high-stress area 中文意思是什麼

high-stress area 解釋
大應力區
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  2. Further more, the fracture possibility is analyzed with fracture mechanics after the stress calculation of local high stress area around the bolt hole in shell flange and the measurement of fracture toughness of gray cast iron. the improving structure of bolts connected head and shell flange is brought forward

    此外,在計算獲得缸體法蘭螺栓孔局部高應力區的應力水平后,由斷裂力學分析發生脆性斷裂的可能性,並提出烘缸缸體與缸蓋聯接結構的改進方案。
  3. China is a developing country, having expansion section and numerous population, but its economy is not imbalance among vary areas. in the westward area of the china, there is weak ecosystem, high population natural growth rate, and big stress of offering unemployed persons an occupation, little number and low quality of human resource

    我國是一個發展中國家,地域遼闊、人口眾多、地區之間經濟發展不平衡,尤其是西部地區生態環境脆弱,人口自然增長率高,勞動就業壓力大,人力資源數量不足、質量不高,經濟落後,這些問題已經成為西部乃至全國經濟可持續發展的突出障礙。
  4. The migration of hydrocarbon tends to take place from high pressure stress distribution area ( hydrocarbon generation sag ) towards low pressure stress distribution area ( uplift )

    油氣從高壓應力分佈區(生烴凹陷)向低壓應力分佈區(隆起區)運移。
  5. Research on prevention of rock burst in deep high - stress area of fankou deposit

    凡口礦深部高應力區巖爆防治研究
  6. Gas comprehensive treatment of high gas and high - stress area in gaocheng coal mine

    告成礦高瓦斯高應力區瓦斯綜合治理技術
  7. The prevention and control of rock burst are of great significance for safely exploiting deep deposit in high - stress area

    摘要巖爆的預防和控制對深部高應力區礦床的安全開采具有十分重要的意義。
  8. The ratio of the diameter of nozzle to the diameter of vessel has greater effect on the distribution area of high stress in plastic deformation stage

    對于均處于塑性階段的結構而言,開孔率的大小對高應力區的分佈范圍影響較大。
  9. Erosion damage decreases rock load area, after defining damage variable, the damage stress in rock can be calculated by the method bring forward by lemaitre conveniently. for surrounding rock of a deep buried tunnel under the condition of drained, its seepage character is not only controlled by the high stress in rock, but also influenced by the development of erosion damage. in the whole course of rock " s deformation and failure, its seepage character decreases with the increment of stress in elastic stage, while " increases with the development of failure

    巖樣中全應力?應變三軸滲透試驗過程中的典型表現為隨著應力的增加,巖體內的空隙和裂紋受載閉合,滲透性降低,應力達到一定閾西南交通大學鷹士研究生學位論文第11頁值后,巖體內部裂紋發生擴展和歸並,滲透性增強;同樣,地下水的動、靜壓力作用對裂紋的擴展和歸並也起著促進作用。
  10. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  11. The temperature and stress field of wagon wheel under the condition of long ramp way cycle braking in daqin line have been simulated by using fem and axial symmetry model results indicate that high stress area appears on the wheel web, and the strength of wheel meets the requirement of routine operation under current braking condition

    摘要採用軸對稱模型和有限元方法,模擬了大秦線長大坡道循環制動條件下貨車車輪溫度和應力場,結果表明車輪高應力區出現在輻板上,現行制動條件下車輪強度滿足使用要求。
  12. In the process of loading, the stress around the junction linearly increases at first and then the range of the high stress area enlarges

    在逐步加載過程中,加載前期相貫區周邊應力呈線性增長,一定程度後主要表現為高應力范圍的擴大。
  13. A bearing surface transmits the interaction between an arch dam and its foundation, the strength of which directly affects the constraint of the bedrock to the dam, and thus affects the stress and deformation of the dam. the influence is studied in this paper with nonlinear finite element method, as an example, for a high arch dam in design. the results show that the influence on stress is only limited within the local area near the bearing surface, larger on the maximum principal tensile stress than on the principal compression stress, and the decrease of the strength does not cause unlimited increase of the maximum stress. the influence on the displacement of the top of the dam is smaller than that of the bottom of the dam, especially the relative downstream displacement. at the lower strength of the bearing surface, the relative downstream displacement at the bottom of the dam increases with the decrease of the strength

