high dam 中文意思是什麼

high dam 解釋
大水
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. Egypt ' s leadership in the arab was cemented by the aswan high dam

    阿斯旺大壩鞏固了埃及在阿拉伯世界的領袖地位。
  3. Aswan high dam, egypt

    印度阿斯旺水壩
  4. Aswan high dam egypt

    印度阿斯旺水壩
  5. As a new component of sensor, fiber grating have many instinctive advantages, such as light in weight, anti - cauterization, anti - interference in electromagnetism, high - sensitivity and compaction in construction. it is very easy to be coupled with fibers and the coupling - loss is slight. using fiber grating ’ s character of sensitivity for stress ; people have done some envelope experiments on structural systems ( such as storied buildings, bridge, railway and dam )

    光纖光柵傳感器除了具有重量輕、耐腐蝕、抗電磁干擾、靈敏度高、結構緊湊等優點外,還有其獨特的優越性,如探頭尺寸小,其直徑與光纖等同;易於與光纖耦合,耦合損耗小;波長調制型,抗干擾能力強;集傳感與傳輸於一體且具有極強的復用能力,易於構成傳感網路;測量對象廣泛,易於實現多參數傳感測量等等。
  6. Among them many is a wild species, from the high mountain to the even dam, from mound to the clough, there is all the report trace and shadow of the spring flower in everywhere

    我國共有報春花230種,雲南就有158種。其中多為野生種,從高山到平壩,從丘陵到深谷,處處都有報春花的蹤影。
  7. The proposal is to make use of the west sea coffer dam and chong hing water sports centre as a water ski centre to reduce potential risk of collision in open sea while the existing activities to be relocated to the high island reservoir

    這項建議旨在使用西面海堤和創興水上活動中心作為滑水中心,以減低在海面進行滑水活動可能發生碰撞的危險,而現有的活動則可遷往萬宜水庫。
  8. Egypt ' s leadership in the arab was [ color = red ] cemented [ / color ] by the aswan high dam

    阿斯旺大壩鞏固了埃及在阿拉伯世界的領袖地位。
  9. After 11 years of construction, the aswan high dam in egypt is completed

    1970年的今天,歷經11年的修建后,埃及的阿斯旺水壩竣工完成。
  10. Hong kong s airport was the only asian achiever in a list that included the panama canal, the channel tunnel and egypt s aswan high dam

    香港國際機場贏得這項殊榮,是亞洲區唯一可與巴拿馬運河英法海峽隧道和埃及阿斯旺水壩同享殊榮的建築工程項目
  11. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國水電事業也迎來了迅猛發展的大好時機,一批高壩水電站正在建設或規劃之中,其泄水建築物孔口及水頭愈來愈大,常規混凝土或鋼筋混凝土閘室閘墩結構難以承受如此之大的水推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  12. Numerical simulation on three kinds of typical flow patterns in the plunge pool of high dam

    不可壓縮流中板狀結構的振動分析
  13. The adoption of ship lift is also a very effective mean for high dam

    升船機也是解決高壩通航一種非常有效的手段。
  14. Mr white : if we go to visit the high dam, we can take a boat to visit the temple at abu simbel

    懷特先生:如果我們去游覽高壩,我們還可以乘船去觀看阿布?辛拜勒神廟。
  15. Bob : can ' t we visit the high dam ? i ' ve read a lot about it ; it ' s the biggest in the world

    鮑勃:我們不能去參觀高壩嗎?我已讀了很多關于高壩的情況;它是世界上最大的。
  16. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  17. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽水電站右岸旋流內消能泄洪洞是國內第一個泄量達1000m s 、水頭超過100m ,即將修建的旋流式內消能泄洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能泄洪洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩建設中泄水建築物的高速水流問題與導流洞改建的技術與經濟問題提供工程實例,對推動與發展水工水力學的研究與發展均具有重要的理論與實踐意義。
  18. Numerical simulation on the typical flow patterns in the plunge pool of high dam

    反拱水墊塘單底板塊振動特性的理論分析與試驗研究
  19. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是高壩大庫的高水頭電站,還是低水頭河床式樞紐,電站進水口的取水排沙歷來是一個倍受關注的問題。
  20. Based on the fem model of the dam - reservoir system, the influence of water compressibility to the hydrodynamics is systemically analyzed and researched. it is showed thaf the water compressibility has significant effect to the size and distributing of hydrodynamics on the high dam, and the absorbency of reservoir bottom has a role as a damper on the dam - reservoir system

    基於庫水體各類邊界條件的有限元模型,系統分析了可壓縮性對壩體動力響應的影響,表明水可壓縮性對高壩動水壓力強度和分佈具有顯著影響,而庫底邊界條件對大壩的地震反應有抑制作用。
分享友人