main power station 中文意思是什麼

main power station 解釋
主電站
  • main : adj 1 主要的,主,全,總。2 充分的,盡量的;全力的,有力的。n 1 體力,氣力;力〈僅用於 with might...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The main production includes heat - pipe, heat - pipe exchanger setting, rubber tyre hot water deaerate power station, boiler deaerator, tyre forming machine, rubber cutting machine, vulcanize, vulcanizing pot and the special carbon steel or stainless steel pot for oil, chemical engineering, medicine, chemical fertilizer field use

    濟南仙峰泰山化工設備有限公司主要生產熱管、熱管換熱器、橡膠輪胎廠子午胎斜交胎熱水除氧動力站、鍋爐除氧器、輪胎成型機、切膠機、硫化機、硫化罐,還有石油、化工、化肥、醫藥、冶金、建材等行業使用的各種碳鋼、不銹鋼、有色金屬的塔、罐、釜、換熱器等產品。
  2. The main contents are as follows : in order to finish this work well, the author collected the basic parameters of water cushion in china and foreign countries, and analyzed the questions and shortcoming in the designing of cushion in domestic and abroad, and summarized the design experiment of xiao wan hydraulic power station and ertan hydraulic power station in china, finally the main controlling design parameters of baishan water cushion, that is the allow dynamic impact water pressure and unit water consumed energy rate were asserted

    具體內容如下:為了做好白山水墊塘設計,本文通過收集國內外水墊塘設計的基本參數,分析水墊塘設計存在的問題及不足,總結國內小灣、二灘工程的經驗,確定白山水墊塘設計主要控制參數即允許動水沖擊壓力及水墊塘單位水體消能率。
  3. The main machinery products of our company include : coal mill equipment for power station, metallurgy rolling equipment, cement and crushing equipment and forging press equipment

    我公司生產的機器產品的種類主要有:電站磨煤制粉系統設備、冶金軋鋼設備、水泥破碎設備和鍛壓設備等。
  4. This paper addresses the principle of design model selection of main generator groups for offshore platforms based on the platform power station information provided by some engineering companies together with the design experiences gained by the author

    文章根據有關平臺電站資料,結合筆者從事淺海油田設計經驗,介紹了海上平臺電站主發電機組設計選型原則。
  5. The main products are 35kv - 200kv capacitance casing porcelain cover, mutual inductance porcelain cover and middle - small sized power station, electrical equipment, route electrical porcelain for five category 30 series and 300 kinds

    企業具備多年生產高壓瓷套的經驗和一批熟練的技術工人,以及完善的公用設施。同時,本地能源充足價格較低。
  6. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  7. Power station simulation system has two main parts : part one is the generator sets ? he diesel engine, the generator and accessories. part two includes monitoring, protection, alarm, operation devices as well as devices that regulate the operation of the generator

    模擬電站設備可分為兩大部分:一是發電機組,即柴油機、發電機及其附屬設備;二是監視、保護、報警、操作和控制發電機運行的設備。
  8. By applying the method of reliability technique, according to the eletric equipments reliability evaluate rules, this paper systematically analyzes faults which possibility or usually appear in turbine, generator, speed - adjusting controller in water power station and their reasons and effect factors. meanwhile it also uses the method of fat to study the fmea and preventive fault measures of turbine of zz500 - lh - 1020 and find out the biggest risk from all parts risk in turbine of zz500 - lh - 1020. this paper analyses the technique of reliability management of main equipments

    本論文運用可靠性技術中的有關方法,依據《發電設備可靠性評價規程》對機組的可靠性狀態進行分類,系統地分析了水輪機、發電機、調速器等三大機械主設備中可能或經常出現的故障,產生這些故障的原因及其影響因素;同時,使用故障樹分析方法,研究了zz500 - lh - 1020軸流轉漿式水輪機轉輪的故障模式及其影響,同時也分析了預防處理這些故障的措施;通過危害度分析,找出了zz500 - lh - 1020軸流轉漿式轉輪中各個部件的危害性大小與危害性最大的部件。
  9. With the combination of automatic control theory and practical thermal process automation object in the power station, three main fields including nonlinear calibration of thermal instrument, new control strategies of main steam pressure and advanced control strategies of main steam temperature are studied in detail in this paper

    本文將自動控制理論和火電廠熱工自動化的具體對象相結合,進行了3個方面的研究工作:熱工儀表非線性校正、主蒸汽壓力的新型調節策略、主蒸汽溫度的先進控制策略。
  10. Technique and economy comparison of main connection in huanggou pumped - storage power station

    荒溝抽水蓄能電站電氣主接線技術經濟方案比較
  11. The main results of research in this paper are : the stability and accuracy of the fem calculation program are validated with the reference of the test report on the leading operation of 1 # generator in fengzhen power station

    本論文主要研究成功如下: 1豐鎮電廠1 #發電機進相運行試驗技術報告為參考,驗證了有限元計算程序在計算200mw發電機時的可靠性和精確性。
  12. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  13. This paper based on the result of thermal system test of no. 2 turbine unit in liancheng power station. using compare method and thermal system equal quantity analysis method, analysed the factor lowering turbine unit thermal efficiency. in this, the lower turbine ' s relative intra - efficiency is main factor

