intake dam 中文意思是什麼

intake dam 解釋
分水壩
  • intake : n 1 吸入,納入,收納。2 進水口 (opp outlet); 輸入端,(礦井的)進風巷道,通風孔。3 吸氣,進氣。...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Power intake dam section foundation impervious curtain grouting in the dachaoshan hydropower plant

    大朝山水電站進水口壩段壩基防滲帷幕灌漿施工
  2. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  3. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是高壩大庫的高水頭電站,還是低水頭河床式樞紐,電站進水口的取水排沙歷來是一個倍受關注的問題。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
分享友人