measurement station 中文意思是什麼

measurement station 解釋
測點
  • measurement : n. 1. 測量,計量,量度。2. 份量,尺寸,大小,寬度,厚度,深度(等)。3. 測量法。 measurement goods (按體積、容積計算的)體積貨物。
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. A general talk about total station apparatus triangulated height measurement

    淺談全站儀三角高程測量
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  3. Highways winter maintenance plant and highways side equipment maintenance - deicing agent sprayer - fixed station test method for flow rate measurement

    高速公路冬季維修設備和高速路路邊設備維修.除冰劑噴灑機.流率測量固定站試驗方法
  4. Widely applied in measurement of hot air of desoldering station and liquid of tin stove by k detector probe

    利用k熱電偶導線,可測量熱風手柄的熱風,或錫爐的錫液溫度。
  5. Road construction and maintenance equipment. bituminous binder spraying machine. dosage measurement and transverse distribution fixed station test bench and method

    築路和養路設備.瀝青黏合劑噴灑機.澆注機橫向分配與劑量的定位試驗臺和試驗方法
  6. Comparison of geostress measurement between ae method with stress relief by overcoring in silin power station, guizhou province

    法與套心法地應力測量結果的比較
  7. ( 4 ) applying measurement noise automatic weighting kalman filter to the guidance of line - guidance torpedo, we compromised target information and torpedo information, which in turn come from sonar of guidance station and inertial measurement units of torpedo

    ( 4 )將多傳感器量測噪聲自動加權卡爾曼濾波應用在線導魚雷制導中,融合來自製導站聲納測量到的目標信息和來自魚雷慣性測量組件的魚雷位置和姿態等信息進行了模擬研究。
  8. Inferential measurement technique application in urban drain pump station control systems

    推斷測量技術在城市排水泵站控制系統中的應用
  9. The observatory conducts upper - air measurements three times daily at 8am, 2pm and 8pm at king s park meteorological station. each measurement involves the launch of a meteorological balloon about one - metre wide carrying a radiosonde

    每次施放一個約一米直徑的氣象氣球,攜帶無線電探空儀升上高空,最高可達三十公里(十萬英尺)的高度。
  10. Measurement of liquid flow in open channels - stream flow measurement - guide for the establishment and operation of a gauging station

    明渠流量測量.第3部分:河川流量測量.第b節:水文測量站建立和工作指南
  11. Analysis and demonstration of cableway automatic flow measurement in baimashi hydrologic station

    白馬寺水文站纜道自動測流系統的分析論證
  12. It came true to take advantage of transfer standard to compare and analyze the naturalgas standards of measurement on site. the dissertation used the transfer standards to take the site comparative experiments to the sonic nozzle standard measurement of the nation crude oil great flux measure station carried by vehicle and the standard measurement of the general pertrifaction plant. it evaluated and analyzed the measure capability of these two standards, thus to keep them fulfilling the rules of the verification and the regulations of relative criterions

    本文通過使用傳遞標準,對國家原油大流量計量站車裝音速噴嘴標準裝置和大慶石化總廠計量站氣體計量標準裝置進行現場比對試驗,對這兩項天然氣計量傳遞標準裝置的計量性能進行了評價和分析,使國家站和大慶石化的天然氣流量計量標準裝置達到了檢定規程和相關標準的規定要求。
  13. Measurement of dynamic stress for the vane of hydraulic turbine at yantan power station

    巖灘水電廠水輪機轉輪動應力測試
  14. Acoustics - noise emitted by machinery and equipment - measurement of emission sound pressure levels at a work station and at other specified positions - method requiring environmental corrections

    聲學.機械裝置及設備發出的噪聲.工作地點和其它試驗場所聲壓級的測量.測試要求環境條件的改變
  15. Acoustics. noise emitted by machinery and equipment. measurement of emission sound pressure levels at a work station and at other specified positions. method requiring environmental corrections

    聲學.機械裝置及設備發出的噪聲.工作地點和其它試驗場所聲壓級的測量.測試方法要求環境條件修正
  16. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  17. On the basis of the project practice, in light of the basic methanical principles of tunnel, it is profoundly analyzed that dynamic state of strata, construction design, methods, technology and administration ( including measurement ) related to buiding subway station in this dissertation, which provedes grounds of argument and evidences in therory, technology and economy

    在實踐的基礎上,本文結合隧道力學基本原理和工程實績,對「暗挖逆築法」的地層動態、結構設計、施工方法、施工技術及施工管理(包括量測)等進行了較為詳細地分析和研究。為建立該方法從理論、技術和經濟上提供了依據和論證。
  18. Several important matters in pipe jacking construction are introduced, which are the design of jacking force, relay station and disposal of joints ; moreover its effect factors and treating measurement are discussed

    介紹了頂管施工中的幾個重要問題:頂力設計、中繼站和管接頭的處理,並討論了其影響因素及處理措施。
  19. The sources of measurement shortage at woliang crude transition measurement station and its controlling counter - measures

    臥兩交接計量輸差來源與控制對策
  20. Liquid flow measurement in open channels - establishment and operation of a gauging - station and determination of the stage - discharge relation

    明渠中水流量的測定.測量站的建立和使用及水位流量關系的測定
分享友人