heat balance test 中文意思是什麼

heat balance test 解釋
熱量平衡試驗
  • heat : n 1 熱;熱力;熱度;熱量。2 體溫;發燒。3 (氣候的)高溫,暑氣。4 【冶金】熔煉的爐次;裝爐量;一...
  • balance : n 1 〈常作 a pair of balances〉 天平,秤。2 平衡,均衡,對稱;抵消;比較,對照,對比。3 (鐘表的...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. The reasons of high energy consumption on sintering machine no. 2 at xiangtan i & s co were discussed from the results of heat balance test

    摘要根據湘潭鋼鐵公司(以下簡稱湘鋼) 2號燒結機能耗現狀和熱平衡測試結果分析了該燒結機能耗高的原因。
  2. To test the performance of miniature evaporator, an experimental system was built. in this thesis, experimental study on single - phase balance heat transfer, two - phase balance heat transfer, and pressure drop was finished

    搭建了完整的微型蒸發器性能測試實驗系統,很好的實現了微型蒸發器在液-液換熱過程中的性能測試,為各種微型蒸發器的實驗研究提供有利的支持。
  3. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  4. Stand test methods of diesel locomotives - test of oil water cooling equipment performance and heat balance

    內燃機車臺架試驗方法油水冷卻裝置性能及熱平衡試驗
  5. Combining with the energy fluxes balance above fuel surface, the simulation and calculation of transient heat conduction of the pe fuel with liquid layer while melting and pyrolyzing are considered by use of the moving coordinates. the calculated regression rate of the pe fuel approximately tallies with the same kind of hybrid rocket motor test data from the abroad

    建立了pe燃料的熔化、熱解、導熱模型,應用動坐標系,結合燃料表面熱環境,對具有液體層的pe燃料的熔化、熱解和內部瞬態導熱過程進行了模擬計算,計算的pe燃料退移速率與國外同類試驗的測量結果符合較好。
分享友人