heat supply system 中文意思是什麼

heat supply system 解釋
熱供應系統
  • heat : n 1 熱;熱力;熱度;熱量。2 體溫;發燒。3 (氣候的)高溫,暑氣。4 【冶金】熔煉的爐次;裝爐量;一...
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用壓水堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態功率變化時,冷卻劑平均溫度與蒸汽壓都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,有效地改善了核動力裝置的總體運行性能,特別是在低負荷運行時,可以提高裝置經濟性、降低主泵運行噪聲、改善二迴路系統的設計、運行和控制條件,這對于提高船用核動力裝置的運行可靠性和安全性具有實際意義
  2. Discussion on design of the semi - open heat supply system

    半開式供熱系統設計探討
  3. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電廠# 9 、 # 10142mw抽汽母管制供熱機組,選用美國西屋公司westation控制系統,設計、應用了deb協調控制策略,從單純作為負荷和主蒸汽壓力控制協調的基本功能,成功擴展到整個運行范圍,即從正常運行工況到異常運行工況及啟、停工況。
  4. High temperature water - source heat pump can reclaim loss - grade heat that is produced when energy - changed device such as boiler is operating, anti the return water of district heating supply system is heated

    摘要利用高溫水源熱泵設備可回收鍋爐等能量轉化設備產生大量的低溫餘熱,提高其溫度用於直接供熱。
  5. Winter is dreary. but our heat supply system is satisfying and it ' s always warm inside

    冬天是沉悶的,好在我們的供暖系統總是令房間里溫暖如春。
  6. In this paper, the theory of equivalent enthalpy drops is introduced first. then this paper deduces the theory for economic quantitative analysis of power units thermal circulation system, and according to the operational characteristic emphasizes the application to energy - loss analysis of heat - supply units

    在本文中,首先以等效焓降理論為基礎,闡述了火電機組熱力系統經濟性定量分析的原理,並根據機組運行的方式和特點,主要針對供熱機組介紹了性能能損分析的理論方法。
  7. This paper analyses current situation of chp and situation of development, use evaluating energy utilization - - based on electricity comparing with state calculated method - - based on heat, calculates the operating data of baotou second thermal power plant heat supply system , extends the study of heat supply performance to heat net and heat consumer, synthetically analyses heat load characteristic 、 pipe net property and heat supply distance witch effect heat supply cost. the paper studies the thermal power performance of thermal power plant total energy system, discuss heat supply cost which effect the development of chp

    本文對熱電聯產的現狀及發展情況進行分析,採用能源利用系統性能評價指標體系及其評價指標? ?電量法與國家目前採用的法定計量方法? ?熱量法進行比較,通過對內蒙古包頭第二熱電廠供熱熱源系統及供熱熱網系統的熱電聯產運行數據進行分析計算,將供熱過程的熱力性能研究延伸至熱網和熱用戶,分析用戶終端的能源利用情況,針對內蒙古地區主力機組和地區條件,綜合分析了熱負荷特性、管網性能及供熱距離對供熱成本的影響,研究了熱電廠總能系統的熱力性能,對困擾熱電聯產的供熱成本進行了探討。
  8. Heat gain and temperature rise in low temperature air supply system

    低溫送風空調系統的風管得熱與溫升
  9. Analysis on the causes of hydraulic disturbance of heat - supply system and solving measures

    供熱系統水力失調原因分析與解決措施
  10. The self - supported flow regulating valve can be approach to eliminate the water power maladjustment in city heat supply system meanwhile realize energy saving

    供熱系統中的水力失調與自力式流量調節閥的應用
  11. The way to raise the capacity of heating boiler is discussed, and the method for solving the hydraulic imbalance between outdoor heat - supply system and indoor heating system is analyzed

    摘要探討了提高供熱鍋爐產熱能力的途徑,分析了解決室外供熱系統及室內供暖系統水力失調的方法。
  12. This plan avoids the phenomenon that it is too hot at the nearer of the heatsource but too coid at the end. most big heat - net use indirect heat - supply mode, when the fist - net can provide enough thermal energy, the regulating system can run dependably according the initial value

    為解決好熱力站的爭熱現象,提出「熱量均攤」控制策略,避免了熱源近端太熱而末端太冷的現象的發生。大型熱網普遍採用間接供熱方式,當一次熱網供熱能力充足時,調節系統會根據設定值可靠運行。
  13. In this text, we analyzed the conirol principle of the concentration heat - supply control system, adopted the pid method to settle the parameter, and give out the concrete calculation method and the software and hardware of the control system in the heat - state

    本文分析了集中供熱控制系統的控制原理,採用了pid參數的整定方法,給出了具體的計算方法和熱力站控制系統的軟、硬體實現。
  14. In this paper, it was introduced that the design and application of scada system in concentrative heat - supply system for eastern settlement of fushun petroleum chemical company. the heat - supply technology and scada system was discussed

    摘要介紹了撫順石油化工公司某住宅集中供熱系統改造工程中監控系統的設計和使用情況,討論了熱網工藝、控制與信息集中監視管理。
  15. This article mainly throws cast on administration methods of computer used on the operation of steam heat - supply system, charge data storage, charge data statistics and analysis which aims at improve work effeciency and simplify adminstration work

    本文主要闡述利用計算機管理手段對蒸汽供熱系統的生產運行、收費數據存儲、收費數據統計及分析的電算化管理,目的是提高工作效率,嚴細管理工作。
  16. The compressor driven by steam turbine for no. 4 blast furnace and the central heat supply system

    4高爐汽動鼓風機站及集中供熱設施項目
  17. Compressor driven by steam turbine for no. 4 blast furnace and collecting heat supply system in tisco group

    高爐汽動鼓風機站及集中供熱設施。
  18. Selection of return water modes of heat - supply system based upon atmospheric hot water boiler

    常壓熱水鍋爐供熱系統回水方式的選擇
  19. The construction of the heat supply system should be carried out strictly in line with the construction technique

    該供暖系統的施工必須嚴格按照施工工藝操作進行。
  20. The compressor driven by steam turbine for no. 4 blast furnace and the collecting heat supply system is a modification and extension project of existent power plant in tisco

    高爐汽動鼓風站及集中供熱設施,是太鋼現有的發電廠的改擴建工程。
分享友人