identification of project 中文意思是什麼

identification of project 解釋
工程標識
  • identification : n. 1. 認出,識別,鑒定,驗明(罪人正身等)。2. 【心理學】自居作用。3. 身分證。4. 【數學】黏合,同化。
  • of : OF =Old French 古法語。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. In these years, image measuring has been used in every walk of life gradually. this paper discusses the characteristic, the virtue and the application of digital image measuring. in this paper. after analyzing the practical situation and theory, it has confirmed the project that identify automatically the pointer and the reticle of the pressure gauge with technique of optic photographic system, image process and automatic identification

    近年來,圖像測量逐漸應用到各行各業。本文討論了數字圖像測量的特點、優點及應用范圍,結合實際情況和理論分析,確定了利用光學攝像系統和圖像處理、識別技術,自動識別壓力表的指針和刻線的方案,解決了壓力表示值的自動檢定問題,研製了一套集計算機、圖像處理和識別、自動控制和光學等技術於一體的壓力表示值的自動檢定系統。
  2. In mid - 1996, the lands department initiated the systematic identification of maintenance responsibility of slopes in the territory ( simar ) project

    一九九六年年中,地政總署展開系統性鑒辨本港斜坡維修責任計劃。
  3. As to the current problems existing in the identification for these flutter derivatives, the dissertation tries to trace the development in the identification for the past unsteady aerodynamic forces of long - span bridges. it also investigates the method for flutter and buffeting analysis and the flutter derivatives. based on the present methods used in obtaining the unsteady aerodynamic forces and flutter derivatives, and co - funded by a natural scientific fund from the nation and a key project fund from the railway ministry, the current research has attempted to develop a device which can be employed in the wind tunnel to test flutter derivative through a forced vibration method

    鑒于目前橋梁斷面顫振導數識別的水平和存在的問題,本文通過對大跨度橋梁非定常氣動力、顫振分析方法及顫振導數識別方法的回顧和評述,基於現有的非定常氣動力和顫振導數的測試方法,在國家自然科學基金與鐵道部重點學科基金的聯合資助下,研究開發了一套在風洞中採用強迫振動法測試顫振導數的裝置。
  4. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在深入分析了風險特徵之後,將數據挖掘技術引入風險管理,用以解決海量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人工神經網路( ann )兩種方法;接著,論文對風險識別、風險評價、風險處理中的風險管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了風險管理的特點;最後,論文對信息系統( mis )在工程項目風險管理中的應用進行了探討,開發出一個風險管理信息系統。
  5. An advanced software platform with the parameter identification as its core has been developed for load modeling. this software platform has been practiced in the engineering project of load modeling for zhangjiakou area, as well as the national power grid key project of load modeling for the north east of china

    基於論文所建立的理論,已開發了以參數辨識為基礎的系統的負荷建模軟體平臺,基於該軟體平臺先後完成了張家口地區電網負荷特性建模和東北電網負荷建模工作。
  6. " the project aims to develop middleware for manufacturing, retail and distribution companies in the prd region to integrate rfid radio frequency identification data with back - end systems, business processes and logistics and scm supply chain management solutions, " said professor tan chung - jen, director of eti, hku. " eti will head the development of the core technology and collaborate with partner universities to develop applications and pilot projects with local enterprises in the region.

    這個專案的目的是為珠三角地區的製造、零售、物流等行業開發一套中間件,將rfid資料與企業的后臺系統、商業過程以及物流和供應鏈管理等系統集成一起,香港大學電子商業科技研究所( eti )總監譚崇仁教授指出, 「 eti將領導核心技術的研發工作,與合作大學一起開發應用程式,並在珠三角地區的企業中實施試驗專案。
  7. In order to achieve the above objectives, project implementation will be organized based on the scientific logic of mechanism identification - process simulation - control basis - objective response

    為實現上述研究目標,將按照「機理識別過程模擬調控基礎目標響應」的科學邏輯組織實施。
  8. The massive research project will involve the collection, identification and computer analysis of about 100, 000 dna samples ? prehistoric, historic and contemporary

    廣眾調查計劃包含對十萬份史前的、古代的、當代的dna樣本,收集、鑒別、計算機分析。
  9. It is planned quality management system for midea refrigerator oem project in the study. the planning process includes identification of process, designs of management flow chart and management items, plan of implement step

    基於對美的冰箱oem生產的實際情況的了解,為建立現代化的oem質量管理體系進行質量策劃,包括管理過程的識別,管理流程與內容的設計,實施步驟的規劃,組織機構的規劃,質量管理體系文件的策劃等。
  10. The system theory is adopted to research risk management methods of a large type scientific research project, pointing out that risk management of a large type scientific research project is a sort of synthetical management theory, and method of risk identification, risk estimate and risk response of the project

    指出重大科研項目風險管理是一種綜合性的管理活動,並得出重大科研項目的風險識別、風險分析與風險處理的方法。
  11. Project participants shall submit a proposal for a new methodology to a designated operational entity by forwarding the proposed methodology in a draft project design document ( cdm - pdd ), including the description of the project activity and the identification of the project participants

    項目參與者應向指定的經營實體提出新方法建議,具體做法是將所建議的方法寫入項目設計書( cdm - pdd )草案,包括描述該項目活動和列明項目參與者。
  12. Risk identification of timeshare project based on life cycle

    基於生命周期的分時度假項目風險識別
  13. Sub - project : " overexpression of xanthomonas campestris proteins for structure determination and identification of novel regulatory genes that trigger sos response in e. coli.

