loading problem 中文意思是什麼

loading problem 解釋
負載問題
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • problem : n. 1. 問題,課題;疑難問題;令人困惑的情況。2. 【數、物】習題;作圖題。3. (象棋的)布局問題。adj. 1. 成問題的;難處理的。2. 關于社會問題的。
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  3. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  4. According to this problem, this paper proposes a modified isochronal well test with bottom hole liquid loading

    針對這個問題,提出了一種存在井底積液時的修正等時試井資料解釋方法。
  5. Analytical solution of the bending problem of piezoelectricity cantilever beam under uniformly distributed loading

    均勻分佈荷載作用下壓電懸臂梁彎曲問題解析解
  6. Contrast between this machine and traditional rolling screen : adopt lower driving, the carrying ability is great, running is stable which settle the problem, such as great torsional moment of central drive, startup loading is great with shock of chain driving

    本機與老式滾筒篩相比,因為採用下傳動有承載能力大運轉平穩,特別克服了中心傳動扭矩巨大,起動負荷大,鏈傳動沖擊等缺點。
  7. The dynamic response of cylindrical shells and conical shells under radial non - uniform impulsive loading has an important application in the filed of military and civil engineering. in this dissertation, the problem of transient response of the cylindrical shell under longitudinal line - loading and that of the conical shell under cosinoidal impulsive loading are studied, and some useful conclusions that have important significances in both theoretic studies and engineering applications are obtained

    圓柱殼和圓錐殼在側向沖擊載荷作用下的動力響應具有重要的軍事和民用工程背景,本文對縱向線載荷作用下的圓柱殼瞬態響應問題和餘弦沖擊載荷作用下的圓錐殼瞬態響應問題進行了研究,取得了一些具有重要理論意義和實用價值的研究成果。
  8. To aim at this problem, in term to the feature of fatigue loading of bridge, this paper, on the base of analysis of current bridge reinforcement, makes a relative system experiment research and theory analysis for the fatigue performance of cfrp - strengthened concrete beam

    本文針對這個問題,在分析現有橋梁結構加固方法的基礎上,根據橋梁承受疲勞荷載的特點,對碳纖維布加固混凝土梁的疲勞性能進行了比較系統的試驗研究和理論分析。
  9. Fourthly, the solutions for non - axisymmetical dynamic responding of elastic circular plate ( thin and thick plate ) rested on transversely isotropic saturated half - space / layered ground subjected to arbitrary harmonic loading are presented. under the contact conditions, the problem leads to a pair of dual integral equations which describs the mixed boundary - value problem

    首先建立直角坐標系下波動問題的狀態方程,經雙重fo吐er變換求解狀態方程后得到傳遞矩陣:利用遞矩陣給出直角坐標系下層狀橫觀各向同性飽和地基在任意分佈簡諧荷載作用下穩態動力響應的一般解。
  10. The improving problem of hydraulic pressure change direction system of loading machine was disscussed. the ten tative ideas of utilizing limited pressure change direction system were put forward

    探討了裝載機液壓轉向系統的改進問題,提出了採用限壓式液壓轉向系統的設想。
  11. Aiming at converting the loading problem in space into the one in plate, the theories of loading distribution along crosswise are applied

    作者對空間橋跨結構中的荷載橫向分佈理論進行了系統地論述。
  12. The oil loading system and the management of oil bin in the oil - bin area is intensive and the measurement method is under - developed at present time. in order to resolve this problem and realize the automatic management, this thesis analyzed the demands of the system, and then integrated the optical fiber sensing technology, the advanced computer technologies of hardware and software, the technologies of intelligent instrument, auto - control and communication ; finally a distributed and intelligent monitoring system of the automatic oil - loading system was developed. the thesis contains hardware design, software design and communication design

    為了解決罐區裝車手動付油與油罐手工檢尺測量勞動強度大,方法落後以及油庫安全性要求非常高的問題,提高油庫自動化和信息化管理水平,本文從監控系統用戶需求與功能分析入手,結合當前飛速發展的光纖傳感技術、計算機軟體、硬體技術、智能儀表技術、自動控制技術和通訊技術,開發了一套用於石化行業的基於光纖傳感技術的集自動付油管理及儲油液位、溫度等安全檢測功能於一體的油罐庫區自動付油管理系統。
  13. With the introduction of the liquid chemical loading and discharging system and how operating in zhenhai district, combining the recent statistics date of the port, the chapter analyzes the berth throughout, use - rate of berth, need of the storage area and point out the main problem now existing. chapter three combining the new project of the district analyzes the handling system layout entirely, meanwhile it builds four series of liquid chemical transfer - lines projects which fit the need of the future

    第二章主要對化工區的發展現狀進行了分析,在簡單的介紹了散裝液體化工品的裝卸工藝和化工區液化裝卸工藝的布局形式和運作方式的基礎上,結合港區現有的各類統計資料,通過對泊位通過能力,泊位利用率和區域貨運量等資料的分析研究,指出了目前化工區液化工藝布局中存在的主要問題,並提出了解決目前存在問題的基本思路。
  14. The repair effect was compared with various type of repair parameters such as patch thickness young ' s modulus and thickness young ' s modulus of adhesive layer. in the chapter iv, a thermalstatic mechanical loading analysis of the repair problem was made. for the single side repair, the patch material having the maximum mismatch in the coefficient of thermal expansion with that of the crack aluminum plate provides the better damage tolerance capability for single - side crack in the panel

    模擬計算表明:粘膠模量增大, j積分值降低,修補效果與粘膠模量有關;隨著粘膠厚度的增大,修補模型的j積分值略有增大后再逐步減小,應合理選擇粘膠的厚度,盡量避免選擇j積分較大值時的粘膠厚度;隨著補片厚度的增加,修補模型的j積分值逐漸增大,到達一定量后又開始減小,因此補片的厚度需要合理選擇。
  15. Model and algorithm of solving loading problem of steel

    鋼坯入庫優化模型與演算法
  16. Thirdly, some shortcomings that numerical simulation ca n ' t effectively applied in jacked pile are proposed. several problems need to be resolved in numerical simulation of jacked pile ; for instance, finite deformation problem, constitutive model of soil, contact between pile and soil and loading problem

    3 、根據目前有限元在模擬靜壓沉樁方面存在的不足,指出了模擬沉樁過程需要解決的問題:土體的有限變形;接觸問題;本構關系;位移貫入法的加載問題。
  17. This dissertation focuses on survivability and self - healing issues of broadband transport networks : the dynamical pre - configuration of the p - cycles, network planning with joint the pre - configuration and the pre - planning method as well as blsr ( bi - directional line - switched ring loading ) loading problem

    本文主要研究了寬帶傳送網路生存性及自愈技術,主要集中在以下幾個方面: p - cycle的預先動態配置、預先配置和預先規劃相結合的網路規劃以及雙向線路倒換環( blsr - bi - directionalline - switchedring )的業務負載。
  18. Clears all options to skip loading added to vspackages by users wishing to avoid loading problem vspackages, then starts visual studio

    清除所有選項,跳過由希望避免加載有問題的vspackage的用戶添加到vspackage中的加載,然後啟動visual studio 。
  19. Mathematical model and algorithm for depository loading problem of cool steel coils

    冷捲入庫的數學模型及演算法
  20. This paper presented a new heuristic algorithm for the 3 - dimension pallet loading problem with non - identical items

    摘要針對多種物品單箱三維裝箱的問題,設計了一種新的啟發式演算法。
分享友人