load-through 中文意思是什麼

load-through 解釋
全裝
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • through : 副詞1 穿過,通過,經歷;從頭到尾,完全,全部;到最後,到底,徹底;透;完畢。 2 出來。 adj 1 直通...
  1. Vertical elements carry sufficient load through cantilever action to produce cantilever deflections equal to arch deflections.

    垂直桿件則借懸臂作用產生和拱撓度相等的懸臂撓度,來承擔足夠的荷載。
  2. The load current is handled directly by the controller through semiconductor switching devices.

    負荷電流由調節器通過半導體開關元件直接控制。
  3. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以水阻作為負載,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  4. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道路資料為主,從實際出發,結合理論計算,對重載標準進行了詳細的討論,分別給出了水泥混凝土路面與瀝青混凝土路面的重載標準了;同時,通過大量的水泥混凝土板底應力計算,推導出了混凝土面板荷載與板底應力水平的關系式;給出了水泥混凝土路面與瀝青混凝土路面的交通分級;通過對試驗路各結構層進行承載板測試,發現現有材料模量較以前有了明顯的提高;對比現場實測的當量回彈模量與理論當量回彈模量,指出現有水泥路面設計中的諾謨圖不能完全符合現有道路材料,從而提出了對理論模量的修正公式。
  5. According to experimental data and related standard, the finite element model of frame has been set based on its geometric model through simplified processing, selecting element, dividing mesh grids, load cases setting and putting characteristic etc. on the basis of this, the integrated finite element model of motorcycle has been established including frame, engine, suspension, wheel, rider and oil box etc. to understand the relationship and dynamic property of frame and integrated motorcycle, mode analysis and frequency response analysis have been done

    根據實驗測試數據和有關標準規范,以總體設計階段得出的車架幾何模型為基礎,通過模型簡化、單元類型確定、網格劃分、工況設置、邊界處理、物理特性賦予等,建立車架的有限元模型。並基於此,建立整車的有限元模型,包括車架、發動機、懸架、輪胎、乘員、油箱等。
  6. " there you are ? like a knife through butter " said the demonstrator as the powered shovel swung back with its load

    當裝滿泥土的挖土機轉回來時,操作示範員說: 「你瞧,就像拿刀子切黃油塊一樣,十分容易。 」
  7. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據隧道模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的隧道襯砌結構外水荷載的作用規律。
  8. Abstract : experiments were made on a ultrasonic machining tool with work - piece adhered to ultrasonic transducer head, to machine micro - holes on hard and brittle materials such as soda glass and si, to study the effects of tool materials , work - piece materials , amplitude , machining load , slurry concentration , tool length and the size of work - piece on machining rate and wear ratio. in this experiment, the micro - tool was made through wedg

    文摘:通過以wedg放電加工手段製作微細超聲加工用工具,在採用工件加振方式的微細超聲加工機上對碳酸玻璃、半導體硅等硬脆材料試件進行微孔加工的實驗,來探討在某一特定加工條件下工具材料、工件材料、工件的振幅、加工靜載荷、磨料懸浮液濃度、工具長度及工件尺寸等重要因素對加工速度、工具損耗率的影響,為微細超聲加工技術的實用化提供參考依據。
  9. Basing on the analysis about the reason that how the superabundant torque appears, direct torque control strategy is used to realize the servo control of two asynchronous motors and load system ' s simulation. the measure method of superabundant torque of the system, the valid method of static state torque and the benchmark of dynamic torque are given by testifying the system ' s speediness through experiments

    在具體分析加載系統中多餘力產生原因的基礎上,採用直接轉矩控制策略,實現了兩臺異步電動機伺服控制和加載系統的負載模擬實驗,通過實驗驗證了系統的快速性;給出了系統多餘轉動慣量的測量、靜態轉矩的校驗和動態轉矩基準的實驗的基本方案。
  10. Through calculation and dynamic adjustment of the distribution factor for every power plant and tie line, more accurate load flow change can be obtained

    通過計算並動態調整各個調節電廠和聯絡線的調節分配因子,得到比單個鬆弛節點計算時更加實際的潮流變化。
  11. This paper uses for reference with an example of frame - shear wall structure and studies the conceptual design and method for optimizationof structural system. through establishing frame - shear wall structure unisonous differential eguation and finding a result, the side shifting curve, moment and shear force distribution curve are obtained under inverted triangle load action on the frame - shear wall structure. after analyzing and comparing, the range of best rigid characteristics for such structure has be gotten

