load-up condition 中文意思是什麼

load-up condition 解釋
升負荷狀態
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  • condition : n 1 狀態,狀況,情形;品質。2 〈pl 〉外界狀況,周圍情形。3 地位,身分。4 條件;【語法】條件子句。...
  1. A series of multi - pulse experiments are performed at breakdown voltage up to 400kv, peak current up to 30ka with an interval of 5ms, which shows spark gap switch could be obtained good insulation recovery in several milliseconds under the condition of water dielectric pulse power modulator with low load

    在擊穿電壓400kv ,峰值電流30ka ,脈寬40ns的工作參數下,採用吹氣的辦法(氣流速度30m / s ) ,使氣體火花開關多脈沖運行間隔達到5ms ,實驗結果與理論估計相符。
  2. The main work is as following : firstly, some basic issues of economical operation of transformers are analyzed. focusing on calculating the economic load coefficient and carving up the running area of the transformer, determining the advantage between transformers, confirming economical operation mode of transformers in the parallel or divided running condition

    分析了變壓器經濟運行的一些基本問題,主要對變壓器的經濟負載系數的計算、運行區間的劃分,變壓器間技術優劣的判定以及並列和分列運行模式下經濟運行方式的確定進行了分析和討論。
  3. Thermal stress control system actually gather the real - time data of unit sets , compute temperature fields , stress fields and maximum dangerous stress by the math modal , decide target and speedup rotation in every stage of startup process , and justify automatically to realize auto control a serial of processes of turbine , such as speedup , warm - up , connecting net , load changing , stop and unsteady condition etc , and improve automatic level of the unit sets. turbine auto startup ( tas ) system can automatically evaluate steam turbine ' s startup and load changing process according to thermal stress of

    熱應力控制系統實際是對機組運行參數進行實時採集與監控,通過數學模型實時地計算高、中壓缸轉子的溫度場、應力場分佈,以及最危險熱應力,以確定啟動過程各階段的目標轉數及升速率,並進行自動調整,實現機組沖轉、升速、暖機、並網、升負荷、停機以及異常工況下的自動控制,大大提高了機組的自動化水平。
  4. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著水沙條件、潼關高程等的變化及工農業的發展,渭河的水環境發生了巨大變化,表現在年水量及汛期水量銳減;大流量級水流出現次數減少,水量減少幅度大;年輸沙量總體減少,河水含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大洪水發生的次數顯著減少,高含沙小洪水明顯增多;同流量洪水位普遍抬高,洪災發生次數增加,洪災加重;水質污染極為嚴重。
  5. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行邊坡的動力響應分析,得出了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面頂部水平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的坡面,水平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,水平向位移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,水平向加速度值隨時間變化的規律為:坡頂節點總的變化趨勢是越來越大,而坡體中部節點的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為坡頂表面滑塌型。
  6. The mathematic model of the ultra - thin spherical mirror is to be treated as elastic thin shell. then the predigested model, i. e., bended beam, used in qualitative analysis was proposed, and its deflection and stress formulas under the freely supported condition were set up. based on an off - axis aspherical primary mirror, the relationship of aspherical surface error ( rms ) in tangential plane with bended beam ’ s radius r, position s of concentrated load p and geometry length l of arc was analyzed

    根據這一設想,本文建立了超薄鏡的數學模型?薄殼,並提出了強制力作用下超薄鏡的簡化模型?曲梁,推導了曲梁在簡支情況下受力變形的撓度公式,並結合一個實例,計算出曲梁變形后與所需非球面的面形殘差( rms )在子午方向與曲梁弧長l 、曲梁半徑r及集中力位置s的關系及滿足面形精度的r和s范圍,分析了弧矢方向的rms ,得出了同時滿足子午和弧矢方向面形要求的l 、 r和p 。
  7. First, based on the analysis to the development condition of computer and property of the input data of bridge, this paper, taking convenience and practicability as principle, develops the multi passages data - in system made up with human - computer interactive interface and excel import model. second, after comparing and analyzing to the calculation theories and methods of creep and shrinkage, clearing up the key steps of creep and shrinkage analysis, the paper takes incremental method to establish program to analyze secondary inner force caused by creep and shrinkage. third, the paper puts some optimal or simplified treatment to the contents of pre - stress and develops relative program ; in addition, through analysis to the different methods used to calculate the secondary inner force caused by pre - stress, the paper combines equivalent load method with finite element, carries out some simplified treatments, and establishes program to calculate secondary inner force caused by pre - stress

    首先,在分析當前計算機的發展狀況及橋梁結構輸入數據特點的基礎上,以方便、實用為原則,採用人機交互界面和excel輸入方式聯合的多通道數據輸入系統;其次,通過比較分析徐變收縮計算的各種理論及方法,澄清了徐變收縮分析的關鍵過程,並採用增量法編製程序,實現徐變收縮次內力分析;再次,對預應力的相關計算內容進行適當優化或簡化處理,並編制相應程序;另外,本文還在比較預應力次內力各種計算方法的基礎上,將等效荷載法結合有限元進行一些簡化處理,編製程序實現預應力次內力的計算;最後以三個算例來校核計算方法及程序運行結果的可靠性,取得了預期效果。
  8. The paper sums up the construction technique of qinjiatuo super bridge in all : consolidating the soft ground foundation with vibrating & impacting macadam piles ; constructing the bored cast - in - place piles under the complex geological condition ; developing and researching cable - stayed handling basket with the bearing capacity of 3000kn ; beam construction ; construction technique of the new type bridge deck and dynamic & static load test

    本文全面總結了覃家沱特大橋施工技術:振沖碎石樁加固軟弱地基、復雜地質情況下鉆孔樁施工、承載力3000kn斜拉式掛籃開發與研製、梁部施工、新型橋面鋪裝層施工技術及動靜載試驗。
分享友人