logical sequence 中文意思是什麼

logical sequence 解釋
邏輯次序
  • logical : adj. 1. 邏輯的,邏輯上的;邏輯學上的。2. 合乎邏輯的。3. 邏輯上必然的。adv. -ly ,-ness n.
  • sequence : n 1 繼續;接續;連續。2 順序;程序;次第;關系;關聯。3 後果;結果;接著發生的事;後事;後文。4 ...
  1. Berg in working out a logical sequence of events in the king's aggressive programme places its conquest in 1289 or early 1290.

    伯格在確定國王侵略計劃中各項事件的合乎邏輯的先後次序時,把征服異地的年代定為1289年或1290年初。
  2. The parallel form of the input sequence is decoded by means of a logical decoding circuit.

    此并行形式序列通過邏輯解碼電路輸入。
  3. It is well organized and presents the material in a detailed logical sequence

    其課程設置恰當,邏輯縝密有序。
  4. Yin of ningbo city state ginger mountain yongchang bakelite hardware factory, locate in beautiful yin, city of ningbo, state high to take care of the highway, leaning against eastern dagang district ( the north logical sequence harbour ) and oak society ' s airport closely, the traffic is convenient, information is well informed, the environment is comfortable and graceful

    寧波市鄞州姜山永昌膠木五金廠,地處美麗的寧波市鄞州的高顧公路,緊靠東方大港(北侖港)及櫟社機場,交通便捷,信息靈通,環境舒適優雅。
  5. Gulf of hangzhou of the main products beer sells well in cixi, yuyao, zhenhai, north logical sequence, fenghua and other places

    主要產品杭州灣啤酒暢銷于慈溪餘姚鎮海北侖奉化等地。
  6. The algorithm have the good one - way property, high sensitivity to initial values and good security due to the intrinsic characteristic of chaotic system and rijndael algorithm. the simulation experiment demonstrates the convenience and good hash performance ; 3 ) a new scheme of digital voice secure communication was proposed based on chaotic modulation without additional synchronization. the modulation sequence generated by chaotic logical mapping was used to encrypt the digital voice signal

    混沌系統和rijndael演算法的固有特點使該演算法具有較好的安全性、對初值有高度的敏感性以及較好的單向性能,並且易於實現,是一種有效的單向hash函數; 3 )研究了一種無需同步的基於混沌調制的數字語音保密通信系統的方案,利用邏輯映射產生混沌調制序列,以該序列作為密碼對數字語音進行加密處理,為了更好的隱匿信號特徵,混沌調制在小波分解的基礎上,對不同的通道使用不同的參數進行,並借鑒混沌掩蓋對信息信號進行了限幅處理,使密文完全隨機化。
  7. Method uses the following logical sequence to determine the serialization scheme, depending on type of the settings property

    方法根據設置屬性的類型使用以下邏輯序列來確定序列化方案:
  8. In ning bo han quan expands increasingly 2006, the company expands endowment established limited company of tall building materials of ning bo name, introduce germany supreme metal condole supports, the international of the building materials industry such as floor of japanese long xiliu pvc is top - ranking brand, short a few months already signed peaceful wave city marine world of city of major project ning bo, north logical sequence is communal and wholesome city of bureau of inspect of card of city of center, peaceful wave, bank of china, peaceful wave is commercial bank, new edifice of world business affairs, yin dianbin house, from now on our development turned over new one page again

    在寧波漢泉日益壯大的2006年,公司斥資成立了寧波名高建材有限公司,引進德國至高金屬吊頂,日本龍喜陸pvc地板等建材行業的國際一流品牌,短短數月已簽下了寧波市重點工程寧波市海洋世界、北侖公共衛生中心、寧波市證監局、中國銀行、寧波市商業銀行、新天地商務大廈、銀殿賓館、利登公司、嵊州巴貝集團…等一批重大優質工程,從此我們的發展又翻開了新的一頁。
  9. In step of conceptual design, requirement analysis and actor analysis are discussed to analyze erp system using case diagrams and sequence diagrams. in step of logical design, database models and package diagrams are presented in definition of object class, user interface and object class diagrams. in step of physical design, design planning, deployment realization and technology environment of erp system are introduced

