variables into one index. study provides the mathematical and scientific procedure for water quality management. the new approach is helpful for the water pollution control and to study the impacts of waste effluents on the river system for strategic planning purposes

    本文將水質預測及水污染控制措施有機地結合,選取水環境容量和污染指數作為水污染控制的參數.這樣,一維對流-擴散水質方程的求解除就是實現本研究目的的關鍵.本研究採用的模型在現有的水質模型基礎上有所改進,因為其採用四點隱格式對水質進行預測,推求可接納污染物的環境容量值及為保證水質而限定的污染物濃度值,從而制定相應的水污染控制措施.為整體考慮各種污染物的情況,建議採用河流的污染指數進而推求綜合污染指數.總之,本研究為水質保護提供了科學的計算方法,該法對水污染控制及污水對河道水質的影響是實用有效的
  6. Abstract : in this paper, river water quality prediction is integrated with water pollution control measures. two parameters, water environmental capacity and pollution index are selected for pollution control measures. the objective is achieved after the development of simulation model using one - dimensional advection dispersion equation. the model algorithm and computer program is an improvement over the existing water quality models, since the model solution involves four point implicit upwind schemes for water quality prediction and pollution control measures at each grid point. model simulation results the assessment of water environmental capacity that yield the acceptable and realistic pollutants concentration in order to maintain water quality objectives. the pollution and overall pollution index of the river is suggested for integrating number of contaminants variables into one index. study provides the mathematical and scientific procedure for water quality management. the new approach is helpful for the water pollution control and to study the impacts of waste effluents on the river system for strategic planning purposes

    文摘:本文將水質預測及水污染控制措施有機地結合,選取水環境容量和污染指數作為水污染控制的參數.這樣,一維對流-擴散水質方程的求解除就是實現本研究目的的關鍵.本研究採用的模型在現有的水質模型基礎上有所改進,因為其採用四點隱格式對水質進行預測,推求可接納污染物的環境容量值及為保證水質而限定的污染物濃度值,從而制定相應的水污染控制措施.為整體考慮各種污染物的情況,建議採用河流的污染指數進而推求綜合污染指數.總之,本研究為水質保護提供了科學的計算方法,該法對水污染控制及污水對河道水質的影響是實用有效的
  7. In this situation, redirecting the request to a grid provider that is already working at full capacity is not going to work

    在這種情況下,將請求重定向到已經處于滿負載狀態的網格提供者是不行的。
  8. In chapter 3, the numerical methods of hcppc are discussed. four models of fixed grid technique are surveyed. they are total enthalpy method, apparent heat capacity method, effective heat capacity method and the fictitious heat flow method

    首先回顧了常用的數值分析方法,接著重點介紹了固定網格技術中的幾個數值模型,包括焓法模型、顯熱容法模型、等效熱容法模型和擬源項法模型。
  9. Furthermore, bp is cooperating with most to establish demonstration projects in beijing and shanghai, which will supply hydrogen to hydrogen - fuelled vehicles. through cooperation with cas, bp designed and constructed an on - grid photovoltaic power generation system with generation capacity of 1 mw in shenzhen, which is the largest in china

    另外, bp目前正在與我國科技部合作北京和上海建造氫燃料汽車加氫示範項目。通過與中國科學院合作, bp在深圳設計並建造了一個發電容量達1兆瓦的太陽能光伏並網發電系統。這是中國目前最大的光電發電裝置。
  10. The state grid has presided over what has probably been the largest expansion in a power system in history, with new capacity equal to the entire installed grid of the uk added for three years in succession

    中國國家電網的負責或許是在歷史上電能系統的最大一次的擴張.並新增效益與全部在英國聯系三年裡己安裝的電網效益相等
  11. One measure of china ' s soaring economic growth has been the attention - grabbing fact that it adds new power generating capacity each year equal to the uk ' s entire electricity grid

    衡量中國經濟突飛猛漲的一個指標,一直是這樣一個令人矚目的事實:中國每年新增裝機容量相當于英國的整個電網。
  12. In the deregulated power market , the power grid operator is facing many uncertainty and risks risk concept , risk analysis approach and risk management are introduced in chapter ii , the maj or risks of grid operators is analyzed and evaluated in details based on the real situation and data of yueyang city, hunan province , the economic risk resulting from the uncertainty of load prediction of whole system , generation capacity and parallel quantity of the large enterprises self - owned power plant are analyzed meanwhile , the increase of large enterprises self - owned power plant may cause economic and security risks considering different risk , the qualitmive and quantitative approaches are respectively adopted the direct and indirect congestion risks are evaluated based on probabilistic theory and decision theory the retail pricing and trade modes are major areas embracing risks as well chapter iii divides the risks in internal and external ones based on the characteristics of risk and put forward the layered risk management approach