    其中,汽輪機相對內效率較設計值低是影響汽輪機組熱力系統效率降低的主要因素;凝汽器真空低於設計值是影響汽輪機組熱力系統效率降低的第二位因素; # 5 、 6高壓加熱器上、下端差大於設計值是影響汽輪機組回熱系統效率降低的又一重要因素。
  14. Based on adequate survey to faults of sodium pump for the china experiment fast reactor, in order that the advanced diagnosis methods are used in the sodium pump which is under fabrication, different methods of fault diagnosis system of sodium pump are designed and programmed ; and the principal component analysis ( pca ) is used to fault diagnosis system of main coolant pump in a nuclear power station. the feasibility of fault diagnosis systems developed have been proved by simulation results

    本課題對中國實驗快堆鈉泵的故障進行了研究,把先進的診斷方法應用到正在製造中的鈉泵上,設計和開發了不同方法的鈉泵的故障診斷系統;同時也應用主元分析方法,建立了某核電廠的主冷卻劑泵的故障診斷系統,模擬實驗證明了以上三個系統的可行性。
  15. In this paper, closely connecting with the actual application of automatization on power station and main engine remote control, and based on the experiences in automatization design together with the successively - built vessels of all kinds in our yard, summarized descriptions will go to the present status, performance and characteristics of automatization in machinery room, analysis and discussion will also be given to classified requirement by rules and regulation on system design of monitoring, alarm, remote control and automatic shift of main and auxiliary equipment, including test and inspection ; all of which, by summarizing the design skeleton and the design ideals on ship automatization, have made some guidance with ship automatization design in the future

    本論文結合電站自動化系統和主機遙控系統應用實例,依據艦船自動化系統設計經驗以及我廠成功建造的各型艦船,就艦船機艙自動化現狀、功能和特性、現行規范對自動化船舶分級及入級設計要求、主要配置的監測、報警、輔機的遙控操作和自動切換以及自動化系統的試驗、驗收等進行了綜述;較好地總結了艦船自動化系統的設計規律,基本理順了艦船自動化系統設計思路,可以指導今後的艦船自動化造船設計工作。並以此為基礎,關注艦船電氣自動化的新技術及發展方向。
  16. In other words, it adopts the principle of main prevention and planned examination to enhance the equipment reliability. in the water power station, whether mechanical equipments maintenance or electric equipments maintenance, the planned maintenance is adopted in the whole of maintenance in order to accomplish the production - reliability target for increasing economy benefit. the production - reliability target includes fof ( forced outage factor ), eaf ( equivalent availability factor ), po ( times of planned outage ), uo ( times of unplanned outage ) etc

    在水電廠,不論機械設備還是電器設備,幾乎都是採用固定周期的檢修或更換的處理方法預防事故的發生,完成發電企業確定的可靠性生產指標:提高機組的等效可用系數,降低強迫停運次數,減少機組的非計劃停運次數(次/臺年)等,從而提高企業的經濟效益。
  17. Main propulsion equipments have been gradually improved. in addition, some additional systems are provided, such as the power station, deck machinery, refrigeration and air condition plant, freshwater generators, drinking water system, steam generating system, ballast and bilge system, and fire fighting system. the management of ship ' s power plant is also known as the engineering management, which is supervised and controlled by the engine department under the direction of the company ' s engine technology management department of the headquarters. owing to the complexity of power plant, the changeability of navigational conditions, and the seriousness of accident ' s consequences, it is essential to explore how to manage the power plant economically and reduce the occurrence of troubles so as to raise the shipping efficiency

    隨著科學技術的發展,不僅推進設備逐步得到完善,而且還增設了諸如船舶電站、起貨機械、冷藏和空調裝置、制淡水裝置以及飲水、蒸汽、壓縮空氣、壓載、艙底、消防等系統。船舶動力裝置的管理即輪機的管理,是在船公司機務部門指導下由船上輪機部具體負責實施。因為船舶動力裝置的復雜性、船舶航行條件的多變性、發生事故後果的嚴重性,所以探討如何對輪機進行經濟性管理,減少故障,從而提高船舶的營運效率非常重要。
  18. This paper covers a new environment - friendly coal storage yard technology, focusing on features, structure, main components, operation modes, storage capacity calculation of circular storage yard and its application to coal - fired power station

    摘要介紹一種新型環保的儲煤場技術,詳細論述了圓形儲料場的特點、結構形式、主要部件、運行方式、儲量計算及在火力發電廠的應用。
  19. The approaches include the modeling, intelligent control and simulation for main diesel marine engine, the designing and development of a single - chip computer based synchronous - meter utilized in ship power station simulation of marine engine room simulator dms - 2000, the software interface of simulation to the ship main engine remote control system aotochief - 4 and the hardware and software development for the ship autopilot control system

    本文對于船舶柴油主機的建模及自動控制,混合智能控制演算法及其模擬;船舶輪機模擬器中的基於單片機的船舶電站模擬並車同步表研製、船舶柴油主機遙控系統「 aotochief - 4 」的模擬軟體界面及船舶自動舵控制軟硬體系統的研製進行了比較詳細的討論。
  20. Evaluation of scheme economic evaluation for main wiring in pushihe pumped - storage power station

    蒲石河抽水蓄能電站主接線設計方案經濟性評定
分享友人