kwun tong line (mtr) 中文意思是什麼

kwun tong line (mtr) 解釋

  • kwun : 觀冠官
  • tong : n 〈用 pl 〉夾子,鉗子。 fire tongs 火鉗。 a pair of tongs=a tongs 一把鉗子。 would not touch wi...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • mtr : 材料試驗反應堆
  1. Kwun tong line mtr station take it only

    只限觀塘線地鐵站交收
  2. The mtr was subsequently expanded to include tsuen wan line ( 1982 ), island line ( 1985 ) and the eastern harbour crossing rail tunnel ( connecting kwun tong to quarry bay ) ( 1989 )

    地下鐵路觀塘線的首部載客列車在一九七九年底投入服務,其後,荃灣線、港島線和東區過海鐵路隧道(連接觀塘和
  3. The first passenger train on the kwun tong line of the mtr started operation in 1979. the mtr was subsequently expanded to include the tsuen wan line ( 1982 ), the island line ( 1985 ), the eastern harbour crossing rail tunnel connecting kwun tong to quarry bay ( 1989 ) and the tung chung line ( 1998 )

    地鐵觀塘線載客列車在一九七九年投入服務,其後,荃灣線、港島線、東區過海鐵路隧道(連接觀塘與?魚涌)和東涌線先後在一九八二、一九八五、一九八九和一九九八年通車。
  4. The mtr connects with the kcr east rail at kowloon tong station kwun tong line and with the kcr west rail at mei foo station tusen wan line and nam cheong station tung chung line travel passes

    地下鐵路設有多個轉駁站:九塘站觀塘線可轉九廣東鐵,美孚站荃灣線和南昌站東涌線可轉九廣西鐵。
  5. Kwun tong line, the first passenger line of mtr providing mass transit service to kwun tong, started operation in late 1979

    地下鐵路首條客運線是觀塘線,在1979年底開始運作,提供集體運輸服務至觀塘。
  6. Mtr, consisting of kwun tong line, tsuen wan line, island line, tung chung line, airport express line, tseung kwan o line and disneyland resort line carried average daily passengers of about 2, 370, 000 in 2005

    地下鐵路包括觀塘線荃灣線港島線東涌線機場快線將軍澳線及士尼線。在2005年,地鐵平均每日載客量約為2 , 370 , 000人次。
  7. The opening of tseung kwan o mtr line and the future west rail will further enhance kwun tong s transportation network, linking millennium city to all areas of hong kong. air - conditioned pedestrian footbridge millennium city is well served by air - conditioned footbridges linking ngau tau kok and kwun tong mtr station with respective phases and offer a speedy and comfortable passageway for tenants and visitors

    創紀之城2 , 3期一樓大堂相互連接, 3期租戶可使用2期的冷氣行人天橋往返寫字樓及牛頭角地鐵站,創紀之城5期亦有冷氣天橋連接觀塘地鐵站大堂及裕民坊,盡享地利。
  8. The kcr has a route length of 34 km and connects hung hom with lo wu. it has an interchanging station at kowloon tong where passengers can transfer to kwun tong line of the mtr

    九廣鐵路全長約34公里,連接紅?與羅湖。乘客可於九龍塘交匯站轉乘地下鐵路。
  9. East tsim sha tsui and kowloon tong are the interchange stations with mtr tsuen wan line and kwun tong line respectively

    尖東和九塘分別是接駁地下鐵路荃灣線和觀塘線的交匯站。
分享友人