    詳細分析和論述了電網經營企業面臨的各種風險。基於湖南省岳陽地區電力市場的實際情況和多年歷史數據,採用定性分析和定量計算的手段具體分析了負荷、自備電廠發電量和上網電量預測不確定性以及自備電廠的大量增加給電網企業帶來的經濟性風險和安全性風險。無論是長期還是短期,阻塞不僅會對電網造成直接風險,還可能造成間接風險。
  13. The fitness of four negative electrode materials such as al, fe, zn, cd, and of six membranes materials : microfiber glass mat separator, polyethylene, polypropylene, polyvinyl chloride, vinylon, soapnated cellulose acetate, and of four current collects : carbon fiber ; nickel foam ; nickel foam sthongthened by iron wire net, punched silver grid in the super - iron alkaline batteries was comparatively studied. the influence of two storaged method ( with and without electrolyte ) and two impurities ( zno, fe ( oh ) 3 ) to the experiment cell ' s self - discharge nature was also comparatively studied. at last, the nature of discharge. structure and electrochemistry of experimental cell with k2feo4 as cathode active material prepared by three different methods : high temperature reaction, hypochlorite oxidizing and electrolysis, was comparative ly studied. we can conclude : i ) the open - circuit potential and the flat of work potential and the percent of capacity of k2feo4 till 1. 0v during the discharge at constant load of experimental cells decreased by the order of al / k2feo4, zn / k2feo4, cd / k2feo4, fe / k2feo4. as for the nature of charge - discharge cycle, cd / k2feo4 fe / k2feo4 zn / k2feo4. in water solute electrolyte, although al / k2feo4 can n ' t be used as storage battery, it have great potential as primary cell or storage cell from the aspect of its discharge capacity. discharge power

    採用組裝實驗電池、 x -射線衍射( xrd )和循環伏安( cv )的方法,從實驗電池的放電特性、充放電循環特性、自放電特性,不同高鐵酸鹽的結構特性和電化學特性幾個方面,對4種金屬負極材料( al 、 fe 、 zn 、 cd ) 、 6種隔膜材料(復合玻璃纖維、幅射接枝聚乙烯、改性聚丙烯、聚氯乙烯、維尼綸無紡布、皂化再生纖維素) 、 4種集流體材料(泡沫鎳、以鐵網為加強層的泡沫鎳、切拉銀網、炭纖維編織網)在堿性高鐵電池中的適用性進行了比較研究;對2種雜質組分( zno 、 fe ( oh ) _ 3 )和2類不同貯存方式(干、濕)對實驗電池自放電特性的影響進行了比較研究;對3種方法(高溫固相反應、次氯酸鹽氧化、直流電解)所制k _ 2feo _ 4的實驗電池的放電特性、結構特性和電化學性能進行了比較研究。
  14. With the aim of achieving the lowest system operation cost of the east china power grid, the optimal capacity of pumped - storage power stations in east china power grid is recommended

    摘要以華東電網系統運行成本最優為目標,闡述了華東電網抽水蓄能電站規劃研究的最優建設規模。
  15. The city grid plan and construction, as well as the distribution design for buildings have close relation with the city ' s load density, in other words, the city ' s load density directly influences the capacity, layout, and equipment type selection of the city grid

    摘要城市電網規劃、建設、建築的配電設計與城市電力空間負荷密度息息相關,其值的大小直接影響城市電網定容、布局、設備選型等。
  16. Being basis on the 14 regional grid planning texts of historical data of hunan province, initially determining the factors that affecting power grid construction ; to reflect the distribution of information to determine the scale of construction leading indicators to assess the scale, with its own network of intelligence presented to the region to assess the scale of the distribution network - building indicators system ; establishes assessment models of evaluating 110kv distribution network building scale integrated ; considering the main factor that influencing the construction scale of the distribution network, the improvement method of 10kv distribution networks capacity - load ratio is proposed ; the combination of high voltage distribution network planning optimization technology results presented evaluation pressure distribution network building scale integrated assessment methods

    課題以湖南省14地區電網已有規劃文本歷史數據為基礎,初步確定各種影響電網建設的因素;以反映配電網建設規模的主導信息來確定規模評估指標,提出了符合自己網情的地區配電網建設規模的評估指標體系;建立了評價110kv配電網建設規模的綜合評估模型;通過研究各影響因素與負荷發展儲備系數參數的關系提出了確定10kv變電容載比的方法;結合高壓配電網規劃的優化技術成果,提出了評價中壓配電網建設規模的綜合評估方法。
  17. Many policy and grid experts say that in the short term, the federal energy regulatory commission should enact nationwide policies covering transmission system operation, capacity and investment

    許多政策分析師和電力輸送網專家都認為,美國聯邦能源管制委員會應該在短時間內,針對輸電系統運作、規模和投資等方面實施全國性的政策。
  18. With a wider range of clients and for the clients a wider range of grids, this increased flexibility means that grid users can increase their computing capacity

    。網格有了更廣泛的客戶機,客戶機也有了更廣泛的網格,增強的靈活性意味網格用戶可以提高自己的計算能力。
  19. The oas shipped with orchestrator were based on capacity on demand models that were well suited to web workloads but not to grid workloads

    Orchestrator中附帶的oa特性是基於隨需應變容量( capacity on demand )模型的,它非常適合web任務,但不適合網格工作負載。
  20. Since diffuser is smaller than workshop, to model detailed diffuser geometry would require millions of grid cells, which in turn would require a large computer capacity

    本文的地下廠房形體巨大,而風口尺寸相對廠房而言很小,描述風口邊界條件細節將需要成百萬的網格,所需計算機內存很大。
分享友人