high-temperature construction 中文意思是什麼

high-temperature construction 解釋
耐高溫結構
  • high : adj 1 高的〈指物,形容人的身高用 tall〉;高處的;高地的。2 高級的,高等的,高位的,重要的。3 高尚...
  • temperature : n. 1. 溫度,氣溫。2. 體溫。3. 〈口語〉發燒,高燒。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. It focuses on the theory of the mineral functional materials " improving the anti - chloride permeability and the chloride binding. the main achievements of this article include : 1 ) use the technology of xrd, sem, bet, laser particle size distributor etc to test the component, the construction, particle size distributor, specific surface etc of micro - silica, ultra - fined slag, high quality fly ash, meta - kaolin clay, four types of the mineral functional material, theoretically analysis the functions which the four mineral functional minerals act on cement concrete, namely pozzolanicity effect, filling effect, micro - aggregate effect, surface adsorption effect and so bring into play the affect of plastification, lowing of temperature, reinforcement, improvement of durability. base on this analysis we can conclude that the proper diameter of the mineral functional material is 5 m - 15 m, that is blain fineness 4500cm2 / g - 7500cm2 / g

    本論文的主要成果包括以下幾個方面: ( 1 )採用xrd 、 sem 、 bet 、激光粒度分析儀等多種測試手段,探明了以硅灰,超細磨粒化高爐礦渣,優質粉煤灰及偏高嶺土超細粉等4種超細礦物功能材料的組成、結構、粒度分佈、比表面積等基本性質;從理論上分析了礦物功能材料在混凝土中的4種效應,即火山灰效應、填充密實效應、微集料效應、表面吸附效應,並由此發揮出增塑、溫峰削減(降熱) ,增強及耐久性改善等作用;通過相關理論分析,推導出礦物功能材料的合理粒徑范圍在5 m 15 m ,即勃氏比表面積為4500cm ~ 2 g 7500cm ~ 2 g 。
  2. Construction of a 1000m plus deep shaft in a high temperature and heavy water flow environment

    大涌水高溫條件下千米深井的施工實踐
  3. Based on the project imbrued especially by hunan province construction office, the study of this paper includes four parts as follows : the first part does some simplify on the characters of the rc material under high temperature. after transferring the rc section under fire to equivalent one at normal temperature based on the stiffness and intensity equivalent, the rc members under fire can be calculated as ones at normal temperature

    主要研究內容如下: ( 1 )基於剛度等效或強度等效原則,根據截面各點材料力學性能的退化,把受火鋼筋混凝土非均勻截面等效成常溫下的鋼筋混凝土截面,使得高溫下構件剛度和強度的計算可按常溫下的計算理論進行。
  4. The construction execution of prestressing work has many advantages such as : dry - work, rapidity, no organic adhesion agent, small space to be taken, the high efficiency of strengthening, so this way can be applied in the structures which request to improve bearing capacity largely and take small space after strengthening as well as other structures which will work in long time and in high temperature

    預應力加固過程是干作業,施工速度快,不使用有機粘結劑,加固后佔用空間小,加固效率高,適用於要求大幅度提高承載力及加固后佔用空間小的混凝土結構,也適用於要求施工速度快,加固后使用年限長,工作環境溫度高的結構。
  5. Aiming at the problems in testing strata with low permeability, hydrogen sulfide - bearing wells and high temperature and pressure, a whole set of mature testing technology and doable construction programs are worked out, which turn out to be mature in technology, secure in construction and objective and accurate in testing results examined by practical construction

    摘要針對低滲透地層測試、含硫化氫井的測試及高濕高壓井測中存在的問題,經過不斷探索和實踐,形成了一整套成熟的測試技術和切實可行的施工方案,經實際施工檢驗證明,技術成熟,施工方案安全可靠,測試結果客觀準確。
  6. A reliable device that will last for years. the tried - and - true firing chamber construction ensures high temperature precision with extremely consistent firing results

    焙燒室設計經過實踐的檢驗,保證了準確的溫度和恆定的焙燒結果。
  7. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  8. The main contents that are researched in the thesis are : asphalt mixture low temperature crazing principle, the influencing factor of asphalt mixtures low temperature crazing, asphalt - rubber macadam, the pressure - resistance intensity, the crazing high temperature, the smooth - resistance and construction technology, the technological economical compare and so on, exploring the new - type structural combinations of asphalt pavement

    本文研究的主要內容是:瀝青混合料低溫開裂機理,瀝青混合料低溫開裂影響因素,瀝青橡膠碎石,玻璃纖維瀝青碎石的高溫抗壓強度,低溫劈裂強度,抗滑性能及其施工工藝,技術與經濟比較等,探索新型的瀝青路面結構組合。
  9. South high temperature and wet climate easily leads asphalt pavement to water damage, this writer participated in the guangdong meihe highway asphalt pavement construction, mainly through the asphalt mixture marshall immersion test, splitting freeze - thaw test anylyze asphalt mixture types and asphalt content ' s influences to the water stability, and gives the linear fitting relationship about the soaking remnants stability and freeze - thaw splitting strength and oil - stone ratio. and water stable indicators and the oil - stone ratio ' s second linear fitting relationship, finally stressed asphalt and asphalt amount significance to water stability

