main contractor 中文意思是什麼

main contractor 解釋
主承包商, 主承包單位, 總包
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • contractor : n. 立約人,承包人。n. 【解剖學】收縮肌。
  1. Major extension works at sheung shui and tai wai station will commence once the east rail extension project has been finalised. the hk $ 72. 4 million university station concourse extension project was designed by leigh and orange ltd., with kier hong kong being the main contractor

    大學車站擴建工程耗資約港幣七千二佰四十萬元,由利安建築設計及工程開發顧問(中國)有限公司負責設計工作,並由基利香港有限公司擔任承建商。
  2. After the failure launch, the china great wall industry corp , the major chinese contractor of international commercial launching services, released the list of main chinese astrophysicists who comprised the failure analysis group, failure investigation committee and failure examination committee

    這次故障發生后,中國國際商業發射的主承包商中國長城工業總公司於1996年2月18日對外公布了由中國航天專家組成的故障分析小組、故障調查委員會和故障審查委員會主要成員名單。
  3. Lawo also manufactures matrix systems and audio networks, carries out project engineering and acts as a main contractor for radio ob vans

    朗沃還生產矩陣系統和音頻網路,承擔項目工程,同時也作為總包商承攬電臺轉播車製作業務。
  4. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控制的重點包括:設計階段控制好方案對比、設計優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重控制設計成果的長期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要提高承包商的質量自控能力,堅持施工質量的全過程、多方法、多體系控制。
  5. As the main automation contractor, emerson will leverage its significant engineering expertise to design, install and commission the digital automation system and also perform various specialized services on the units ' electrical subsystems, such as the generator, transformers, feeder ducts and switchgear

    作為主自動化承包商,艾默生將派出其最具經驗的工程專家來設計,安裝和調試數字自動化系統,以及為機組的電氣子系統,例如發電機,變壓器,饋電管道和開關設備等,提供多種專業服務。
  6. The paper analyzed the main viewpoint about the legal charater of the project advanced payment, points out that the advanced payment is a interest - free loan the owner provides for helping the contractor to start the project, but is not the payment project funds in advance

    摘要分析了對于工程預付款法律性質的主要觀點,認為預付款是業主為幫助承包商改善資金狀況提供的無息貸款,而非工程放的預先支付。
  7. In mid 80 s, we were the main contractor of a specially designed slaughter house and workshop in the new territories

    其中包括新界聯營屠場和被香港大東電報局委託興建一座大跨度的體育大樓。
  8. Two serving and one former staff members of the main contractor for a home ownership scheme construction project at wang tau hom estate phase 14 in connection with the alleged use of reinforcement ste

    廉政公署拘捕了橫頭?第十四期居者有其屋建築工程總承建商的兩名地盤雇員及一名前職員,懷疑他們使用未能通過檢定測試的高拉力鋼筋花鐵建造居屋上蓋。
  9. A former site administrator of the main contractor for a redevelopment project at wang tau hom estate was sentenced to 120 hours of community service for conspiracy to defraud the housing department in relation to the disposal of non - compliant reinforcement steel bars at the site

    橫頭?重建計劃總承建商的一名前地盤總務員,訛稱已將未能通過檢定測試的高拉力鋼筋運離地盤,串謀詐騙房屋署,被判須履行一百二十小時社會服務。
  10. A subcontractor of an engineering firm was sentenced to 240 hours of community service for submitting false attendance records of plumbers to advance work fees totalling over 110, 000 from the main contractor

    一名工程公司分判商,向總承建商提交虛假的水喉匠值勤記錄,以提前取得共逾十一萬元工程費用,被判須履行二百四十小時社會服務。
  11. Regarding the proposal requiring the main contractor to pay wages directly to the subcontractor s employees, the employment ordinance already has provisions requiring the main contractor of a building and construction project to pay, on behalf of the subcontractor or nominated subcontractor, the arrears of wages payable to the subcontractor employees, not exceeding the wages for the first two months of the period in question

    至於要求總承建商直接支薪予分判商雇員的建議,目前, 《雇傭條例》已有規定,建築及營造行業的總承建商(俗稱大判)須負責代其屬下的分判商或指定分判商(俗稱判頭)支付該判頭拖欠雇員的工資,以欠薪期最初的兩個月工資為限。
  12. In fact, according to the general conditions of contracts for existing public works, if a worker employed by the main contractor files a claim against the main contractor in respect of wages payable to him and can prove to the satisfaction of the commissioner for labour that the claim is reasonable, the government may deduct the same from the contract sum payable to the main contractor so as to settle the claim

    事實上,按照現行公共工程合約條文,若有總承建商僱用的工人向總承建商追討欠薪,並且能向勞工處處長證明其追討合理,政府便可在原定支付予總承建商的款項中,作出扣減,用以支付該等欠款。
  13. Please describe the project team of the development, e. g. architect, main contractor, other professional firm that had been hired

    請描述項目開發團隊,如建築師、主要承包商及所聘其它專業公司。
  14. A senior quantity surveyor of the main contractor for the construction of the sheung shui abattoir was sentenced to four weeks imprisonment for taking 80, 000 in bribes from a sub - contractor for proc

    一名上水屠房總承建商的高級物料測量師,因收受分判商八萬元賄款,作為支付工程費用的報酬,被判入獄四星期。
  15. A senior quantity surveyor of the main contractor for the po lam station of the mass transit railway corporation was sentenced to six months imprisonment for accepting loans totalling 40, 000 for showing favour to a subcontractor

    一名為香港地下鐵路有限公司寶琳地鐵站總承辦商聘用的高級工料測量師,收受共四萬元的貸款,作為給予某分判商優待的報酬,被判入獄六個月。
  16. A senior quantity surveyor of the main contractor for the po lam station of the mass transit railway corporation was charged for allegedly soliciting and accepting advantages for assisting in awarding contracts and showing favour to a subcontractor

    一名為香港地下鐵路有限公司寶琳地鐵站總承建商聘用的高級工料測量師,涉嫌曾索取及收受利益,協助分判商取得合約及向其作出優待,被廉署落案起訴。
  17. He court of appeal dismissed the appeal by a senior quantity surveyor of the main contractor for the construction of the sheung shui abattoir against his conviction of accepting 80, 000 in bribes from a sub - contractor for processing payment of project fees, and ordered him to serve his four - week prison term

    該名高級工料測量師,收受一名分判商八萬元賄款,以加速處理其付款申請,較早前被裁定罪名成立,被判入獄四個星期。
  18. Main contractor : leader - wai kee joint venture

    :利達惠記建築運輸聯營
  19. Highlander construction ltd, the main contractor of a housing development project, employed five

    高原建築工程有限公司為一項房屋發展計劃的總承建商,並僱用了五名天秤
  20. A main contractor and a resident engineer were jailed for five years and four years respectively for defrauding the developer of an industrial plant in yuen long by carrying out substandard foundation

    一名總承建商及一名地盤工程師,串謀在元朗一個建築地盤建造不合規格的地基工程,欺騙發展商發出工程費,分別被判入獄五年及四年。
分享友人