main control station 中文意思是什麼

main control station 解釋
主控臺
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The main products of our company : series of mining emulsion pump station, series of electric haulage shearer, sparying pump station, series of mining flame - proof vacuum / air electromagnetic starter, series of mining vacuum / air feeding switch, series of mining fame - proof and natural - safe. type ac soft starter, series of hydraulic stand valve and pipe system, high flow rate quick - moving valve, the new product nearing into market - the hydraulic support electric - control system, mining electric drill, hydraulic valve test table, electric performance test table

    公司主導產品為:系列電牽引採煤機、系列礦用乳化液泵站、噴霧泵站、礦用隔爆兼本質安全型交流軟起動器、系列礦用隔爆真空、空氣電磁起動器、系列礦用真空、空氣饋電開關、系列液壓支架閥類及管路系統、大流量快速移架閥、即將投入市場的新產品? ?液壓支架電液控制系統、煤電鉆系列、液壓閥試驗臺、電性能試驗臺等。
  2. At last, the paper individually gives the design thought of the three intelligent cards in field control station and their circuit of the main hardware. in the same time, the paper explains the relationship of the three intelligent cards and how they work harmonically

    最後,還給出了現場控制站中三個智能卡的設計思想及主要硬體電路的設計圖,並舉例說明了現場控制站的工作方式。
  3. Transformation of the 4t main transformer cooling control system of lijiaxia hydropower station

    關于風扇磨煤機軸承箱潤滑冷卻油系統的改造
  4. The dcs applications in raw water intake, chlorination and chemical dosage, filtration station, output pumping house, power switching house and main control room are specially described in detail under different conditions of waterworks

    並根據水廠生產的工藝過程,著重介紹了集散控制系統在原水取水、加藥加氯、濾池、配電、出水泵房和水廠控制室中各種不同場合的應用情況。
  5. With the combination of automatic control theory and practical thermal process automation object in the power station, three main fields including nonlinear calibration of thermal instrument, new control strategies of main steam pressure and advanced control strategies of main steam temperature are studied in detail in this paper

    本文將自動控制理論和火電廠熱工自動化的具體對象相結合,進行了3個方面的研究工作:熱工儀表非線性校正、主蒸汽壓力的新型調節策略、主蒸汽溫度的先進控制策略。
  6. The technical problems are clarified and the corresponding solutions are given. ( 1 ) because there are several supervisors for remote viewing, the contradiction between safe operation and monitoring control can be avoided by installing the indispensable main controller and secondary controllers. ( 2 ) the operation state and video information of substations should be displayed on the same screen. ( 3 ) appropriate measures should be taken for the data processing, storing and communication in the multimedia master station systems

    文中闡述了主要的技術問題和相應的解決方案:主站將出現多個遙視控制點,設置必要的主控和分控可以避免安全操作和監視控制上出現的矛盾;變電站工況信息和視頻信息協調顯示的一種較好的方法是同屏演示;主站在數據處理和存儲、通信網路等方面也將相應變化。
  7. The foxboro dcs is regarded as main reference object, it does n ' t same as the traditional simulator. the logic protect and control are separated from model and the configuration control system be exploited in the paper. and the configuration of logic protect and control is operatised at operation station administration system, not to be added into model, not to build control sound code also

    其邏輯保護和控制部分的組態在操作站管理系統進行,不用加入模型,也不用生成控制源代碼,因此很自然的就實現了在線調整、實時控制等類同於實際現場的模式。在本課題中,控制、邏輯保護和電氣邏輯模擬軟體主要包含熱工控制中一些常用的代數和邏輯運算。
  8. To be a widely - used control arithmetic, pid controller had not be substituted for some advanced controlling arithmetic in a long time, on the contrary, the pid control is still on the main station of many kinds of controlling technique as time

    作為一種廣泛的控制規律, pid控制在相當長的一段時間內,並沒有因為各種先進控制演算法的出現而遭到淘汰,相反,經過時間的考驗, pid控制仍然在各種控制技術中占著主導地位。
  9. In this paper, closely connecting with the actual application of automatization on power station and main engine remote control, and based on the experiences in automatization design together with the successively - built vessels of all kinds in our yard, summarized descriptions will go to the present status, performance and characteristics of automatization in machinery room, analysis and discussion will also be given to classified requirement by rules and regulation on system design of monitoring, alarm, remote control and automatic shift of main and auxiliary equipment, including test and inspection ; all of which, by summarizing the design skeleton and the design ideals on ship automatization, have made some guidance with ship automatization design in the future

    本論文結合電站自動化系統和主機遙控系統應用實例,依據艦船自動化系統設計經驗以及我廠成功建造的各型艦船,就艦船機艙自動化現狀、功能和特性、現行規范對自動化船舶分級及入級設計要求、主要配置的監測、報警、輔機的遙控操作和自動切換以及自動化系統的試驗、驗收等進行了綜述;較好地總結了艦船自動化系統的設計規律,基本理順了艦船自動化系統設計思路,可以指導今後的艦船自動化造船設計工作。並以此為基礎,關注艦船電氣自動化的新技術及發展方向。
  10. We have designed and established data collection center exchange network of sale of the whole company, and realized transfers demand of which met six power supply bureau load management systems by using five frequency point, and succeeded in solving the problem of data collection and control management that main station of power supply bureau provided user terminals

