hydraulic model 中文意思是什麼

hydraulic model 解釋
水工模型
  • hydraulic : adj. 1. 水力的,液力的;用水發動的。2. 液壓的,水壓的。3. 水力學的。4. 【建築】水硬的。adv. -lically
  • model : n 1 模型,雛型;原型;設計圖;模範;(畫家、雕刻家的)模特兒;樣板。2 典型,模範。3 (女服裝店僱...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. In the paper, river and the downstream area of dike are regarded as a whole system, and hydraulic model of coupling 1 - d river and gradual dike - break is established, therein the preissmann implicit difference scheme is applied to main river, and the fvm ( finite volume method ) is applied to the breach and polder

    本文將河道與堤壩下游區域視為一個整體,對于單一河道採用preissmann四點隱式差分格式計算,對于潰口及圩區採用有限體積法,建立了一維河道與堤壩漸潰耦聯的水力模型,也是一維、二維耦合的水流模型。
  3. Hydraulic model test of spillway in baiyinhua reservoir

    白音花水庫溢洪道水工模型試驗研究
  4. The application of the v - typed tailgate in unsteady flow hydraulic model

    型尾門在河工模型試驗中的應用
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  6. The results of hydraulic resistance and automatic measuring and controlling system presented by this paper have been applied to practical engineering hydraulic model research, forming a characteristics system

    本文關於水力阻力和自動測控系統的成果均應用於實際工程水力模型研究,形成了有一定特色的體系。
  7. The hydrauli c model of gradual dike - break simulates numerically the 2 - d flow of gradual dike - break waves. it shows the variation of flow field on breach, and the complicated flow characteristic of the propagation, diffraction, reflection and deformation of the dike - break waves. the hydraulic model can realistically simulate the burst process of dike, and computational accuracy is satisfied with the engineering demands

    本文建立逐漸潰堤的水力模型首次對二維逐漸潰堤波的流動問題進行了數值研究,揭示了逐漸潰堤過程中潰口處流場的變化情況,以及潰堤波的傳播、繞射、反射及變形的復雜運動特徵,能較好地模擬實際工程中的潰堤失事,模擬比較逼近於真實潰決過程,計算精度可滿足工程要求。
  8. Abstract : through a series of hydraulic model tests for researching actual power tunnel operation, a conclusion is reached that in order to get a better flow pattern the profile of the wate - carrying structure should be adapted to the variation of water streamline shrinkage, flow velocity and pressure intensity. the configuration and dimension of the kinetic energy dissipator should be selected carefully to make the water tunnel safe and reliable at different levels of diversion dischage

    文摘:針對實際工程中的發電引水隧洞運行的各種工況進行了水工模型試驗研究,指明要獲得良好的水流流態,過水建築物各部位結構輪廓的造型應適應水流流線的收縮、流速及壓強的變化;為使引水隧洞在各級引水流量下能安全可靠地運行,需慎重確定洞內消能工的體形和尺寸。
  9. The tail - water adjustment with recumbent flap gate has properties of fast response and wide adjustment, which is a common method of controlling tail - water in an unsteady hydraulic model

    採用翻板尾門進行尾水調節,具有反應快、調節范圍大等優點,是非恆定流水力模型控制尾水位一種常用的方法。
  10. The flow regime, sediment deposition and the loss of head of two head tanks of the sewage pumping station with different dimensions are studied by using a hydraulic model test method

    摘要採用水力模擬的方法對兩個不同結構尺寸的污水泵站高位井的水流流態、泥沙淤積及水頭損失等進行了模型試驗。
  11. The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests

    藉助系列水工模型試驗對水布埡放空洞的泄流能力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻坎消能工體型及下游沖刷等進行了較深入的研究、分析。
  12. The test on the hydraulic model of the spillway of shangjiao reservoir in lingchuan county

    陵川上郊水庫溢共道水工模型的試驗
  13. To choice good excavating scheme, this article engages in hydraulic model tests and numerical simulation on the movable bed

    為了選擇較好的清挖方案,本文對太平灣電廠下遊河道進行了動床水力模型試驗及動床水流數值模擬研究。
  14. Experimental research on the hydraulic model of tangjiawan reservoir ' s flood - discharge tunnel

    唐家灣水庫泄洪洞水工模型試驗研究
  15. In view of this problem, this paper curries out serials of hydraulic model test to fine out the mechanism of effect of roughened apron extension upon energy dissipation and erosion control

    因此,本論文針對這一問題,進行了一系列水工模型試驗以分析研究海漫加糙對消能防沖影響的機理。
  16. This study collected and discussed the results of three hydraulic model tests of long period oscillations in hwa - lien harbor, conducted by center of harbor and marine technology in 1996, 1997 and 2000

    摘要本文綜合港灣技術研究中心於1996 、 1997及2000年所執行有關花蓮港港池振蕩的研究計畫水工模型試驗成果部份,進行匯整及討論。
  17. Experiment study on hydraulic model of the water intake in ash depot of thermal power plant

    火電廠貯灰場排洪壩進水口模型試驗研究
  18. This essay is devoted to the research of arch netfloor stilling pond ' s hydraulic property and characteristic of energy dissipation through a series of hydraulic model experiments. the parameters of arch net floor gap rate, aperture, pore shape and thickness of net floor that have influences on the hydraulic property are discussed also, and advances hydraulic design method of arch net floor stilling pond

    本文通過水力學系列模型試驗,研究了拱網消力池的水力特性和消能特性,探討了拱網開孔率、孔形、孔徑、網板厚度等各項參數對水力特性的影響,並且提出了拱網消力池的水力設計方法。
  19. The paper also introduced the applied situation of the actual projects about the t type barrier stilling basin through the helong reservoir spillway ' s hydraulic model experiment

    本文還通過河龍水庫溢洪道水工整體模型試檢,描述了t形墩消力池在實際工程中的應用情況。
  20. Study of hydraulic model experiment of lining protection with slag splashing in lbe

    復吹轉爐濺渣護爐水模試驗研究