hoisting gear 中文意思是什麼

hoisting gear 解釋
吊重索具
  • hoisting : n. 起重,提升。
  • gear : n 1 【機械工程】齒輪,(齒輪)傳動裝置,齒鏈;排擋。2 〈古語〉衣服;甲胄與武器。3 傢具;財物,動...
  1. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  2. Main product of this company includes more than 200 varieties and more than series such as mine shaft hoisting machine series, mine hoist series, dispatch hoist series, prop - pulling hoist series, building hoist series, flight conveyor series, heavy - load gear reducer series and electric equipment

    公司主要產品有:礦井提升機系列,礦用提升絞車系列,調度、回柱絞車系列,建築卷揚機系列,刮板輸送機系列,重載減速機系列,電氣控制設備等十幾個系列近200多個規格品種的產品。
  3. The manual introduced the total design and compute the process detailedly about the general design and the running gear design, which divided into altogether three chapter : chapter 1 for total design part of this crane, the main contents is each organization of crane and the metals structure patterns to really settle, and carry on the design to a structure of jib arm and counterbalance system by graphing method, including seeking the point, checking to calculate and school pit ; the second part is a design calculation that circulates the organization, including to circulate the organization to choose the type, the round presses calculation, the stability checking of the whole machine ; the third part is to choose the driving motion version of the hoisting mechanism

    說明書詳細的介紹了該型號起重機的總體設計及行走機構設計和計算過程,總共分為三章:第一章為起重機總體設計部分,主要內容是起重機各機構和金屬結構型式的確定,並用作圖法對臂架結構和平衡系統進行設計,包括了機構找點,驗算及校核;第二部分是運行機構的設計計算,包括了運行機構的選型,輪壓計算,整機穩定性校核;第三部分為起升機構的傳動方案選型和設計計算。
  4. Performance test and fault diagnosis of mine hoisting gear

    提升機系統性能測試及故障診斷
分享友人