  1. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  2. You can fine - tune task links - and make sure you do n ' t gum up the clockwork - by using lag time and lead time

    使用「前置重疊時間」和「延隔時間」調整任務鏈接,並且確保那些鐘表裝置不會粘上油漆。
  3. For example, the exhibit planner might add lag time between painting a wall and hanging clocks on the wall, because the planner knows the paint will take time to dry

    譬如,展覽會的計劃者可能在粉刷墻壁和在墻上懸掛鐘表之間添加延隔時間,即塗料乾燥所需的時間。
  4. By using lead and lag time, you can make your schedule more accurate, and you may be able to shorten it as well

    使用重疊時間和延隔時間后,日程將更加準確,同時也可能縮短日程。
  5. Other factors may include, but not be limited to, work contours, task calendars, lead and lag time, and task constraints

    其他因素還包括工時分佈、任務日歷、前置重疊時間和延隔時間以及任務限制(但不局限於此) 。
  6. ( you can also specify lead and lag time. ) for information about linking tasks, see chapter 5, " getting tasks done in the right order, at the right time.

    有關鏈接任務的內容,請參閱第5章「按恰當的順序和時間完成任務」 。
  7. The time required for the shock to travel to its final position is known as the lag time.

    沖波移動到最後位置所需的時間稱為滯后時間。
  8. We test the lag time every 100 meters with calcium carbide dropping

    我們每100米用電石投測一次遲到時間。
  9. Through the establishment of var and vecm model and the analyzing of granger causality relationship both long time and short time, the stability of model, impulse response function and etc. we conclude that there is not any monetary indicator that has significant influence both in long term and short term ; if we choose interest rate as the monetary indicator, we will have long term influence but long lag time as well ; but if we select loan as the monetary indicator the performance will at verse, the short time influence while the short lag interval

    通過建立對商品房銷售額、上海住宅銷售價格指數與各貨幣政策中介目標的var模型與vecm模型,分析變量間的長期與短期granger因果關系,模型穩定性與脈沖相應函數等,本文認為在房地產市場中不存在長期和短期都有效的某一貨幣政策中介目標;以利率為中介目標則滯后時間較長但影響力持續時間也較長;以貸款為中介目標則滯后時間較短但影響力持續時間也較短。
  10. Moreover, its interior pll circuit substitutes traditional pll. as a result, the presented design not only overcomes some shortcoming of traditional circuit such as tracking speed and accuracy, but also gets rid of response lag time and multi - phase noise. the system design is also important to improve our country ' s fault diagnosis standard

    而該系統內部鎖相電路代替了傳統方法中的pll ,因此,提出此系統設計不僅能夠克服基於傳統鎖相環電路的等轉角采樣方法跟蹤精度低、速度慢和使用不便等特點,還能克服電路中的由於不可避免的響應延遲時間所導致的不適合快速的列車運行及過多的相位噪聲問題,對于推動我國鐵路故障在線診斷技術的應用普及具有重要意義。
  11. For example, if you need a 2 - day delay between the finish of one task and the start of another, you can establish a finish - to - start dependency and specify a 2 - day lag time

    譬如,如果從一個任務完成到其後續任務開始需要2天,就可以為該任務建立完成-完成相關性,並指定延隔時間為2天。
  12. To add lead or lag time

    如果要添加前置重疊時間或延隔時間:
  13. Use minute, hour, day, week, or month for the lead or lag time units

    前置重疊時間或延隔時間的單位可以是分、小時、工作日、周或月。
  14. You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration

    可以使用時間單位或前置任務工期的百分比來表示前置重疊時間或延隔時間。
  15. After you enter tasks and assign dependencies to them, analyze your schedule and look for instances where you can apply lead or lag time

    輸入任務並指定相關性后,應分析日程並查找需要應用前置重疊時間和延隔時間的情況。
  16. If a task must start or finish on or near a specific date, just linking tasks and adding lead or lag time might not do the trick

    如果任務必須在(或接近)特定日期開始或完成,則簡單地鏈接任務和添加提前或推遲的日期可能無法達到目的。
  17. In most situations, you can schedule tasks to occur at the right time by listing them in logical order, linking them, and adding lead or lag time

    大多數情況下,排定任務日程的步驟是:將任務按邏輯順序排列,鏈接它們,然後添加提前或推遲的日期。
  18. The time gap, or delay, between tasks is called lag time

    使用microsoftproject ,可以在任意兩個鏈接任務間添加前置重疊時間或延隔時間。
  19. The elderly aged 65 years had a shorter lag time to develop asthma exacerbation following exposure to pollutants than those aged 65 years

    至於哮喘惡化的速度, 65歲或以上的長者比起65歲以下的人士明顯較快。
  20. Other systems may provide archival quality data but perhaps with a variable lag time

    其它的一些系統也許可以提供高質量的檔案數據,但是或許會存在不可知的滯后時間。
分享友人