in-site 中文意思是什麼

in-site 解釋
原地
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Crack - control of aeolotropic hollow slabs in orthogonal in - site concreting deck floors in the construction of large - pillar - net structure of reinforced concrete

    大柱網現澆混凝土框架正交異性空心大板樓蓋的裂縫控制
  2. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層頂面起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字板剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  3. The structure and the construction method of a new type of fascine are introduced herein, of which the advantages are as the follows. ( 1 ) the shortages of the complicated construction process and low construction progress with low efficiency are overcome. ( 2 ) the fascine cage can be industrially made, so as to reduce the working procedure in site. ( 3 ) the heavy construction equipments can be used for the mechanical construction of the single large size fascine cage with high construction speed and intensity. ( 4 ) it is favorable to the environment protection as the amount of the fascine material being decreased

    摘要介紹了新型埽工籠埽的結構形式、施工方法,其優點為: ( 1 )克服傳統埽工施工工序復雜、速度慢、效率低的缺點; ( 2 )籠埽可工廠化生產,減少現場作業工序和作業面后移; ( 3 )充分利用大型施工機械進行大體積單個籠埽結合機械化施工,作埽速度快、強度高; ( 4 )減少柳料用量,利於環境保護。
  4. Gosden j, lawson d. rapid chromosome identification by oligonucleotideprimed in site dna synthesis ( prins ) [ j ]. hum mol genet, 1994, 3 : 931

    趙曉嵐,葉國玲,楚雍烈,等.產前篩查和基因多態性位點在唐氏綜合征產前診斷中的應用[ j ] .中國優生與遺傳雜志2003 , 11 ( 2 ) : 49
  5. In the meantime, the tolerance limit of coordinate difference in the station for site testing is given and it is possible to test total station coordinate trave rse in site

    同時,根據該原理,給出了測站坐標差限值,從而實現了全站儀坐標導線的現場檢核。
  6. In site testing of continuous welded turnout

    無縫道岔現場測試分析
  7. ( 1 ) how to prefabricate mullite whisker formed in - site to enhance ceramics intensity, improve thermal - shock resistance by adoption zirconate and alumina to sinter mullite / zirconia / alumina composite ceramics. ( 2 ) studying on the plasticity of high alumina body materials

    利用氧化鋁、鋯英石原料燒成氧化鋁氧化鋯莫來石復合陶瓷,通過原位生成莫來石晶須提高載體的強度、改善其抗熱震性。
  8. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  9. This article introduces the application of explosive technique on the handling of hammer stuck accident and the engineering practices about acceleration of percussioned cast - in - site piles construction using loose explosion

    摘要本文介紹爆破技術在處理沖孔灌注樁卡錘事故中的應用以及利用松動爆破加快沖孔灌注樁施工的工程實踐。
  10. The main conclusions are remarked as follows : ( a ) the theory formula between the ultimate tensile force and interface cohesive intensity has been established. according to ultimate tensile force from in - site measure, the scientific interface cohesive intensity parameter has been achieved, then, the numerical analysis of the tension - draw test has been made

    主要研究成果: 1 、從理論上建立拉拔試驗中「極限拉拔力」和「界面粘結強度」的關系,再藉助現場實測的極限拉拔荷載,獲取釘土界面的合理粘結強度參數,對拉拔試驗進行數值模擬分析,驗證了模擬模型中界面單元的可靠性和精度,並標定了數值試驗中土釘的破壞模態。
  11. Based on the cause analysis for failure of water stop of tunnel ' s cast in site circular construction joint from theoretical and constructional point of view as well as the working mechanism of expansive water stop proposed in terms of width of construction joint, the relation between width of circular construction joint and water pressure resistance of water stop is established and its model test carried out

    首先從理論和施工角度分析了隧道現澆環向施工縫止水條的失效原因,然後從施工縫張開度的角度提出了膨脹止水條止水的原理,在此基礎上建立了施工縫張開度與止水條抗水壓力之間的關系,並進行了模型試驗。
  12. The technique and application of the cast - in - site bored pile post - grouting construction

    薄壁沉井法在挖孔樁基礎施工中的應用
  13. How to distinguish the sliding zone from a loess landslip relied on the technician ' s experience in - site. 4 typical loess landslides located in jingyang county along jinghe river, named dongfeng landslip, shutangwang landslip, xiuchidu landslip and taiping landslip were studied through in - situ measurement and sample tests to identify the sliding zone

    摘要以陜西徑陽縣徑河沿岸4個典型黃土滑坡為研究對象,通過現場勘察和采樣試驗,探尋滑帶土的物理特性和結構特徵差異,以期在實踐中為確定滑動面位置提供可靠依據。
  14. Measured results from in - site loading tests in tannin harbor and from in - door model tests were compared with predictions from the limit equilibrium methods. a method of estimating the bearing capacity for inhomogeneous medium was suggested to meet every case ; 4. according to the results from model tests, the elastoplastic fem were performed to study the procession of the change of the stress and strain in inhomogeneous medium and to simulate the procession of the forming of the failure surface during loading, and the failure mechanism was studied ; 5

    4 、結合模型試驗結果,確定出了符合非均質介質規律的彈塑性模式,在此基礎上分別運用二維、三維彈塑性有限元程序,模擬出了外荷載作用過程中非均質介質內部應力、變形以及破壞面的發展過程,分析得出了非均質介質地基的破壞機理; 5 、在港口工程地基設計當中,已經引入了可靠度理論計算分析基礎穩定性。
  15. Performance tests in site for the large boiler feedwater pump

    大型鍋爐給水泵性能現場試驗方法
  16. Abstract : various measurement methods of the capacity of gas discharge forpiston type compressor are analized and compared. the orifice choke device that is suitable for measurement in site is recommended emphatically. in combination with the example of measurement in site, the matters needing attention of measurement in site on the capacity of gas discharge for compressor are point out

    文摘:對活塞式壓縮機排氣量的各種測量方法進行了分析比較,著重介紹了比較適合於現場測量的孔板節流裝置,並結合現場測量實例指出了壓縮機排氣量現場測量應注意的問題。
  17. The method for design thin - wall core box cast - in - site concrete hollow floor using common structural computing software is put forward and the scale for the magnifying stiffness coefficient of the spandrel beam and middle beam is discussed

    5 、提出了採用常用的結構計算軟體計算薄壁箱體現澆混凝土空心樓蓋設計的方法,提出了邊梁和中梁剛度放大系數的建議。
  18. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  19. Research on commercial concrete shrinking in site plates

    現澆商品混凝土樓板收縮變形研究
  20. Thin - wall core box cast - in - site reinforce concrete hollow floor is a new type floor in which high strength thin - wall core boxes were laid as the certain rule

    薄壁箱體現澆混凝土空腹樓蓋板柱體系是一種在現澆混凝土樓板中按規則布置一定數量的永久性剛性薄壁箱體而形成的新型空心樓蓋體系。
分享友人