loading cable 中文意思是什麼

loading cable 解釋
加載電纜
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. Compressive loading resistance of fiber optic cable

    光纖電纜的抗壓力負荷性能
  2. Advice of shipment : the sellers shal1 , upon completion of loading , advise the buy - ers by cable of the contract number , commoidity , number of packages , gross and net weights , invoice value , name of vessel and its loading date

    裝運通知:賣方在貨物裝船后、立即將合約號、品名、件數、毛重、凈重、發票金頂、載貨船名及啟航日期以電報通知買方。
  3. Advice of shipment : immediately after completion of loading of goods on board the vessel the sellers shall advise the buyers by cable of the contract number , name of goods , quantity or weight loaded , invoice value , name of vessel , port of shipment , sailing date and port of destination

    裝船通知:貨物裝運完畢后,賣方立即以電報通知買方合同號、貨名、所裝數量或重量、發票金額、船名、起運口岸、開船日期及目的口岸。
  4. Under the circumstances that the same design loads, it compares with the different responses of membrane in the cable dome structure model through loading non - cooperative analysis and loading cooperative analysis

    考察在相同的設計荷載下,對索穹頂結構模型,對比協同荷載分析和非協同荷載分析對膜的不同反應。
  5. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜拉橋? ?青洲閩江大橋為背景,首先根據設計圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜力試驗和環境振動試驗結果對初始有限元模型進行校正,通過參數的調整使模型靜、動力計算結果與實測值吻合。
  6. Stay cables of the long - span cable - stayed bridges are susceptible to vibration under wind loading, or wind incorporated rain excitation, or deck motion due to high flexibility, relatively small mass and very low inherent damping, such as vortex shedding, wake galloping, parameter resonance and wind - rain induced vibration. large - amplitude vibration of cables may reduce the life of cables and threaten safe traffic, and has been considered today as one of the most critical problems for this type of bridge

    大跨度斜拉橋拉索具有較小的質量和極低的阻尼,在風、風雨及橋面振動等外部激勵下極易發生振動,如渦激共振、尾流馳振、參數共振和風雨振等,拉索的大幅振動對拉索的使用壽命和橋梁安全運營構成極大威脅,它已成為大跨度斜拉橋急需解決的關鍵問題之一。
  7. 5 for cargo lots over 1, 000 m / t each, or any other lots less than 1, 000 metric tons but identified by the buyer, the seller shall, at least 10 days prior to the date of shipment, inform the buyer by telex or cable of the following information : the contract number, the name of commodity, quantity, the name of the carrying vessel, the age, nationality, and particulars of the carrying vessel, the expected date of loading, the expected time of arrival at the port of destination, the name and telex of the carrier

    一次裝運數量超過1000噸的貨載或其他少於1000噸但買方指明的貨載,賣方應在裝船日前至少10天用電傳或電報通知買方合同號、商品名稱、數量、船名、船齡、船籍、船隻主要規范、預計裝貨日、預計到達目的港時間、船隻公司名稱和電傳。
  8. But because of an indeterminate flexible structure with many degree of redundancy, its variant inner force under dead - loading, nonlinear behavior and the correlation between construction method and completed structure, especially incessant conversion of system in construction method, these must bring many complicated change to construction internal force and displacement. these main factors resulting in construction control analysis become more important in the design of cable - stayed bridge

    但由於它屬于高次超靜定的柔性結構,恆載內力狀態具有多樣性、結構狀態呈非線性、施工過程與成橋狀態具有相關性,特別是在施工階段結構體系的不斷轉換,必然給橋梁結構帶來較復雜的內力和位移變化,這些特點使得斜拉橋的施工控制分析成為突出的研究課題。
  9. Fotp - 33 - optical fiber cable tensile loading and bending

    Fotp - 33 .光纜拉伸荷載和彎曲
  10. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  11. The sellers shall immediately upon the completion of the loading of the goods , advise buyers of the contract no. , names of commodity , loading quantity , invoice values , gross weight , name of vessel and shipment date by telex / fax / cable within hours

    一候裝載完畢,賣方應在小時內電傳/傳真/電報買方合同編號、品名、已發運數量、發票總金額、毛重、船名/車/機號及啟程日期等。
  12. Tray - type cable support systems are ideal cable laying devices most broadly applied in petrolum industry, chemical industry, power and light industries. television and telecommunication, it is featured by such advantages as small weight, great loading capacity. good - looking shape, simple structure. convenient erection. quick heat dissipation and fine permeability

    托盤式橋架是石油、化工、電力、電視電訊等方面最廣泛應用的敷設裝置,它具有重量輕,載荷大、造型美觀、結構簡單、安裝方便、散熱透氣性好等優點,既適用於動力電纜的安裝,也適用於控制電纜的敷設。
  13. 17 advice of shipment : within 48 hours immediately after completion of loading of goods onboard the vessel the seller shall advise the buyer by cable or telex ofthe contract number, the name of goods, weight ( net / gross ) or quantityloaded, invoice value, name of vessel, port of loading, sailing date andexpected time of arrival ( eta ) at the port of destination

    貨物裝船完畢后48小時內,賣方應即以電報或電傳通知買方合同號、商品名稱、所裝重量(毛凈)或數量、發票價值、船名、裝運口岸、開船日期及預計到達目的港時間。
  14. You should cable us the vessel name, estimated loading period, loading capacity, contract number, shipping agent to us 12 days before loading time

    你方應在船隻受載期12天前將船名、預計受載期、裝載量、合同號、船舶代理人電報告知我們。
  15. There are the two limitations for both of the cable method and beam method : ( 1 ) it can only analyze the response of pipeline under tensile loading ( < 90 )

    現有的理論分析方法和梁模型有限元方法都難以分析管截面發生大變形的情況,例如屈曲變形。
分享友人