loading table 中文意思是什麼

loading table 解釋
容積表
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • table : n 1 桌子;飯桌,餐臺。2 手術臺;工作臺;游戲臺;賭臺;寫字臺。3 (飯桌上的)食物,酒菜,伙食;一...
  1. In case loading of a table fails for some tables, you do not want the data to be appended to any target tables should you restart the loading process

    當某些表加載失敗時,您不希望將數據附加到任何目標表後面,這時應該重現開始加載過程
  2. Safety of woodworking machines - circular sawing machines - single blade log sawing machines with integrated feed table and manual loading and or unloading

    木工機械的安全性.圓盤鋸床.帶集合進料工作臺和手工裝料或卸料的單刃圓木鋸床
  3. Safety of woodworking machines - circular sawing machines - part 7 : circular log sawing machine with integrated feeding table and manual loading and or unloading

    木工機械的安全.圓盤鋸床.第7部分:送料工作臺和手工裝料和或卸料一體的圓盤原木鋸床
  4. Safety of woodworking machines - circular sawing machines - part 7 : single blade log sawing machines with integrated feed table and manual loading and or unloading ; german version en 1870 - 7 : 2002

    木材加工機械的安全性.圓形鋸床.第4部分:帶綜合進料
  5. In the design of loading - frame, puting forword a group of universal dimensions of three - point free - link attachment to category i and ii tractors through comparing and analysing whose scope of dimensions, thereout, working out sketch of loading framework on several different positions in the whole lift - course of hydraulic liftenafter this. analysing the case of force on loading framework when the loading force equal to 44100n and the lift - position of the hydraulic lifter is on upper limit, and giving a data table about the case of force on all these positions, consequently, completing the design of loading frame

    在加載框架的設計部分,通過對、類拖拉機的三點懸掛機構桿件尺寸范圍的比較分析,給出了一組、類拖拉機通用的三點懸掛機構桿件尺寸,由此作出了液壓提升器提升全行程中幾個不同位置的加載機構簡圖,並按44100n的加載力、以上極限位置為例對加載機構進行了受力分析,並給出了包括其它幾個位置在內的受力情況表,進而完成了加載框架的設計。
  6. Simple fire control system by led loading table is applied to wz5xx infantry chariot which has the characteristic of flexibility and power maneuverability

    Wz5xx型步兵戰車採用led裝表簡易火控系統,具有靈活、機動性強的特點。
  7. Considering the similitude law for shaking table test, we study the test results and obtain some conclusions which are a ) generally, the silty soil in test box liquefies and the liquefied time has relation with the amplitude of acceleration, b ) when the intensity is on and above eight degree, the silty soil deposit will be liquefied dramatically, c ) the relationship of the pore water pressure is relevant to the cycle loading which represents when the cycle loading ranges from little to great, the relationship is represent as a concave curve, or else as a protruding curve and tends to stability. ( 3 ) based on the triaxial compression test and the resonant column test, some studies are made such as a ) the duncan - chang parameters of constitutive model, b ) the dynamic shear modulus ratio and c ) the damping ratio of the site soil deposits. in order to deal with the test data, a computer program is compiled

    ( 2 )利用小型振動臺進行了k _ 0固結狀態下粉土的振動液化模擬研究,通過分析正弦荷載作用下的試驗資料,驗證了粉土的孔隙水壓力增長模式的合理性;從微分方程推導了基於土體振動臺模型試驗的相似律,並從模型實體、孔壓時程曲線和相似律等方面做出了分析,得出了如下結論:在小型振動臺試驗中,模型箱中的粉土都發生了液化,液化的時刻和輸入加速度幅值有關,而對頻率的變化不太敏感;粉土在相當於8 9度地震烈度的加速度幅值作用下可能產生嚴重的液化;孔壓的增長曲線形狀與施加的荷載有關:當施加荷載為由小到大的形式時,曲線形狀為上凹的曲線;當施加荷載為等幅的正弦荷載或荷載幅值由大到小時,曲線形狀為上凸的曲線,且逐漸趨于穩定。
  8. In this paper, on the basis of the numerical analysis with the concept of equivalent soil mass with reinforcement and shake table model test, the calculation of high loess embankment with geogrid - reinforcement in highway is carried out under static loading, and the dynamic response of high reinforced sand - gravel embankment with grogrid - reinforcement in highway is tested under earthquake. the behaviors of loess embankment are indicated as the following : ? he stress and deformation varies with reinforcement design conditions and foundation types