    設計、建設了全公司營銷數據採集中心交換網,實現了利用五對頻點滿足六個供電局負荷管理系統的數傳需求,成功解決了供電局主站對用戶終端的數據收集和控制管理問題。
  11. Quality control for steel fiber concrete construction of main plant house of tgp power source station

    三峽電源電站主廠房噴鋼纖維混凝土質量控制
  12. Abstract : main construction points of qingfang hospital station on qingdao subway under the condition of hard surrounding rock are described. blasting control and vibration monitoring are stressedly introduced

    文摘:闡述了青島地下鐵道青紡醫院車站在堅硬巖層中的施工要點,重點介紹了爆破控制、震動監測等內容,對于城市硬質巖石條件下的地下工程具有借鑒意義。
  13. The company is now testing equipment supporting production equipment more than 20 kinds of products, the main products include integrated vehicle grade a performance test stations, testing equipment and detection of three, four, five and one of two maintenance lines, computer network control system, according to gb / t17993 《 automotive performance testing station gm technical conditions 》 gb11798. 1 to 11798. 6 《 automotive safety testing equipment detection technology conditions 》 gb7258 《 safe operation of motor vehicles and technological conditions 》 traffic jt / t198 《 car grading of the technical standards 》 such as the relevant provisions of the standard

    公司現已生產配套檢測設備儀器系列產品20餘種,主要產品有機動車a級綜合性能檢測站、檢測線及檢測設備三位、四位、五位一體及二級維護檢測線等,計算機網路控制系統,依據gb / t17993 《汽車綜合性能檢測站通用技術條件》 、 gb11798 . 1 ~ 11798 . 6 《汽車安全檢測設備檢測技術條件》 、 gb7258 《機動車安全運行技術條件》 、交通部jt / t198 《汽車技術等級評定標準》等標準的有關規定。
  14. Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau, it will not be allowed to use these test reports as the one of unit project quality control documents

    主要是未按設計要求提供出鋼架連接處高強度螺栓抗滑移系數試驗報告和檢測紀錄;由山西省煤炭工業管理局晉城礦區工程質量檢測站出具的試驗報告無計量認證章,在今後的工程中不能再作為單位工程質量控制資料中的試驗報告。
  15. The approaches include the modeling, intelligent control and simulation for main diesel marine engine, the designing and development of a single - chip computer based synchronous - meter utilized in ship power station simulation of marine engine room simulator dms - 2000, the software interface of simulation to the ship main engine remote control system aotochief - 4 and the hardware and software development for the ship autopilot control system

    本文對于船舶柴油主機的建模及自動控制,混合智能控制演算法及其模擬;船舶輪機模擬器中的基於單片機的船舶電站模擬並車同步表研製、船舶柴油主機遙控系統「 aotochief - 4 」的模擬軟體界面及船舶自動舵控制軟硬體系統的研製進行了比較詳細的討論。
  16. Dhi & dcw electrical works acted as main contactor in qinhuangdao port coal terminal fourth phase project and provided the following products and services : car dumper system, conveyor system, two sets of electrical control systems for reclaimer, technical services for central control station, and customer training

    秦皇島港煤四期預留工程總包項目包括:翻車機系統、皮帶機系統和兩臺取料機設備的電控系統成套及人員培訓。
  17. Based on the experience and lesson of the hydropower project management under the planned economy system, the managers of ertan hydropower station tried to find out a new hydropower project management mode, which includes several main points as follows : ( 1 ) : undertake the project management based on the enterprise legal person, and unify the project construction with the goal of sustainable business running. ( 2 ) : carry out the tender system to choose the contractors and manufacturers by fair competition to guarantee the quality and schedule of the project and reduce the cost. ( 3 ) : introduce fidic contract conditions, implement project supervision, set up dispute review board, and invite special advisory group, etc. ( 4 ) : strengthen contract management in order to control the quality, schedule and cost of the project

    二灘水電項目是在國家實施改革、開放政策中進行建設的,總結計劃經濟下水電項目管理的經驗和教訓,二灘水電項目管理者在探索新的水電項目管理模式,主要是實施以企業法人為主體的水電項目管理,把項目建設和企業持續經營的目標統一起來;實行招投標制,在市場競爭中選擇工程承包商和設備製造商,保障工程質量、工期和降低工程造價;引進菲迪克合同條件、實施工程監理、設立爭議評審團、聘請特別咨詢團等,強化合同管理,實行對工程質量、工期和工程造價三大控制;做好資金管理工作,保障項目建設對資金的需要,降低資金成本等。
分享友人