    在概念設計階段,重點探討需求分析和角色分析,並採用用例視圖和順序圖來分析erp系統;在邏輯設計階段,充分利用定義對象類、定義用戶介面、定義對象類圖等方法建立erp系統數據庫模型和包圖;在物理設計階段,重點探討系統的設計規劃、部署實現及技術平臺來實現erp系統。
  10. Are my arguments presented in a logical sequence

    我當前的論點是合乎邏輯順序的嗎?
  11. Marked by logical sequence

    連貫的符合邏輯順序的
  12. Don t use a repeated or logical sequence of letters andor numbers, such as aabbcc or abc123

    不要使用重復或有邏輯順序的文字與或數字,如
  13. Your argument lacks logical sequence, for your second point does not follow the first

    你的論據缺乏邏輯順序,因為你的第二點與第一點銜接不上。
  14. You want to process a sequence of logical lines, rejoining those split lines

    需要處理邏輯行,將分開的物理行序列合併連接起來。
  15. A transaction is a sequence of operations performed as a single logical unit of work

    事務是作為單個邏輯工作單元執行的一系列操作。
  16. While in pratical applications, the esd method still has drawbacks in graphical modeling capability, connections with products " structures, size control of esd models, and etc. through in - depth study of the esd method, this paper systematically describes the framework and its basic modeling elements of esd, explains the principles of risk modeling, gives the mathematical model of the basic modeling elements of the esd framework to support the quantitative analysis of the esd model. based on the research above, this paper expands the esd framework, which includes : to overcome the drawback in graphic modeling capability of the esd method, the paper invents some new logical modeling symbols like " n / k " gate, sequence gate, expandable gate and constraint, those enrich the modeling capability of the esd method. to overcome the drawbacks in connections with products " structures and size control, the paper explains the multi - layered modeling principles based on the esd

    在上述研究基礎上,對esd框架進行了擴展,包括:針對esd圖形建模能力的不足,提出了「 n中取k門」 、 「順序門」 、 「可擴展門」以及「限制」等新的邏輯建模圖形符號,豐富完善了esd的建模元素;針對esd模型與產品結構關聯及規模控制方面的局限,提出了基於esd的層次化建模原理,使得可基於esd進行層次模塊化建模;針對esd與其它安全風險分析技術的綜合運用問題,分別討論研究了與故障樹分析技術、馬爾科夫狀態轉移圖集成的esd ft和esd m方法,提高了esd建模的靈活性;針對動態系統風險評價模型的求解問題,討論提出了運用esd求解動態概率風險評價問題的解析解或近似解析解方法,並予以了示例說明。
  17. Pay of company material benefits is all ready, welcome each a man of insight ardently to join in, keep tax the area stands by boreal logical sequence on the west, before sending resume, evaluate carefully please whether can work here

    公司福利待遇齊全,熱烈歡迎各位有識之士加盟,保稅西區靠近北侖,在投簡歷前,請仔細評估是否能在此地工作。
  18. The design innovation have been implemented in the milestone management framework as the following : 1. the milestone management framework consists of 16 business decision milestones from mpp and spd. these milestones are organized into five phases that follow a standard and logical sequence for new product development, which include business case development, portfolio planning, project definition, project implementation, launch and closeout

    里程碑管理框架對傳統的軟體開發項目過程管理模式,主要在以下四個方面進行了新的設計:第一,里程碑管理框架通過16個關鍵的里程碑決策點,將企業的市場產品線規劃mpp和新產品開發spd兩個核心業務過程劃分為商業計劃開發、投資計劃、項目定義、項目實現和項目交付收口五個階段進行管理。
  19. 2. on simulating events ’ sequential - quality, we gave an idea of “ batch ” ; instead of conforming to events ’ physical time precisely, we consider about their logical sequence. we proposed an events simulation method based on the idea “ batch ”, considering spreading quality of events and time - mapping logic simulating methods

    2 .對于繼電控制系統中事件時序的把握,我們沒有拘泥於其物理上的時間次序,而是從邏輯上來考慮事件的先後相繼關系,提出了邏輯清晰的「批」概念。
  20. The logical sequence of this treatise is from abstract to concrete, from theory to practice

    本文的總體思路按照抽象? ?具體、理論? ?實踐的邏輯秩序來展開。
分享友人