    本文結合框架-剪力墻實例,研討了結構體系的概念設計和整體優化方法。通過建立框-剪結構協同工作的微分方程及求解,得出框-剪結構在倒三角形荷載作用下的側移曲線、彎矩、剪力分佈曲線,經分析對比,得出框-剪結構最佳剛度特徵值區間。
  12. During the halt tess s eyes fell upon a three - pint blue mug, which was ascending and descending through the air to and from the feminine section of a household, sitting on the summit of a load that had also drawn up at a little distance from the same inn

    休息的時候,苔絲的眼睛看見有一輛馬車的頂上坐著一群婦女,她們正在從車上到車下地互相傳遞著一個裝三品特酒的大酒杯喝酒那輛馬車和苔絲的馬車停在同一個旅館里,不過距離稍為遠一點。
  13. By using 5000kn pressure - bent testing machine, the specimens of boulder concrete and crushed stone concrete were tested through three - point - bending method and wedge - split tensile method, the scale division of the index dial of pressure - bent testing machine is larger, whereas the predicted test - load is lesser, so the velocity of exerted load is controlled through observing the reading of the multimeter which is connected with the collecting systerm in order to continuously exert test - load

    本文使用5000kn壓彎實驗機,對不同強度等級的卵石混凝土和碎石混凝土試件分別進行了三點彎曲試驗和楔入劈拉試驗。試驗過程中,由於實驗機噸位較大,而試驗荷載預計較小,為了能夠有效地控制加載大小和加載速度,採用通過觀察與荷載傳感器相連的萬用表讀數控制加載速度的方法,連續加載。
  14. Through the analysis of application effect of heat - stored electric boiler in changdu hotel, the article brings forward that the system s benefit for the environmental protection and peak load shifting and improvement of the economic operation level of the power grid

    摘要通過蓄熱式電鍋爐系統在昌都飯店的實際應用效果分析,提出採用該系統有利於保護生態環境,有利於電網移峰填谷,提高電網經濟運行水平。
  15. According to the operation of subcritical reheat controlled circulation drum boiler, this paper analyses the factors which affect the responding speed to unit load, through modifying the coordinating control system, fully using the boiler ability of heat accumulation and other methods, the author puts forward some measures to raise responding speed to unit load

    分析了影響中間儲倉式汽包爐機組快速響應電網負荷變化的因素,通過對協調控制系統的改進,以及充分利用鍋爐蓄熱能力等方法,提出了提高機組快速響應負荷變化的幾條途徑。
  16. According to the frndamental and the steps of this method, we cans use the linear regress filter method to make the simulation of the wind load and then we can educe the curve of the time - process wind velocity. after that step, we can get the chart of the dynamic wind load which we can deliver the crosswind into the particle wind load and put them on the corresponding cell nodes. then we can do the analysis of the dynamical wind load through the time - process analysis to get the max value of the displacement

    根據線性回歸濾波器法的基本原理和步驟,藉助相關軟體進行風荷載的人工模擬並得出風速時程曲線,進而轉化為風動力譜,由此將橫風向風力表達成節點風荷載作用於相應的單元節點上,按時程分析法對該空間桁架體系進行風荷載的動力分析,求出結構在進行風動力荷載分析時,結構相應節點對應的最值位移值。
  17. And then, the vibration signal of the bearing with low speed and high load is analyzed and fault is diagnosed through wavelet transform method. seen from the comparison of the two methods, it will be difficult to diagnose fault of the bearing with low speed and high load through the former method

    通過實驗發現,小波分析對低速重載軸承的故障診斷能夠取得比較好的效果本文研究的核心是工控微機,在windows2000平臺上,軟體採用visualc + +及labview設計。
  18. The principle of precast segmental construction lies in that concrete segments are assembled as a whole structure to bear load through pressure acted on the segments by post - tensioning tendons

    預制節段拼裝原理是藉助預應力束施加於混凝土節段上的壓力,使得節段間接觸面緊密貼合,形成整體結構共同承擔荷載。
  19. The testing result shows that the power with high - efficiency, high quality and stabilization is provided for the load through the sample generator

    實驗結果表明:所研製的試驗樣機,可以為負載提供穩定可靠、高品質、高效能的電力。
  20. The paper deals with the load distribution law and the development of side resistance and end resistance of single bored pile in loess under vertical load through a great number of tests in field on single pile employing some advanced equipments such as sliding micrometers. some examples are given to demonstrate the application of these laws into optimization design of piles

    本文通過大量的單樁現場試驗,利用瑞士滑動測微等先進測試手段,分析和研究了黃土地基中鉆孔灌注樁單樁在豎向荷載作用下側阻力和端阻力的發揮特徵及荷載分佈規律,並用實例說明了如何利用這些規律進行工程優化設計。
分享友人