hydro period 中文意思是什麼

hydro period 解釋
水文周期
  • hydro : n 1 〈口語〉水上飛機(=hydroplane)。2 〈英俚〉水療處,接待水療病人的旅館(=hydropathic establi...
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  1. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  2. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採用長系列徑流資料,繪制了新老機組單獨運行和聯合運行調度圖,通過對比分析,建議採用聯合運行調度圖來指導水庫運行; ( 2 )在對石泉水庫水情測報系統和洪水預報系統的特點進行分析的基礎上,研究了洪水調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )洪水調度模擬模型研究與開發。
  3. Combining of the routine operation chart rule of hydro plant, which is used to control the storing or dispatching water quantity of the time period in a reasonable bound, the idcm proposed and the result derived from it is more reasonable

    結合水庫常規調度圖規則,對水庫時段蓄、放水量進行適當控制,以對原始判別式規則進行修正,使解算結果更為合理。
  4. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯流理論和水動力學方法預報太湖及重要節點水位,首次在平原河網地區建立了具有實時校正功能的全流域預報調度系統。以適合太湖流域復雜的水力條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  5. Through studying longyangxia reservoir reasonable operation mode, gongboxia hydro - power station ' s flood period scheme and improvement flood period standard scheme are established in this paper

    通過龍羊峽水庫合理運行方式研究,確定公伯峽水電站渡汛方案以及提高渡汛標準方案。
  6. Based on the test result of hydraulic model of a project, this paper analyzes the influences of gate operation during operating period, combined operation of hydro - generation sets and the length of guide wall on navigable flow condition in entrance area, and proposes the operation mode of the hydro - junction for improving navigation flow condition

    摘要根據實際工程的水工模型試驗資料,分析樞紐工程運行期的閘門調度、機組組合運行和導航墻長度對口門區通航水流的影響,提出改善通航水流條件的樞紐運行方式。
分享友人