high pile 中文意思是什麼

high pile 解釋
長毛絨
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. Firstly, oscillation between events of imperial and of local interest, the anticipated diamond jubilee of queen victoria born 1820, acceded 1837 and the posticipated opening of the new municipal fish market : secondly, apprehension of opposition from extreme circles on the questions of the respective visits of their royal highnesses, the duke and duchess of york real, and of his majesty king brian boru imaginary ; thirdly, a conflict between professional etiquette and professional emulation concerning the recent erections of the grand lyric hall on burgh quay and the theatre royal in hawkins street : fourthly, distraction resultant from compassion for nelly bouverist s non - intellectual, non - political, nontopical expression of countenance and concupiscence caused by nelly bouverist s revelations of white articles of nonintellectual, non - political, non - topical underclothing while she nelly bouverist was in the articles : fifthly, the difficulties of the selection of appropriate music and humorous allusions from everybody s book of jokes 1, 000 pages and a laugh in every one ; sixthly, the rhymes homophonous and cacophonous, associated with the names of the new lord mayor, daniel tallon, the new high sheriff, thomas pile and the new solicitorgeneral, dunbar plunket barton

    第二,深恐皇族約克公爵和公爵夫人58實有其人以及布賴恩勃魯國王陛下虛構的人物分別前來訪問一事,會招致來自左右兩方面的反對。第三,新峻工的伯格碼頭區的大歌劇廳和霍金斯街的皇家劇場59 ,存在著職業的禮儀與職業的競爭之間的矛盾。第四,由於內莉布弗里斯特的那種非理性非政治不時興的容貌會引起觀眾的同情內莉布弗里斯特身穿非理性非政治不時興的白色襯衣,當她內莉布弗里斯特表演時一旦將襯衣袒露出來,會撩撥觀眾的情慾,令人擔心會使觀眾神魂顛倒。
  2. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    滑坡是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑樁是一種適應性強、對滑坡穩定性和地質環境干擾小、工期短、抗滑能力強的滑坡整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑樁施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑樁施工要求,分析了風動潛孔錘用於抗滑樁施工的可行性,並舉出了其應用實例
  3. Probe into the construction of the underwater collar beam of the high - pressure jet grouting pile

    高壓旋噴樁施工水下系梁的探討
  4. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  5. It is haemorrhoid, not afraid, this is the disease with a very high incidence of a disease, have 10 people the view of 9 naevus, that is to say almost the pile that everybody has different rate, some is heavy, some also does not become aware even oneself, i recommend root of your use naevus to break, it is medicine of profess to convinced, germany imports, 40 yuan or so, the drugstore that arrives big a little bit has commonly, every 80, eat 3 times everyday, every time 3, eat effective fruit, but this medicine is to ask to be able to insist to eat, next at ordinary times dietary attention is not stimulated tartly, do not let him get angry, much draft fruit drinks water more, maintain defecate unobstructed, ok, if felt embarrassed not to see a doctor, because the doctor can suggest you become an operation commonly, not quite good, the operation is unwarrantable also cure completely, if you are the female that had not borne, that should not become an operation more, because give birth to a child later when, still meet those who cause haemorrhoid recrudesce greatly too forcibly, believe me, additionally you can cooperate medicine of an external use, ma yinglong haemorrhoid creams, besmear outside, more comfortable, this is cheaper, a few money, go quickly buying drug, do not delay too long, arrived otherwise the degree of defecate belt blood is painful

    是痔瘡,不要擔心,這是個發病率很高的病,有十人九痔的說法,也就是說幾乎每個人都有不同程度的痔瘡,有的重,有的連自己也覺察不到,我推薦你使用痔根斷,是口服藥,德國進口的,一盒四十元左右,到大點的藥店一般都有,每盒80粒,天天吃三次,每次三顆,吃完三天就有效果,但是這個藥是要求可以堅持吃完一盒的,然後平時飲食注重不要辛辣刺激,不要讓自己上火,多吃水果多喝水,保持大便通暢,就可以了,假如不好意思就不要看醫生了,因為醫生一般會建議你做手術,不太好,手術也不能保證完全治好,假如你是未生育過的女性,那就更不要做手術了,因為以後生小孩時,用力過大還是會引發痔瘡復發的,相信我,另外你可以配合一個外用藥,馬應龍痔瘡膏,塗在外面,比較舒適,這個比較便宜,幾塊錢,快去買藥吧,不要耽誤太長時間,不然到了大便帶血的程度就痛苦了。
  6. Analysis of comparing static loading test with dynamic high strain testing for screw pile foundation

    螺紋樁樁基承載力靜載與高應變檢測對比分析
  7. Based on the previous theoretical analysis, two practical projects of pile - raft foundation of high - rise building on soft ground are studied by using the software of pile - raft foundation interaction analysis program pogap. the choice of standing layer for pile, the rational compression modulus of soil under pile, the place of pile and the space between piles, and the reasonable thickness of plate are analyzed, some well - regulated conclusions can be achieved. an experiential equation for choosing the optimal thickness of plate is also given