    分項計劃: "植物流原菌基因的大量表現及參與誘導緊急求救反應基因的?定與功能性分析" 。
  14. This paper tells an evaluation method based on statistical analysis of geology data ? according to the history of geology change and analysis of project geology about the research section of lidu slope of hurong national highway located in south - west of hubei province, based on abundant actual investigation and experimental data, stressing on tracing the history and rules of development of slope change, we divide the data of investigation and test into two classes, one is external physical feature and structural performance, the other is factor of internal and external dynamic environment, following the analysis of mathematics statistical analysis, which points out the proportion of foundation of geology judgement and puts forward a valid identification beacon of stability

    本研究內容是一種以地質數據統計分析為基礎的評價方法。根據滬蓉國道南里渡滑坡研究區段的地質歷史演變結合工程地質類比法,以豐富的實際勘察、試驗資料為依據,以追索滑體的演化歷史和發展規律為重點,將滑體的勘察、試驗資料劃分為外部形態與結構性狀和內外動力環境因素兩大類,通過數理統計分析,給出地質判據的權重,提出切實可行的穩定性判別標志。從而對斜坡穩定性提出合理的、有說服力的綜合評價。
  15. First, the conception, characteristic and classification of risk are summed up, the risk of engineering investment project and the theory of risk analysis are introduced and the function of risk evaluation is pointed out ; secondly, risk factors are analyzed particularly from the perspective of the system and the source of risk, the direct action body of risk, the influence of goal which made by the risk and the process of project management separately ; thirdly, after the risk identification, the investor must make evaluation whether the investment is successful or not and take measures to avoid the risks according to it

    本文首先對風險的概念、特徵以及分類進行歸納總結,並介紹工程投資項目的風險以及風險分析的理論,指出風險評價在工程項目投資中的作用;然後分別從系統角度和風險來源、風險直接行為主體、風險對目標的影響、項目管理的過程多個角度對工程投資項目的風險因素進行具體分析;在對工程投資項目風險因素進行辨識之後,投資者面臨某一投資項目,要對投資成功與否做出評價,並以此為依據對風險採取規避措施。
  16. Partnership with cooperative organizations, including education management training, teacher placements, and agent education and familiarization ; moes language teacher project, including the identification of cooperative support in canada for bicer moes english - language teacher recruitment needs

    後於1996年創業,成立phoenix technologies incorporated ,將一個專利光學感應技術發展成為現今聞名的即時光學3d動作捕捉系統。
  17. 2. a back analysis method for parameter identification of materials is suggested and practiced combining analytic solutions or fem solutions with optimal mathematic method. an experiment of temperature field of a concrete block is made for a practical project, and the back analysis for unknown parameters is carried out successfully

    研究了用解析解或有限元數值解結合數學優化理論進行反演分析的方法,並具體對某工程進行了立方體混凝土塊溫升實驗,再用有限元對某些事先未知的材料參數進行了反演確定。
  18. While develop the flow of project management to improve in type project of military plan, firstly study implementation of process improve of type developing project of military plan, including principle, the measure and factor influencing process improve ; secondly explain goal of process improve and develop structure of organization of type developing project of military plan of xac ; thirdly develop organizational building and environmental building of type developing project of military plan of xac, and go on identification and describing, analysis and diagnosis, improving of project management process of type developing project of military plan of xac ; at last describe the implementation measures of improved process and set up the evaluated model of process improved of type developing project of military plan of xac

    在軍機型號研製項目管理流程優化過程中,論文首先研究了軍機型號研製項目管理流程優化的實施策略,主要包括流程優化的原則、步驟以及影響流程優化的因素;其次,闡述了軍機型號研製項目管理流程優化的目標及對軍機型號研製項目的組織結構的設計;然後,研究了軍機型號研製項目管理流程優化的組織建設和環境建設,並且進行了軍機型號研製項目現有管理流程的識別與描述、分析與診斷和流程優化;最後,描述了優化后流程的實施步驟,及建立軍機型號研製項目管理流程實施效果評價模型。
  19. Major venture factors should be found after venture identification and quantification, countermeasures should be worked out and ventures should monitored timely during the implementing of project in order to elude risks as best as one can

    通過風險識別、風險量化,找出主要風險因素,制定出風險對策,並在項目實施過程中及時進行風險監控,以盡量規避風險。
  20. For the training of professional system, the identification of suppliers, and the practical project, sv has the professional project engineers advanced in the av technique in china, who can offer blue print of design, installation, training and the maintenance of chip level

    專業系統的培訓與廠商認證及豐富的實際工程經驗,索訊擁有國內最早從事av技術的工程技術人員,能夠為客戶提供方案設計、安裝、培訓與晶元級維修
分享友人