layer filling 中文意思是什麼

layer filling 解釋
分層裝料
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  1. The i / s mixed layer and illite occur as pore lining and pore filling, while kaolinite occurs as pore filling

    I s混層與伊利分佈於孔喉處或充填孔隙,而高嶺石主要充填于孔隙中。
  2. Black forest cake wonderful chocolate layer cake which is soaked in kirsch liqueur, with cherry filling

    層層疊疊的巧克力海綿蛋糕和德國黑櫻桃果蓉,加上淡雅的天然淡奶油,將微酸與苦甜的滋味融合得恰到好處。
  3. Guangdong : chicken cake, preserved egg shortbread, a - thousand - layer shortbread with frozen meat, guangdong mooncake, lotus seed paste in crisp pastry, steamed hedgehog stuffed bun, fenguo. dumpling with fresh shrimp filling, examination success porridge, steamed shaomai with the ovary and digestive glands of a crad, and white rabbit shaped dumpling

    廣東的雞仔餅皮蛋酥冰肉千層酥廣東月餅酥皮蓮蓉包刺猥包子粉果薄皮鮮蝦餃及第粥玉兔餃干蒸蟹黃燒麥等。
  4. Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area

    通過孔徑與管徑的調配設計,增大環狀粒料層和止水粘土層的厚度;濾水管外包尼龍紗網;粒料與止水粘土接觸界面上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投粘土球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地區人飲水井施工提供技術示範作用。
  5. ( 3 ) based on a close research of the cad model representation in mdt, this paper picks up the model information expressed in the boundary representation ( b - rep ) using the development kits of objectarx and mdt api offered by autodesk inc. ( 4 ) the direct slicing data are processed so as to realize the sorting and fitting of short lines, the cutting tool compensation, the layer contour filling and the optimization of the scanning paths, etc. ( 5 ) designs the architecture of rp data processing software according to the functional requirement of rp, and integrates all the functional modules

    ( 3 )在深入研究mdt ( mechanicaldesktop )中三維模型表示方法的基礎上,運用autodesk公司提供的mdt二次開發工具objectarx和mdtapi ,成功地實現了對mdt模型信息的提取,進而使直接自適應分層演算法得以實現。 ( 4 )對直接分層得到的數據進行了工藝規劃。實現了對層片輪廓線段的排序、擬合、刀具補償以及輪廓內部填充和掃描路徑優化等。
  6. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋樁孔,以及其它各種大直徑成孔施工。
  7. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩餘量、地下水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝土板下鋪設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於工程實踐。
  8. Gently press second layer of lady fingers cookies and the rest of the mousse filling

    倒入一半的抹茶慕斯餡,接著再鋪上一層手指餅干,同樣也留出1厘米的距離。
  9. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注樁施工的方法
  10. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面的方法,分析土體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回填土體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。
  11. Three kinds of springs were used to imitate different lateral stiffness of soft ground, and special drawers with sliding path were modeled as lateral displacement pile of embankment during its filling periods, with the function of reinforced - mat considered. on the basis of the data of tests designed by thogonal table l9 ( 34 ), three kinds of ( factor, depth of layer, loading ) state matrixes are obtained which could be used for procedure analysis by making use of the principle of information matrix conformation

    用彈簧模擬土體的側向剛度,用可滑動的特殊抽屜模擬軟基填築路堤坡腳的邊樁,並基於對邊樁側向位移速率影響程度室內模型試驗測試數據,利用信息矩陣構造原理,構造了總攬全局的、可用於過程分析的三種(因素、層位和荷載)狀態矩陣。
  12. Based on two - layer zone model, the mathematical model of atria smoke management system, including smoke filling, gravity venting and smoke exhaust, was developed. by using matlab computer language, a program was developed

    論文以兩層區域模型為基礎,對中庭煙氣填充,自然排煙,機械排煙過程分別建立了數學模型;採用matlab語言,編制了中庭煙氣管理系統的計算機模擬程序。
  13. Firstly, backing with double - sided in - phase welding, welding method is gtaw. secondly, after filling outside one layer, welding with saw. finally, weld the inside with saw