    根據以上分析,結合兩個軟弱地基上高層建築樁筏基礎的工程實例,利用浙江大學巖土工程研究所編制的pogap樁筏基礎共同作用分析軟體,就樁端持力層的選擇,樁端下臥層壓縮模量合理選值,樁位及樁間距的確定,筏板厚度的合理取值等問題展開分析,得出了一些規律性的結論,提出了筏板最佳板厚取值的經驗公式。
  8. He dug until the hole was deep and the dirt pile was high

    他一直挖,直到坑很深了,挖出的土堆得很高了。
  9. There are many methods of foundation consolidation for civil engineering, such as soil exchange method, prepress method, dynamic consolidation method, vibrancy rushing method, soil and podsol dense pile method, sand pile, cement - coal - powder and gravel pile method, deep mixing method, high - pressure eject masonry, etc. the dynamic consolidation and deep mixing method ( dmm ) are very common in project construction

    目前國內外地基處理的方法很多,主要的地基處理方法包括:換填法、預壓法、強夯法、振沖法、土和灰土擠密樁法、砂樁法、水泥粉煤灰碎石樁法、深層攪拌法以及高壓噴射注漿法等。其中強夯法和深層攪拌法是工程建設中較常用的加固方法。
  10. The quality requirement is very high on expressway soft foundation improvement compared to the super pre - loading and the jet - powder pile, the vacuum - heaped load combining pre - compression is cheaper and its intensify effect is distinct

    高速公路軟基處理質量要求高,與傳統等超載預壓和粉噴樁加固軟基相比,真空堆載聯合預壓加固效果明顯,費用低。
  11. Further more, it is reasonable and advanced that rafts share loads with upper structures and knowledge about pile - raft foundations in high buildings is strengthened. the primary research results of this paper hold great guiding significance and enrich theoretic research of pile - raft foundation

    本文初步的、探索性的研究成果,對現行設計工作有明顯的指導意義,進一步豐富了樁?筏基礎的理論研究。
  12. Calculation of internal force of embeded anti - slide pile in high rock slope

    巖石高邊坡埋入式抗滑樁的內力計算
  13. Abstract : a certain hall is demaged by water. lime pile and high compress forcing pulp are used to reinforce fhe settled foundation

    文摘:某禮堂綜合樓受浸水損壞,採用生石灰樁及高壓水泥注漿綜合法加固建築物沉陷部分地基,獲得成功。
  14. In accordance with the construction of xi ' ning - huangyuan first class highway and machangyuan - ping ' an high - speed highway, based on a good deal of investigation, this paper studies the geologic character and the main physical mechanics of the collapsibility loess in qinghai. this paper also studies the foundation treatment effect with dynamic consolidation, impact rolling, lime pile and lime - soil cushion. to dynamic consolidation, much attention is given to the relationship between the ramming energy and the effective depth

    本文結合西湟一級公路、馬平高速公路建設,對青海地區濕陷性黃土進行了大量勘探調查,總結研究了青海地區濕陷性黃土的地質結構特點、主要的物理力學性質及其規律;並通過現場試驗,系統地研究了強夯、沖擊碾壓、灰土擠密樁和灰土換填等地基處理方法的施工工藝及處理效果。
  15. Moreover, the main components of h mineral admixture is procured from industry waste, and its " production procedure is simple, so its " production cost is very low. the most tightness pile up theory and rheology is successfully applied in the designation of self - compacting concrete, and the factors such as sand rate, aggregate grading, paste content and mineral admixtures are been studied. under the guidance of mix design theory and on the basis of mass experiments, c20 - c80 high performance self - compacting concrete is been produced

    將最緊密堆積原理和流變學原理相結合,運用於免振搗混凝土配合比設計之中,系統地研究了砂率、集料級配、水泥漿量、礦物摻合料等因素對免振搗混凝土物理力學性能、工作性能、耐久性能的影響,成功配製出從c20 - c80及以上強度等級的高性能免振搗混凝土。
  16. With the development of construction technology and mechanic about deepwater foundation, hanging box weir had being applied widely for construction of high pile cap

    隨著深水基礎施工技術和機械的發展,吊箱圍堰在高樁承臺施工中的應用日益廣泛。
  17. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  18. Project of three dimension intuitionistic and corporeal design is bringed forward about structure of the long piled wharf in a question for discussion. it have some applied value that evaluating engineering and structure about the high - pile wharf

    課題成果為碼頭結構設計提供一種直觀、有形的三維設計解決方案,對高樁碼頭設計的工程和結構評價等具有一定的應用價值。
  19. Based on the investigation of the underwater and above - water earthquake damage to the piled jetties in the kobe violent earthquakes in 1995 and the miyagiken - oki violent earthquakes in 2003, japan, the causes of the earthquake damage to the high pile jetties in both earthquakes were analyzed and the mechanism of damage was also discussed with the results of the analysis and calculations

    通過對2003年日本宮城縣沖地震和1995年阪神大地震中港灣高樁碼頭的水上和水下震害調查,分析了兩次地震中出現的高樁碼頭震害的原因,並根據計算分析結果探討了其破壞機制。
  20. This dissertation carries on research of real engineering structures. the main contents include : 1 take high pile and beam bridge for example, this paper discusses the merits and defects of the damage assessment method based on sensitivity analysis

    本文針對實際的工程結構,完成了以下的研究工作: l 、以高墩粱式橋為研究對象,討論基子靈敏度分析進行損傷診斷方法的優缺點。
分享友人