    建基面是傳遞拱壩和基巖相互作用的紐帶,它的強度直接影響基巖對壩體的約束,從而影響壩體的應力和變形.採用非線性有限單元法,以設計中的某高拱壩為例,分析建基面強度對壩體應力和變形的影響.結果表明建基面強度對壩體應力的影響僅限於建基面附近的局部范圍,對最大主拉應力的影響要大於對最大主壓應力的影響,建基面強度的降低不會無限地增大壩體的應力數值;建基面強度對壩頂位移的影響較小,但對壩底位移(尤其是順河向相對位移)的影響較大,當建基面強度較低時,壩底順河向相對位移隨建基面強度的降低而增大
  14. With the best modulation strategy which was found on condition that it must have largest energy transfer ratio, smallest current ripple of the inductor, and realizing zvs of each switches, the converter overcomes the drawbacks presented by the conventional zvs fb converter, such as high voltage stress of each switches, large current ripple of the inductor, and severe parasitic ringing on the rectifier diodes, so it can get higher efficiency, faster respond speed, and wider application area. the operation principle of the proposed converter is analyzed and verified by a 3kw, 50khz experimental prototype. experiments and research results show that the scheme of the tl topology derivation is reasonable, adjusted modulation strategy makes some other severe problems in conventional topologies easy to solve or makes the converter more competitive

    研究結果表明,本文提出的三電平拓撲變換方案合理,針對各種三電平拓撲尋找到的控制策略可以解決變換器存在的某些問題或使變換器表現出更突出的優勢:例如針對單管直流變換器三電平拓撲的控制策略可以減小電感的設計值,針對推挽直流變換器三電平拓撲的控制策略可以實現開關管的軟開關、解決變壓器偏磁問題等,針對全橋直流變換器三電平拓撲的控制策略可以減小電感的設計值、實現開關管的軟開關等。
  15. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  16. Steady state thermal analysis under natural convection boundary condition was performed. both the temperature distribution and the induced mechanical stress were calculated in this simulation. high stress area was found and the potential reasons which can cause packaging to fail were also discussed

    具體內容包括: 1 .建立一款疊層csp / bga封裝的三維實體有限元模型,求解自然對流條件下的穩態溫度場分佈,並在此基礎上進行穩態熱應力和熱應變分析,找出由於溫度梯度在封裝內部引起的高熱應力區域,分析其可能造成的失效結果。
  17. By comparing between the rectangular groove and curved groove, we find that two high stress area of rectangular groove o - ring occurs during the sealing period, and the wearing on the both inside and outside diameter surfaces ; the high stress area only happens at the part area of cone shaft, and the distribution of stress is more even than the former, and the wearing is on the inside diameter surface, the improvement of its distortions makes the service life of sealing lengthen

    通過矩形槽和弧形槽的對比研究發現,矩形槽o形圈在密封過程中出現兩個高應力區,磨損發生在內徑、外徑兩個表面_匕,弧形槽o形圈的高應力區僅出現在牙爪軸鄰近的局部區域內,應力分佈較前者更為均勻,磨損進發生在內徑表面,其受力變形狀況的改善將使密封壽命進一步提高。
  18. Stability study on surrounding rockwith structural rheology in high stress area

    高地應力區結構性流變圍巖穩定性研究
  19. A new method is necessary. in this paper, we employed the i - deas software to developed a 3 - d model and make a finite element analysis ( fea ) on slewing frames based on the nominal loads and geometry parameter of crane qtz63, aimed to find the principle of the area with high stress and big deformation and estimated the effect on the whole tower crane system

    本文以qtz63塔機為研究對象,按設計提供的載荷及幾何參數,運用i - deas軟體先對回轉支承系統三維建模,再進行結構有限元分析,依據強度及變形結果,找出塔機各種工況下高應力區域、變形明顯部位出現的規律,並分析對塔機系統產生的影響。
分享友人