    摘要通過瀝青混合料的浸水馬歇爾試驗、凍融劈裂試驗分析了瀝青類型及瀝青用量對瀝青混合料水穩定性的影響,並給出了浸水殘留穩定度與凍融劈裂強度與油石比的線性擬合函數關系,以及水穩性指標與油石比的二次函數關系,最後指出改性瀝青和瀝青用量對混合料水穩定性的意義。
  10. Technological innovation is the development of enterprises in the last word, i have always maintained the secretary rise in special wallssevered the forefront of the core system, in 2000, the high - intensity of my invention cesium potassium glass chip. test success has been on the market seven years, 2007 to special ( fire ) glass wallsindoor fire glass partition, fire glass window design, construction and 10 years of deep - processing glass curtain wall designconstruction and constantly sum up experience and experiment, glass walls severed system to fire. high temperature must be within the framework of anti - bomb material support fixed glass in the event of fire. at the time of the explosion have enough time to ensure the integrity of the entire system. bullet - proof glass or glass does not fire in a short period of time due to damage fixed framework, a glass panel fell off, lost the fire or bomb - functional

    企業不斷的技術創新是我們發展的硬道理,也是我司一直保持林立於特種幕墻、隔斷系統前沿的核心, 2000年,我司發明的高強度單片銫鉀防火玻璃,經試驗檢測成功推向市場以來已有7個年頭,七年來特種(防火)玻璃幕墻、室內防火玻璃隔斷、防火玻璃門窗的設計、施工及十多年來的玻璃深加工,幕墻設計、施工及不斷的經驗總結和試驗,玻璃幕墻、隔斷系統要防火、防炸彈沖擊波必須要有耐高溫高強度的框架材料固定支撐玻璃,在一旦發生火災、爆炸的時候要有足夠的時間保證整個系統的完整性,不至於防火玻璃或防炸彈玻璃在短時間內由於固定框架破壞,而玻璃脫落,失去了防火或防炸彈的功能。
  11. Construction machinery. high temperature and low pressure oil - carrying pipe

    工程機械.高溫低壓輸油膠管
  12. Based on the studies, it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time. meanwhile, structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained. on the other hand, during the high temperature summer season or under other conditions promoting the mixture to form strength, continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time

    確認二灰基層材料與其它類型的基層材料相比,在施工時具有較長的施工碾壓成型時間,在一定時間里延遲成型的二灰基層強度不僅不降低,反而還有一定程度的提高;與此同時早期受到破壞的二灰材料在恢復整體性的條件下,結構強度能夠在很大程度上得到再恢復;另一方面,在夏季高溫季節以及在強化基層強度形成的前提下,二灰類基層和瀝青面層可以採用連續施工的方式在較短的時間里完成路面鋪築工作。
  13. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  14. High temperature mud is for the construction of various shaped products. different refractory material should be used with different type of high temperature mud in order to get strong sticking, good slag resistance and small gap

    高溫泥漿適用於各種定型製品的砌築施工,不材質的耐火磚選用不同牌號的高溫泥漿配合使用,具有粘結強度高,抗渣性能好,灰縫間隙小等特點。
  15. High temperature mud is for the construction of various shaped products. different refractory material should be used with different type of high temperature mud in order to get strong sticking strength, good slag resistance and small gap

    高溫泥漿適用於各種定型製品的砌築施工,不同材質的耐火磚選用不同牌號的高溫泥漿配合使用,具有粘結強度高,抗渣性能好,灰縫間隙小等特點。
  16. Sudan is located in torrid zone, the high temperature and strong sunshine have certain effects on the production of foam yellow jackets, so it ' s needed to improve the production and construction of foam yellow jackets

    蘇丹地處熱帶地區,氣溫高,陽光強烈,對泡沫黃夾克的生產帶來一定程度的影響,為此,需要對泡沫黃夾克的生產和施工進行改進。
  17. Supplementary requirements for seamless and electric - resistance - welded carbon steel tubular products for high - temperature service conforming to iso recommendations for boiler construction

    符合iso鍋爐結構推薦標準規定的高溫用無縫和電阻焊碳素鋼管形產品的補充要求
  18. Jinghong hydropower station rcc dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult

    摘要景洪電站地處亞熱帶,高氣溫時間長,大壩碾壓混凝土施工溫控難度高。
  19. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖壩段碾壓混凝土溫度控制標準,介紹景洪水電站縱向圍堰高溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。
  20. The latest research of the microwave high - temperature heating technology applied on theory and modeling, construction materials and functional materials are reviewed

    本文總結了近年來微波高溫加熱技術在理論與模擬、結構材料和功能材料方面的研究進展。
分享友人