mass shield 中文意思是什麼

mass shield 解釋
大防護術
  • mass : n 彌撒;彌撒的儀式[禱告、音樂];彌撒曲。 a high [solemn] Mass (有燒香、奏樂等的)大彌撒。 a low ...
  • shield : n 1 盾;盾牌。2 罩;屏;屏蔽。3 防禦物;保護物。4 防禦;保護。5 保護者;庇護者[人]。6 盾形物;【...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Its true, a blue blizz employee has confirmed that the new priest spell, mass dispel, will dispel divine shield

    冷靜下來吧,關于無敵能被驅散,的確,一個官方的論壇發言人已經確認過牧師的新技能,群體驅散可以驅散我們的無敵。
  3. According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too

    本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結構這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。
  4. 3d finite element simulation on deformation of soil mass during shield tunneling

    地鐵隧道盾構法施工過程中地層變位的三維有限元模擬
  5. In the course of building underground railroad with shield driven method, in order to greatly shorten the construction period, improve construction quality, assure construction safety and greatly reduce the environment influence, applying shield driven method can produce mass benefits and immensely reduce the project cost as a whole

    採用盾構法修建地鐵時,為了大幅縮短建設周期,提高建設質量,確保施工安全和極大地減小對周圍環境的影響,並能通過盾構法的長距離應用產生的規模效益,從總體上可較大幅度地降低工程造價。
分享友人