    本文通過將土工合成材料與土體視為加筋等效土體的數值計算方法和振動臺模型試驗,以加筋黃土高路堤和豎直擋板加筋砂礫土高路堤為研究對象,計算分析了不同堤基上不同加筋設計條件下黃土高路堤的靜應力及變形變化規律,試驗研究了不同加筋條件下砂礫土高路堤的動力反應特性。
  9. Table 2 : the loading p, abrasion linear velocity v, pv value and abrasion coefficient of some materials

    表2幾種材料的負載p滑動磨擦線速度v pv值和摩擦系數
  10. Based on remaining the dismantling and loading, we make full of the equipped instrument, and fall the whole cycle into three modules : speed - adjusting module, pressure module and multi - execution instrument module. we must compile the related plc control program and pc control program, and redesign the control cabinet and re - fix the electric cycle. we complete the auto - control of the hydraulic experiment table through the loading and recapitulate debugging

    在保留其元件可裝拆性的基礎上,我們充分利用現有液壓實驗臺的液壓元件,對其基本迴路進行重新組合,分為調速、壓力和多執行元件控制迴路三個模塊,並編制可編程式控制制器程序和上位機數據採集程序控制迴路動作,重新設計該實驗臺的電氣控制櫃,並進行現場接線和安裝調試,實現所有教學必須實驗迴路的自動控制。
  11. Three kinds of springs were used to imitate different lateral stiffness of soft ground, and special drawers with sliding path were modeled as lateral displacement pile of embankment during its filling periods, with the function of reinforced - mat considered. on the basis of the data of tests designed by thogonal table l9 ( 34 ), three kinds of ( factor, depth of layer, loading ) state matrixes are obtained which could be used for procedure analysis by making use of the principle of information matrix conformation

    用彈簧模擬土體的側向剛度,用可滑動的特殊抽屜模擬軟基填築路堤坡腳的邊樁,並基於對邊樁側向位移速率影響程度室內模型試驗測試數據,利用信息矩陣構造原理,構造了總攬全局的、可用於過程分析的三種(因素、層位和荷載)狀態矩陣。
  12. The simplest scenario for importing data in parallel is loading data into an unindexed table a

    最簡單的數據并行導入方案是將數據加載到無索引的表中。
  13. The calculation formulas of loading capacity are deduced by the formula of average bond strength that is concluded from experiment results. then based on reliability analysis of anchorage length, design formula and table for anchorage length with reliability guarantee that are suitable to every kind of condition are given

    用通過試驗結果回歸的平均粘結強度公式推導出承載力計算公式,選取合適的可靠指標,對植筋的錨固長度作可靠度分析,得出可用於各種情況下的具有可靠度保證的植筋錨固長度設計公式及表格。
  14. For example, if you are loading data into a star schema, you can build a separate package to populate each dimension and the fact table

    例如,如果將數據加載到星型架構中,則可以生成一個單獨的包來填充每個維度和事實數據表。
  15. Stationary loading table

    固定式升降裝卸臺
  16. This system also can present a loading plan according the difference of draft and other loading require. and display the result of stability and strength. this system also can guide filling in report table of stability

    該系統還可以根據限定的吃水差和一些具體的裝載要求,能具體給出裝載方案,顯示具體的穩性、強度結果,並指導填寫穩性計算表,能大大減輕配載人員的勞動強度。
  17. Whenever possible, create all indexes on a table before initially loading it, since the load utility builds indexes more efficiently than the create index process

    只要有可能,應該在初次裝載一個表之前創建其所有索引,因為load實用程序建立索引的效率比create index過程要高。
  18. According to the technique parameter which be put forward by related unit, the author designed the mechanical structure of testing table and choose the drive components and angular measurement components. based on these, the author finished to build all of mechanical table. aimed at the position control of dc motor which drive loading, the author particularly built the mathematic model of three axis dynamoelectric testing turn table

    本文根據相關單位提出的轉臺的各項技術參數和指標,完成三軸慣導元件測試轉臺機械臺體部分的工程設計、驅動元件和測角元件的選擇及安裝,參與三軸轉臺機械臺體部分的加工、裝配和調試。
  19. The percentages in the penalty loading table in paragraph d2 are for general guidance only

    第d2段加徵罰款比率表內所列的百分比僅作為一般指引。
  20. For the purposes of maintaining consistency in penalty calculation, the following penalty loading table is used

    為統一罰款的計算方法,本局採用以下的加徵罰款比率表:
分享友人