leveling line 中文意思是什麼

leveling line 解釋
水準路線
  • leveling : n. 測平,校平;平整(土地);水準測量。 a leveling instrument [mechanism] 水準儀。 a leveling machine (道路)整平機;【冶金】鋼板矯平機。
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸線、標高線復測投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。
  2. Product use : this series of production line is used in processing the coil material with different specifications into the level sheet material with the required length and width by the procedure of decoiling, leveling and cutting

    產品用途:該系列生產線用於將不同規格的卷料,經過開卷校平剪切成為所需要長度及寬度的平整板材。
  3. The component of product : this production line is mainly composed of charging wagon, single or double support uncoiler, transverse cutting machine, piling device and so on, meanwhile swing type mid - bridge, leveling draught device and deviation rectification device and so on are equipped between each machines

    產品組成:該生產線主要由上料小車,單或雙支撐開卷機,橫向剪切機,堆垛裝置等組成,同時在各機之間配有擺動式中間橋,校平牽引裝置,糾偏裝置等。
  4. Based on the optimization system and algorithm frame, the co - evolution optimization model of minimization of makespan, minimization of workload variation, leveling of the material flow and u - line is established, and some instances is given also

    在多目標協同優化體系和演算法框架的基礎上,本文分別建立了混合流水生產系統的基於製造周期、負荷、物流和u型布局等多目標協同優化模型,並給出了優化實例。
  5. In addition, according to difference between the top - level materials and the low - level materials, the model of leveling the mat erial flow is set up separately. furthermore, the model of leveling the material flow with constrain of resource supplying limit. in the model of optimization on the workload, the mutual effect of line balancing and scheduling is analyzed by an instance ; the factors of line balancing, scheduling, and system parameters, such as workstation length, the launch rate are taken into considered

    在基於負荷的多目標協同優化模型中,通過實例分析了平衡設計與排產設計對系統目標的交互影響,綜合了流水線的平衡設計和排產設計與工作站長度、產品投放速率等系統參數對系統的影響來優化混合流水生產系統設計,建立了在2種工作站類型與2種假設情形構成的4種組合下的優化模型,給出了一個優化實例。
  6. Using the repetition data from the leveling circuit, which is composed of the spots at the measurement field in the hefei deformation observatory and the base rock at the neighborhood of the measurement line, we estimate the degree of stability of each spot

    摘要以合肥形變臺短水準測量場地各基巖點與檢測線路端點(基巖)組成水準環線進行連測,利用重復觀測資料,估算各點穩定度。
  7. The observation data of both leveling and base line from 32 sites located in yunnan and sichuan faults are processed. the active characteristics, the active quantities and directions about several of main faults are summarized

    通過對四川及鄰區(雲南省境內)的32個地殼形變跨斷層短水準、短基線測量場地觀測資料進行處理、分析,研究四川及鄰區主要是川滇塊體內各活動構造帶的斷層活動習性、量級和時序變化特徵。
  8. In the study of the multi - objective cooperative optimization on makespan, the relationship between various balancing indices with the system objective is analyzed ; the result of co - evolution optimization and result of serial optimization is compared and analyzed ; the algorithm is given. based on the decision schemes of co - evolution, the multi - objective decision is made. in the model of leveling the material flow, the model of minimizing usage rate is extended to all levels of materials in the flow line, and a new model is built up, based on the makespan ; the objective of leveling the material flow is combined with the line balancing firstly

    在基於製造周期( makespan )的多目標協同優化中,研究了各種平衡指標與系統目標之間的關系,將協同優化的結果與串列優化的結果進行了比較分析,給出了混合流水線協同優化與多目標協同優化的具體演算法,並且在多目標協同優化得到的決策方案集的基礎上,進行了多目標決策;在基於物流的多目標協同優化模型中,將零部件使用速率的均勻化模型推廣到流水線上各個層次物料供應(物流)的平準化問題,首次在makespan的基礎上將物流平準化目標與混合流水線的平衡設計有機結合起來,根據頂層物料和低層物料的不同特徵,分別建立了頂層物流的平準化模型和低層物流的平準化模型,進一步地研究了帶資源供應約束型的物流平準化模型。
分享友人