hydroelectric power plant 中文意思是什麼

hydroelectric power plant 解釋
水力發電廠
  • hydroelectric : adj. 水力發電的。 a hydroelectric power station 水力發電站。n. -tricity
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外水電站自動控制裝置的研究和發展狀況,尤其是國內小型水電站的自動化現狀,針對現有電力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水電站內各種模擬參數和數字信號的實時監測功能,還對水輪發電機組進行了調控,通過與上位機處理程序的配合,可以實現水電站的自動發電控制、機組順序啟停;在測量發電機組機端電壓和電流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  2. A scheme to be formulated and submitted for approval to the harbour commissioners for the exploitation of white coal hydraulic power, obtained by hydroelectric plant at peak of tide at dublin bar or at head of water at poulaphouca or powerscourt or catchment basins of main streams for the economic production of 500, 000 w. h. p. of electricity

    有個建造水力發電廠的計劃:利用都柏林沙洲的滿潮噗啦呋咔272或鮑爾斯考特瀑布273的水位差主要河流的流域來開發白煤水力發電,經濟生產五十萬水馬力的電力。擬好后,將提交港灣委員會,以便獲得批準。
  3. They can be applied to electric power automatic control in many fields such as heat power plant, heat - electric generating plant, hydroelectric power plant, electric network, substation, pumping station, hydro - junction etc. and for electric power dispatching telecontrol system by telemetering and remote control, and field electric energy monitoring of the utilization and distribution equipment in numerous enterprises, can widely apply to electric power, water conservancy, metallurgy, petrochemical industry, chemical industry, railway, port, municipal administration, construction material, post and telecommunication, tobacco, papermaking, spaceflight base, civil aviation airport, hospital and school etc, many profession and field

    適用於火電熱電水電電網變電站所泵站水利樞紐等方面的電力自動控制和進行遙控遙測的電力調度遠動系統,以及眾多企事業單位用電配電設備的現場電量監控等。可廣泛應用於電力水利冶金石化化工鐵路港口市政建材郵電煙草造紙航天基地民航機場以及醫院學校等多種行業或領域。
  4. Develop service function of archives of hydroelectric power plant

    淺談拓展水力發電廠檔案館的服務功能
  5. Hydroelectric power plant automation - guide for computer - based control

    水力發電站自動化.計算機控制用指南
  6. Though the land of the prefecture of liangshan only accounts for 6 of the all the country, water energy resource theoretical gross of the prefecture reaches about 10. 5 % of the theoretical storage of all the country and 13. 1 % of the developable hydropower potential of all the country. it is supposed that we exploited the all developable hydropower potential of the prefecture of liangshan, annual energy output should be over 297 billion kw. h, then the annual average power consumption should be 230 kw. h to every chinese, and according to the shadow electric price of ertan hydroelectric plant, three gorges hydropower station and other hydropower station, the annual energy output will bring 74, 000, 000, 000 yuan industries production value for the prefecture of liangshan annually

    據樂觀預測,到2020年,全州用電負荷也僅在250 300萬千瓦之間,除開大型、巨型、超巨型水電站所開發的電力由國家統一購銷外,屆時中小水電站所開發的電力將形成800萬千瓦的供應能力,除在州內銷納300萬負荷外,至少還500萬千瓦的電力需要異地銷納,因此,將涼山中小型水電資源優勢轉化為經濟優勢,把水電資本轉化為經濟資本,推動涼山中小水電產業健康持續發展的關鍵在於不斷開拓水電營銷市場。
  7. Pumping water into the reservoir of a hydroelectric power plant may be a good way of storing energy captured by wind farms ( see article ) ? but what if there are no such plants to hand and no high - tension lines to reach them

    將水壓入水利發電站的水庫可能是儲存風電場所獲能量的好方法(見文) ,但是,如果沒有可蓄水的水利發電站或可傳輸電能的高壓電線,那麼情況又將如何呢?
  8. In general speaking, this paper has deeply researched the unit increasing capacity for improving hydraulic power utilization of our country, and this paper is a guide for unit increasing capacity working of gezhouba hydroelectric power plant and other hydroelecrtic plants

    總之,本文立足水電事業的發展,為提高我國水力發電機組水能利用率,對機組增容改造進行了深入的研究,對葛洲壩電站機組增容改造和其它水電站的機組改造工作具有指導作用。
  9. Based on the actual condition of gezhouba hydroeletric power plant, this paper points out the basic way for unit increasing capacity rebuilding of this plant after serious analysis and site review of lots of information of unit increasing capacity of hydroelectric unit at home and abroad. for this rerebuilding plan, we have made a lot of experiment and analyzed the data, the result show that the unit increasing capacity is necessary and feasible in this plant, additional, this paper describes project management, organization struture, management method, and evaluates this project value

