layered construction 中文意思是什麼

layered construction 解釋
多層結構
  • layered : 層狀的
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The three kinds of construction graph can be applied to optimization problems with different characteristics, and the two kinds of layered construction graph are more suitable for complex multi - stage dynamic decision problems ( cmsddp ) than scg. the clcg defines smaller solution building blocks and is able to perform better in large - scale cmsddps than the blcg. 2. the construction graph of aco algorithms need statically describe the whole solution space ( or discrete solution spa

    ( 2 )蟻群優化演算法的解構造圖一般要靜態地描述整個解空間(或者是離散化了的解空間) ,對于大規劃動態決策問題,不僅存在描述解空間的困難,而且讓蟻群在迭代過程中始終在整個解空間中進行搜索,搜索性能會很低。
  2. In the theoretical description of grazing emission fluorescence, the mode of fluorescence intensity emitted from layered materials dependence of grazing angle is established by applying asymptotic approximations to double fourier integrals, and the theoretic calculation formula of fluorescence intensity from a thin layer is derived. by the derived expressions, the theoretic simulation curves of several thin layers on si substrate are calculated. in the experimental setup, the requirement of construction of the setup and some important parameters are brought forward

    最後,利用平穩位相方法建立了掠出射情況下薄層樣品產生的熒光強度和掠出射角的對應關系數學模型,推導了薄層樣品熒光強度理論計算公式,並以此為依據模擬計算得出了cr 、 fe 、 ti和ni等幾種以si作基底的單層薄膜樣品的熒光強度隨掠出射角變化的理論曲線。
  3. Through analyzing the in - situ data such as total settlement, layered settlement and pore water pressure, the actual deformation behavior of soft foundation are mastered. after summarizing the methods of predicting settlement of soft foundation and bring forward a method to predict the post construction settlement of the surcharge preloading soft foundation. and the engineering application of the predicting foundation settlement based on “ law of massaction ” and the traditional predicting methods are compared, the results shows that the model is useable and it deserves more validation in more projects

    本文以深圳灣軟基處理工程試驗區為背景,通過對淺層沉降、分層沉降、孔隙水壓力等資料的分析,掌握了軟基變形的實際性狀;在總結軟基路堤沉降預測方法的基礎上,探討了軟基超載預壓工后沉降預測的參數反演法;並對地基沉降預測的「質量作用定律」模型的工程應用與傳統的預測方法進行了對比,驗證這種方法是可行的,得出了一些有用的結論。
  4. Though scholars at home and abroad had made corresponding research during the last century and at the same time they had made great achievements, most of them confine themselves to the research on perfect pile buckling, not considering the influence of many special situations such as the initial bend, the defects in construction and the layered soil, etc. . the reliability design has not been advanced according to the design method of probability theory until recent years

    基樁的屈曲分析是一個相當復雜而又具有實際工程意義的課題,其影響因素繁多。盡管國內外學者上世紀就已有相應的探討,取得了許多研究成果,但大多局限於對基樁本身的屈曲研究,而未考慮基樁本身的初始彎曲、施工缺陷和土體分層等諸多特殊情況的影響。
  5. So the study and use of compound powders and thin films get more and more regards. among them the double layered structure nanocompound semiconductor become the focus of study by their high photocatalytic efficiency, fast reaction speed etc. it has been confirmed that the potassium niobate ( k4nb6o17 ) is an excellent semiconductor photocatalyst. its special construction consists in the ion k + in the interlayer can be replaced by other cations, which providing vast space of modifying the material

    層狀化合物中的鈮酸鉀k _ 4nb _ 6o _ ( 17 )已被證實是一種性能優異的半導體材料,具有光催化和光電轉換性能,其獨特的結構是處于層間的帶正電的k ~ +可以被其它陽離子所替代,正是由於其多元素、復合型的特點,為材料的修飾和改性提供了廣闊的技術空間。
  6. Based on the system engineering theory, and through detailed analysis of economic techniques of the engineering work plan examples of the common used long span steel truss structures, utilizing the sequenced layer analysis, the current paper will establish the long span engineering work plan index system. also by the fuzzy mathematical principles, it builds multi - layer fuzzy complex mathematics judgment and calculate the weight coefficient of each index by application of fuzzy power duality method ; and based upon the experts investigation method builds each index judgment matrix. finally applying the current popular update system tool - power builder 8. 0 developed the " optimization system of ( construction ) fuzzy work plan " to solve and carry out the multi - layered fuzzy combination judgment ; then step on the analysis and research on the reliability of the optimal solution for further achievement of the final objective of the fuzzy optimization in selecting the construction work plan of long - span steel truss realization

    本文以系統工程學的理論為基礎,通過工程實例對常用大跨度鋼桁架結構施工方案進行詳細的技術經濟分析,運用層次分析法建立起大跨度鋼桁架結構施工方案的指標體系,利用模糊數學原理建立了多層次模糊綜合評判數學模型,採用模糊權重二元對比法計算出各指標的權重系數,並採用專家調查法建立各指標的評判矩陣,利用目前最流行的工具系統- powerbuilder8 . 0編制了《建築施工方案模糊優選系統》求解計算,進行多層次模糊綜合評判;調整權重和隸屬度,對數學模型最優解的可靠性作了進一步的分析和研究,從而達到模糊優化選擇大跨度鋼桁架結構施工方案的最終目的。
  7. According to the difference of defining solution building blocks and mapping them to the nodes of the construction graph, three kinds of construction graph, simple construction graph ( scg ), basic layered construction graph ( blcg ) and compound layered construction graph ( clcg ), are defined here

    本論文根據對解構造塊的分解方式以及與解構造圖節點之間的映射方式的不同,分別定義了簡單解構造圖、基本層狀解構造圖及復合層狀解構造圖,並研究了這三種解構造圖適于求解的優化問題的特性。
  8. 1. on the bases of some basic suppositions, terzaghi ' s one dimensional consolidation and principles of layered summation method, the paper draw the formula which can calculate the embankment of layered filling and take the formula into programme ; 2. building the finite difference model of layered high - stack soil, carrying out numerical simulation of construction sequence, construction velocity, interface element of layer - stacked, the author get the numerical solution

    1利用一些基本假定,根據太沙基一維固結理論和分層總和法的基本原理,推導出來計算分層填築體自身沉降的公式,並編制了程序; 2建立了分層填築高填方路堤問題的有限差分模型,並對分層填築的施工順序、施工速度,界面單元進行了數值模擬,獲得了位移場和應力場的數值解。
分享友人