hydraulic power project 中文意思是什麼

hydraulic power project 解釋
水力發電工程
  • hydraulic : adj. 1. 水力的,液力的;用水發動的。2. 液壓的,水壓的。3. 水力學的。4. 【建築】水硬的。adv. -lically
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起拔器、液壓扳手、液壓拉馬、液壓小吊車、螺母破切器,濾油機和彎管機等先進實用的機電維修產品有世界先進水平,產品和技術廣泛應用於電力、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  3. The completed dissertation " research on inverter controlled hydraulic elevator energy - saving system applying pressure accumulators " is supported by national science foundation project - " foundation research of energy - saving and innovation system on mechanical / fluid power transmission " ( no. 59835160 )

    本論文完成的博士課題? ? 「採用蓄能器的液壓電梯變頻節能控制系統研究」來源於國家自然科學基金「機械流體傳動的節能及新型傳動方式的基礎性研究」 ( no . 59835160 )中的子課題。
  4. By the development of hydraulic power project, the system of hydraulic power station is more and more complex

    =隨著水電事業的發展,水電站系統變得越來越復雜。
  5. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  6. Shipping and hydraulic power should be developed concurrently in project of transmission of west power to east

    西電東送工程應堅持航運與水電開發並舉
  7. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  8. The design of ride control system is a typical project of system integration, the contents of the first year ' s research include mathematical model, control law, computer software / hardware, man / machine interface, control circuit, hydraulic power system and transmission mechanism design, a prototype had also been built to verify the stability and performance of the system

    本計畫將以船舶運動控制系統商品化為目標,研究控制器軟硬體系統之簡化,提升控制器硬體系統訊號傳輸之品質及側向穩定翼之機構設計,最後並期對運動控制器軟硬體分項功能與整體機構功能作驗證。
  9. In the third chapter, the mathematical models of project system have been established, and simulation has been done on the simulink enviroment of matlab software kits. the simulation focus on the effects of main parameters on the dynamic characteristics of speed control system, and the main parameters include viscosity damp coefficient and friction torque of electrical motor shaft, internal leakage coefficient of pump / motor of hydraulic circuits, gas volume of pressure accumulator, viscosity damp coefficient of cylinder piston and different running building floors, etc. at last, theoretical research effects of the flow and pressure pulsation of pump / motor on car speed and oil volume leakage theory are discussed. the fourth chapter of this thesis concerns the research on the key items about hydraulic power control system according to the ens 1 - 2 and other hydraulic elevator standards

    論文第三章針對組成系統的各個模塊進行了機理建模,並且通過matlab軟體中的simulink圖形化模擬環境進行了本課題系統的模擬研究,主要針對影響系統特性的主要參數變化,動態分析系統的輸出特性,在上下行工況中,分析了電機軸系粘性阻尼系數、軸系摩擦力矩、主迴路蓄能器迴路液壓泵馬達內泄漏系數、蓄能器氣體容積、液壓缸柱塞粘性阻尼摩擦系數以及不同運行樓層工況等參數對系統特性的影響;最後對軸向柱塞泵馬達的流量壓力脈動對電梯轎廂速度的影響和蓄能器內油液體積損失機理進行了理論研究。
  10. As a main participator in the design for and research on engineering the control system, in the project of eliminating ash with water in jianbi power plant, the author emphasized on the intelligent fault diagnosis for the complex hydraulic system by the background of that project in this paper

    本論文以作者參與的諫壁發電廠濕除灰控制系統的設計研究為工程背景,以柱塞泵為主要實踐對象,研究復雜液壓系統泄漏故障的智能診斷問題。
  11. For the practice of the water supply system of three gorges project construction, this study set up a microcosmic hydraulic model. at the same time, it set up the forecast model by the analysis of time series in water consumption both by day and by hour. and finally, the study states an optimal decision mathematics model, which aims at making the least power consumption during the water supply

    針對三峽工程施工供水系統的實際,本文建立了供水系統的微觀水力分析模型;同時,採用時間序列分析方法建立了日用水量和時用水量預測模型;最後,建立了以總耗電量為最優目標的優化決策數學模型,並採用動態規劃方法進行模型的尋優計算。
  12. In the part of the design of hydraulic loading system, constituting project of the hydraulic loading system of current test bench through comparing and analysing international and national current hydraulic loading projects and working out the pressure and flux of which according to the load and velocity and structure dimension of hydraulic executor - actuator. thus, choosing the power and hydraulic component and designing hydraulic loop

    在液壓加載系統設計部分,通過對國內外常用的幾種液壓加載方案的對比研究,最後確定了本試驗臺的液壓加載方案。根據液壓執行元件? ?油缸的外載荷、運動速度和結構尺寸我們便可以確定液壓加載系統的壓力和流量。
  13. The controlled object hyvp ( hydraulic pressure vibration platform ) has the property of big loading pressure and rating power, so it need considerable transmitted and control power, it also has the property of high - level math model, and narrow frequency width in closed - loop, and bad stability. this thesis is based on the hpvs in the “ tiema project

    被控對象(液壓振動臺)具有負載壓力和額定功率相當大的特點,因此要求傳輸和控制的功率要相當可觀;而且它還具有數學模型階數高、閉環頻帶寬度窄、穩定性差等特點。
  14. According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument

    針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互比較論證。
  15. Introducing and analysing the rebuilding project of the low pressure lube oil system, electronic and hydraulic system, and high pressure system, showing their advantages and disadvantages, after comparing their technical index, we finally determine the rebuilding project of the governing system of unit3 in feng zhen power plant - high pressure oil syetem. the

    針對目前個別電廠採用的低壓透平油系統、電液並存系統及高壓抗燃油的純電調系統改造方案分別進行了介紹和分析,對它們的優缺點進行了闡述,通過對各種指標的比較確定了豐鎮電廠3 #機組電調系統改造的最終方案一高壓抗燃油系統純電調方案。
  16. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利樞紐工程管理區內水工建築物的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「防洪(包括防凌) 、減淤為主,兼顧供水、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
  17. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽水電站的逐步建成和「西電東送」計劃的實施,我國的水電開發進入了高速發展的時期,大型巨型水電站不斷建成投運,超高壓遠距離輸電系統不斷增長,水電在我國電力系統中所佔比重越來越大。
  18. Guxian key hydraulic project will play important roles in flood prevention, sedimentation reduction, irrigation, water supply, power generation and so on

    古賢水利樞紐具有防洪、減淤、灌溉、供水、發電等重要作用。
  19. The world famous three gorge project was officially launched on december 14, 1994, and 26 700 mw hydraulic power generating sets were scheduled to be installed so that the first power generating set would start power generation in 2003 and the installation of all the 26 power generating sets would be completed by 2009

    舉世矚目的長江三峽工程於1994年12月正式開工,安裝26臺700mw水輪發電機組,計劃2003年第一批機組發電, 2009年建成,是一項跨世紀的宏偉工程。
  20. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    工程邊坡開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,塑性區主要分佈在壩頂高程附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定程度的應力調整,邊坡巖體表層產生了鬆弛變形,塑性區主要分佈在壩頂高程到坡頂前緣(永久邊坡)的v ivb類巖體分佈區。
分享友人