    本文對國內外眾多水電機組增容改造資料進行了認真研究和實地考察;通過對水力發電機組增容改造技術的研究,結合葛洲壩電站實際情況提出了葛洲壩電站機組增容改造的基本途徑;針對葛洲壩電站機組改造方案,進行了大量的試驗,認真分析了試驗數據,用試驗結果充分證明了葛洲壩電站機組增容改造的必要性和可行性;本文還就該工程項目管理的必要性、組織結構、管理方法進行了闡述,並對該項目進行了項目評估。
  10. 2 the 1 - d hydraulics computational method and 2 - d shallow water equation are employed to simulate the processing of channel dredging in tai ping wan hydroelectric power plant. the results of model tests and numerical analysis are combined and compared each other

    採用一維水力學計算方法和二維淺水方程對大平灣電廠尾水河道開挖工程進行數值模擬,從而使模型試驗和數值模擬結合起來,相互比較。
  11. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述水電開發在減緩泥沙淤積、延長下游水電站壽命、調控水流、提高供水量、改善水質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川水電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性能的大型水電站、綜合利用好水資源,盡最大可能減少水庫淹沒損失,積極推進流域梯級滾動綜合開發,處理好水庫移民關系,減輕對環境的不利影響等六個方面論述了水電開發的可持續發展戰略。
  12. A curved floodgate to release floodwater is one of the important equipments of the hydroelectric power plant. the outdated measuring apparatus of the floodgate ' s opening has low precision and reliability

    弧形泄洪閘是水電廠的重要設備之一,老式的閘門開度測量儀的測量精度低,可靠性差。
  13. The observed information is fully analyzed, therefore we can confirm that the present running state of manwan hydroelectric power plant is elastic state. the built model is very important to carry through the later calculation

    因此對觀測值的處理方法進行了介紹,對漫灣電站的觀測資料進行全面分析,確定出漫灣電站目前的運行狀態是在彈性階段,以及壩體與基巖之間的關系。
  14. Applications of plc programmable controller and supersonic positioner for the pressure - adjusting well gates control of hydroelectric power plant

    可編程式控制制器及超聲波物位計在水電廠調壓井閘門控制中應用
  15. While the scientific technology developing at a tremendous speed, the level of hydro - generator manufacturing is increasing. now the f - class insulation standard for generator is adopted, and cad for hydraulic design has spread, and advanced theory in hydraulic design is applied, and insulation materials are discovered, and precise processing techniques are under research. in the hydroelectric industry it ' s necessary to increase the generating units " installed capacity to take advantage of an old power plant and to raise the utilization ratio of water power energy

    隨著科學技術的飛速發展,水力發電機的生產製造水平日益提高, f級絕緣在電機中的運用;計算機cad輔助水力設計的推廣,先進的水力設計理論的應用,新的電氣絕緣材料的發現,精密的加工工藝的研究,為了提高水能利用率,使老電站煥發青春,機組增容改造已是水電事業發展中一項不容忽視的工作。
  16. Abb is installing protection and control systems to modernize the guri power plant in puerto ordaz, venezuela, the second largest hydroelectric plant in the world

    Abb正在為世界上第二大的水力發電廠? ?委內瑞拉古里發電廠安裝現代化的保護和控制系統。
  17. Guide for computer - based control for hydroelectric power plant automation

    水力電力發電廠自動化用計算機控制指南
  18. According to this situation we decide to establish a power company to generate electricity and sell it. the main business of the company is to develop small hydroelectric power plant, and transform dc exciter generator that is put into use before 1980

    針對這種情況,我們準備在四川樂山成立一家以電力生產為主的發電公司,主要經營小水電開發及八十年代以前投產發電的具有直流勵磁機的發電機組改造,可以獲得較高而且穩定的投資收益。
  19. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工,工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
  20. The codes of the software were developed after the mathematical models of controlled objects and electro - hydraulic servo system are successfully constructed. through the closed loop simulation test ( based on parameters of an actual hydroelectric power plant ) of the simulator linked with the pcc regulator, the effectiveness of the simulator software and pcc regulator software is confirmed

    在建立調節對象和電液隨動系統的數學模型后完成模擬儀軟體的編制工作,並將模擬儀和微機調節器進行閉環對接,利用某真實電站的參數進行模擬試驗,對模擬儀軟體和微機調節器軟體進行測試,驗證其有效性。
分享友人