loading device 中文意思是什麼

loading device 解釋
加載裝置
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • device : n. 1. 設計,計劃;方法,手段。2. 〈pl. 〉意志,慾望。3. 謀略,策略,詭計。4. 器具,器械,設備,裝置。5. 圖案,圖樣;花樣;紋章;標記,商標;(紋章上的)題銘。
  1. The products is of high water hydrophobe device usedin suitable and has the characteristics of aging resistance, resistance, tracking resistance, and corrosive resistance. it can withstand high bent load, strong impact force fn12 - 12 series indoor use high voltage load switch fn12 - 12 and fn12 - 12r is of three phases indoor use ac high voltage load switch for breaking and making the circuit of 50hz, 12kv system under rated loading

    Fn12 - 12和fn12 - 12r組合電器是額定電壓12kv額定頻率50hz的三相高壓開關設備用於分合負荷電流閉環電流空載變壓器和電纜充電電流關合短路電流配裝接地開關的負荷開關,可以承受短路電流
  2. A high impedance coupling device will limit loading.

    一個高阻抗的耦合裝置將限制負載。
  3. Do not use the cloud or glass loading the device cloud the density low, the flap high, can affect the sound effect. glass density ratio cloud the is high, however not thick and solid, the flap more seriously. can use to spend the or, and it is tallest to is, density particularly, loading device than ideal, but the thickness want 3cm above

    別用雲石或玻璃承載器材雲石密度低,諧振高,會影響音響效果。玻璃密度比雲石高,卻不厚實,諧振更嚴重。可用花崗石或麻石,尤其是麻石,密度最高,承載器材較理想,但厚度要3厘米以上。
  4. The exportation resistance of a device work device with what link after loading the resistance s the certain connections for should satisfying, in order to prevent mount to load the appearance produce the obvious influence. with each other connect to say to electronics equipments, for example after signal connect the enlarger, ex - class to connect class, only behind first - degree importation resistance before larger than first - degree exportation resistance 5 - 10 times are above, can think the resistance to match good ; connect the box come saying, electronics tube the machine should choose to use with for the enlarger its output to carry the mark to call the resistance the box for, but transistor enlarger then have noing this restrict, can take officing why resistance of equal or approximate box

    一件器材的輸出阻抗和所連接的負載阻抗之間所應滿足的某種關系,以免接上負載后對器材本身的工作狀態產生明顯的影響。對電子設備互連來說,例如信號源連放大器,前級連后級,只要后一級的輸入阻抗大於前一級的輸出阻抗5 - 10倍以上,就可認為阻抗匹配良好對于放大器連接音箱來說,電子管機應選用與其輸出端標稱阻抗相等或接近的音箱,而晶體管放大器則無此限制,可以接任何阻抗的音箱。
  5. Bulk discharging device is installed at lateral of cement silo for bulk truck loading

    在水泥庫庫側設散裝裝置,用於汽車散裝。
  6. Emergency release device of oil loading arms

    輸油臂緊急分離裝置
  7. Advanced tonnage device is equipped to show forging force directly with over loading alarm

    9 .安裝有國際先進的噸位儀,直觀顯示鍛造力,並設置超負荷報警。
  8. Reliable centralized lubrication system and manual complimented lubrication system can effectively lower friction loss advanced tonnage device is equipped to show forging force directly with over loading alarm

    8 .可靠的集中潤滑系統和手動補充潤滑系統,有效降低磨擦損失。
  9. Design and application of loading surge device in belt conveyer

    膠帶輸送機緩沖裝置的設計與應用
  10. This paper, in allusion to damage of expansion joint of bridge, introduces a sort of new structure of jointless device - semi - integral abutment jointless bridge, and establishes model of general structure finite element of this bridge, and in details analyses its qualities of stress. the model considers the interaction of superstructure - substructure - soil. resistance of the soil behind abutment adopts still soil pressure and elastic resistance when the temperature rising, but active soil pressure when dropping. analysis of qualities stress of bridge includes of action of dead load, car load, temperature load of season character. taking an 100m length pc semi - integral abutment jointless bridge as instance, the paper establishes the model of plane frame by applying large common software - anasys, and analyses it by elastane and large deformation to imitate character of stress and deformation of general bridge. at the same time corresponding models of finite element of joint bridge and integral abutment bridge are established, and unique stress and performance of structure of semi - integral abutment jointless bridge are researched by comparing and analysing character of three different models under same loading, and controlling factor of design and constitution are generalized. in conclusion, for semi - integral abutment jointless bridge, on one hand shear, moment and deflection of the main beam and axis force of substructure are approximate with that of joint bridge, and integral stifmess of structure is increased and damage of expansion joint is eliminated, on the other hand there is axis force in main beam, shear and moment of substructure are bigger than that of joint bridge. in all this type of jointless bridge has rational stress and is worth of application and popularization

