maintain project schedule 中文意思是什麼

maintain project schedule 解釋
建立和維護項目實施進度表
  • maintain : vt. 1. 保持;維持;繼續。2. 堅持,維護。3. 供養,扶養。4. 維修,保養。5. (堅決)主張;強調。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Multithreading and message drive mechanism is applied to simulate the intercurrent and schedule of the multitask in power distribution system, which builds the foundation of the development based on real - time operation of the project. at the same time, the software deals with the real - time data by the means of memory database and uses the thread security class to maintain the data ' s integrity

    利用windows的消息驅動和多線程機制模擬了配電系統中多任務的並發和調度過程,為課題在嵌入式實時操作系統下的開展打下了一定的基礎;同時,對系統中大量實時數據則採用內存數據庫管理方式,並利用線程安全類來保證讀取數據的完整性。
  2. After analysising the five factors ( schedule, quality, investment, claim, risk ) which influence the limit point, this paper presents that the clients should decide the time for the construction in accordance with their own characterististics and utilizing benefits, and decide the project quality according to the sum of purchasing costs ( the price of contracts ) and the utilizing costs ( the costs to run and maintain ), and make it most possible to use supervisim optimal design and construction and to reduce claim and risk, which gives the clients a satisfying project with minimal investmentat the same time, this article tells the contractors how to optimize and make decision to minimize the costs in practice on the basis of meeting the requirment of the clients

    在分析了影響極值點的進度、質量、投資、索賠和風險五大因素之後,提出了業主應結合自身的特點,根據工程使用效益來決定工期,根據購置成本(即合同價格)和使用成本(即運行費和維護費)之和來決定工程質量水平,並盡可能通過監理來優化設計、優化施工,減少索賠和風險,使業主最終既能得到滿意的工程,又能使總資金投入最小。同時,也指出承包商應如何在滿足業主要求的前提下,進行優化和決策,使實際發生的成本最小。
分享友人