    先用雙面同步焊打底,焊接方法為鎢極氬弧焊;然後外側用焊條電弧焊填充一遍后再用埋弧焊焊接;最後用埋弧焊焊接里側。
  14. According to the analysis of dynamic characteristics of these seismic soil - layer structures, it was proposed that failure functions of foundation caused by strong earthquakes included liquefaction, seismic fissure filling, vibration falling, fracturing and seismic settlement of soil

    根據這些強烈地震成因土層構造的動力學特徵進行分析,認為強烈地震對地基土的破壞作用有幾種方式:液化作用、地震裂隙充填作用、振動塌落作用、斷裂破壞作用和震沉陷落作用。
  15. Through the field observation and comparative seism - geologic studies, many seism - genesis soil - layer structures such as vibration - liquefied sand vein, vibration - liquefied sand dyke, sandy cobble dyke by fissure filling, seismic fall mass, seismic intra - layer fault and seism - settlement structures etc. were recognized

    通過野外觀測和比較地震地質學研究,識別出了振動液化砂脈、液化砂墻、裂隙充填砂質卵石墻、震塌落體、地震層內斷裂及地震沉陷構造等地震成因土層構造。
  16. To control the settlement of roadbed, the degree of compaction regulated by current criterion is not enough, the mechanics parameter of filler compacted - - deformation parameter should be considered and dual control criterion should be put in practice. to get upper deformation parameter of xigeda stratum filler, the percentage of mudstone should be controlled. the thickness of filling layer regulated by current criterion can be increased if the compaction car has proper function

    通過此次研究,獲得了對路堤變形問題的新的認識,即為了控制路堤的沉降變形,不僅應滿足現行規范中規定的壓實度標準,還應該引入填料壓實后的力學參數? ?變形模量值標準,實行雙重控制標準,而對于昔格達地層這種混合填料,為了獲得較大的模量值,應該控制填料中泥巖的含量;現行公路路基施工規范中對路堤填築時分層填築厚度的規定值,在壓實機具功能滿足的條件下,可以適當提高。
  17. ( 3 ) the forming wrapping structure because of interlayer between silt and clay at the transition part from the fourth layer to the fifth layer in the sediments section. according to this, intense change of the geoenvironment in this area at the period of filling up of the ancient barrier lake is presumed

    ( 3 )通過在沉積物剖面的第四層到第五層過渡的部位可以看到粉砂土層和粘土土層相互滲透而形成的包卷構造,推測古堰塞湖淤積時期內該區域的地質環境發生了重大改變。
  18. This peanut butter silk pie has a graham cracker crust, a thin layer of fudge, and a cream cheese - peanut butter filling

    外表香脆,內心柔滑:全麥餅干外殼,包著乳酪和花生黃油蛋糕,底部一層薄薄一層巧克力,表面巧克力點綴。
  19. Based on the project named 《 seiwave earthquake deposit layer forecasting and well deploying system 》 which is presided by daqing oil field limited liability company reconnaissance exploitation academe. it implement graphics display module, graphics manipulation module, graphics filling module and optimizing of plot speed in 《 three - dimensional earthquake interpret hypo - system 》 which is the core portion of 《 seiwave earthquake deposit layer forecasting and well deploying system 》. it is deeply investigated the special knowledge of earthquake interpret

    本文以《 seiwave地震資料儲層預測與井位部署系統》項目為依託,深入研究了此系統中相關的圖形顯示知識和專業知識,實現了《 seiwave地震儲層預測與井位部署系統-三維地震資料解釋子系統》中圖形顯示、圖形操作、圖形填充功能和繪圖性能的優化,進一步提高了油田的勘探效率。
  20. Improvement of the filling layer in cyclone film deaerator

    旋膜式除氧器填料層改進
分享友人