    半整體式橋臺無縫橋梁計算模型考慮了上部結構-下部結構-土的共同作用;臺後土抗力升溫時採用靜止土壓力加彈性土抗力,降溫時採用主動土壓力;分析橋梁受力性能時考慮了結構自重、車輛荷載和季節性溫變荷載的作用。以一座橋長100mpc半整體式橋臺無縫橋梁為實例,採用大型通用軟體ansys建立平面框架模型,進行彈性、大變形分析,模擬全橋受力和變形特點;同時建立與此對應的有伸縮縫橋梁和整體式橋臺無縫橋梁有限元模型,通過三種橋型同步加載對比分析,研究半整體式橋臺無縫橋梁獨特的受力特點和結構性能,總結其設計控制因素和構造要求。通過本文研究知:半整體式橋臺無縫橋梁主梁的剪力、彎矩、撓度和下部結構的軸力與梁式橋相近,結構整體剛度增大,併除去了伸縮縫病害;但主梁增加了軸力,下部結構剪力、彎矩較梁式橋大;綜合分析是一種受力合理有實踐和推廣價值的橋型。
  11. At the same time, it detailed demonstrate and carry out the way, which apply housing electric spindles at generation state to carry out housing toque loading in the joint testing and indirectly estimation housing torque loading by the electromagnetism torque of inner tube electric spindles. thus, the technical problem that the high speed shafting torque loading device and torque sender are difficult to ins tall is solved. and it saves a set of expensive high speed shafting torque loading and measuring device

    同時,詳細論證並實施了採用外套電主軸工作在發電狀態實現接合試驗的外套扭矩加載和通過內套電主軸的電磁轉矩來間接估算外套加載扭矩的方法,從而解決了高速軸系扭矩加載裝置和扭矩傳感器不宜安裝的技術難題,並且節省了一套昂貴的高速軸系扭矩加載和檢測裝置,該成果填補了國內高速單向軸承試驗臺扭矩加載領域的空白,達到了國內領先水平。
  12. Through analyse, the thermal prompting source of infrared bulbs was improved on. the time controller can control the loading time, which was one components of the device of infrared bulbs. the improved thermal prompting source can fit the change fo size of object

    通過分析,對紅外燈的熱激勵源進行了改進,使其由時間控制器控制加載時間,使其能滿足試件大小要求,形成空間梯度小,時間梯度大的均勻溫度場分佈。
  13. The device of loading coal and protecting pillar in conventionally - mechanized coal winning technology face

    普采工作面裝煤護柱裝置
  14. Results show that triple reflection signal and quintuple reflection signal of ytype and s type are less 12db, 16. 67 db and 11. 8 db, 17. 3 db than that of " - ' " type saw mass sensor device. experiment results show that insertion loss ( about 14db ) of the devices in center frequency is close to the theoretical value ( about 16db ) developed by p matrix representation. sensing characteristics of y type and s type saw mass sensors have been also tested and analysed in detail. ethanol and pure water mixed solution containning trace nacl is titrated into mass loading area of y type and s type saw mass sensors devices to detect their mass loading sensitivities

    本文對y型和s型雙聲路saw質量傳感器件的傳感特性進行詳細測試分析,在y廠書型和s型雙聲路聲表面波器件的質量沉積區中滴定含有微量naci溶質的乙醉和水的混合溶液,以測試器件的質量沉積效應靈敏度,它們分別約為2967ppm . cm丫夢g ( y型)和3一15ppm . emz /協g ( s型) ,與理論值38 . 93ppm . emz / 「 g相近,拼處于國內外同型和s型雙聲路聲表面波器件的頻率一溫度特性幾,其單聲雙聲路相對溫度系數約為10一12hz / ,處于國內外同類研究先進水平。
  15. Designing and manufacturing of compressive - shear loading device

    壓剪加載裝置的設計與研製
  16. It is automated product line, which process is as follows : first, loading comminution pvc materials to mixing device manully, then running the auto work cycle process - drying and transmitting to loading device - plasticizing, extruding and forming cooling the forming dies - cooling in the cycle water container - drying with compress - air blowing - towing with tow device - automatic punch device - transmitting workpiece with manipulator - placing workpiece - last, moving the workpiece manually

    在生產門封條的同時完成了打孔45精確切角機械手取料和全自動擺料工序,整條線只需一人操作,每段切除的料角是老式生產線的1 5 ,大幅度提高了成品率。
  17. In this paper, a 9 - point loading method been used in the new balance calibration system to load six component loads on a balance. at same time, the automatic loads method and the design of loading device are also important

    同時,在具有全自動加載功能的校準系統研製中,自動加載方式選取和加載機構的設計也是其中的關鍵技術難點之一。
  18. Empty uld release time - the waiting time of a trucker, after submitted unit release form at the uld collection points, to receive the first empty unit loading device

    提取空置貨箱時間-貨車司機在貨箱收集點遞交發放貨箱表后至提取第一個空置貨箱的處理時間。
  19. In the case of a pre - loading device or system, a full technical description of the construction and function including any sensing device, describing the method of activation and any necessary method to avoid inadvertent activation

    在預載裝置或系統中,應包括全部技術描述,裝置(系統)結構、包括傳感裝置在內的功能描述(驅動方式以及避免疏忽的必要方式) 。
  20. In order to guide the future blasting optimization of dongguashan mine, the blasting characteristics of the medium under various high - stresses are studied by use of reformed loading device and dynamic holophotoelastic modelling

    為了指導將來冬瓜山礦的爆破優化工作,利用自行改造的加載設備和動光彈模擬試驗裝置,研究了不同高應力條件下的介質爆破特性。
分享友人