mechanical bank 中文意思是什麼

mechanical bank 解釋
玩具儲蓄箱。

  • mechanical : adj 1 機械的;機械制的。2 機械學的,力學的;物理上的(opp chemical)。3 機工的,技工的;自動的;...
  • bank : n 1 堤,堤防;岸,河畔。2 埂,壟,堆。3 (海中水下的)沙洲,灘。4 斜坡,邊坡,坡度;轉彎。 【航空...
  1. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構面對基巖斜坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立斜坡地質模型和數學模型的關鍵和評價斜坡穩定性的基礎。巖層層面斷裂構造節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖斜坡穩定的軟弱結構面,這些成因不同大小不一的結構面將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖斜坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是斜坡失穩的內在原因。
  2. The mechanical genesis of the complicated rock mass is because several times of tectonism in pro - period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. after that the fractures in the right dam foundation slope were stretched at the beginning of the quaternary period because in the period yakouhoushan mountain quaquaversal dome was blowups quickly. at the same time, the valley trenching of lancang river reach to 800 - 1000 meter in altitude at the right bank in nuozadu dam site

    導致右岸巖體復雜化的成因是,右岸巖體在早期遭受了多期構造作用和巖體蝕變的基礎上,第四紀早期丫口後山穹隆的快速隆起與當時河谷下切至800m 1000m高程這一特殊因素組合引起了右岸巖體沿原有的斷裂(裂隙)張開,使地下水等風化營力能夠到達坡體較深部位,經過長期的風化卸荷作用,形成了右岸復雜巖體。
  3. Neither the bank, its associates, nor any of their directors, officers or employees, shall be liable to the customer for any expenses, loss or damage suffered by or occasioned to the customer by reason of any action taken or omitted to be taken by any one or all of the bank, its associates, their directors, officers, employees or agents pursuant to these conditions or in connection therewith other than as a result of the fraud, wilful default or negligence of the bank, its associates, their directors, officers, employees or agents ; the bank s failure in good faith to honour any stop - payment instructions given by the customer ; the presentation to the bank of any cheque or other payment order which is post - dated ; the bank failing to honour any draft drawn on it by the customer, but the bank shall immediately return such draft to the customer through the normal channels giving the reason for the dishonour ; any loss, damage, destruction or misdelivery of or to the securities howsoever caused unless the same shall result from the negligence of, or theft by, the bank or its associates or any of their directors, officers or employees, in which event the extent of the liability of the bank shall be limited to the market value of such securities at the date of discovery of the loss and even if the bank has been advised of the possibility of such loss or damage ; unauthorised use or forging of any authorised signature as a result of the negligence, wilful default or fraud of the customer ; subject to condition 5. 5, any act or omission, or insolvency of, any person not associated with the bank including, without limitation, a third party nominee or depositary ; viii the collection or deposit or crediting to the custodian accounts of invalid, fraudulent or forged securities or any entry in the custodian accounts which may be made in connection therewith ; any malfunction of, or error in the transmission of information caused by, any electrical or mechanical machine or system or any interception of communication facilities, abnormal operating conditions, labour difficulties, acts of god, or any similar or dissimilar causes beyond the reasonable control of the bank and notwithstanding paragraph, the error, failure, negligence, act or omission of any other person, system, institution or payment infrastructure

    本行其聯系人士其各董事高級人員或雇員均毋須向客戶因以下理由而使客戶蒙受或產生之任何開支損失或虧損負責: i本行其聯系人士其董事高級人員雇員或代理人根據此等條件採取或遺漏採取有關之行動,但由於本行其聯系人士其董事高級人員雇員或代理人之欺詐行為故意失責或疏忽所造成者除外ii本行本真誠地未能依約替客戶執行止付指示iii向本行提交任何遠期支票或其他付款指示iv本行未能兌現由客戶開出之匯票,但本行將立即透過正常渠道將該匯票退回客戶,並解釋拒付之理由v無論如何導致之任何證券之損失損毀毀壞或錯誤交付除非上述各項乃因本行或其聯系人士或其任何董事高級人員或雇員之疏忽或盜竊所引致,而在該等情況下,本行的責任將只限於在發現損失當日該等證券之市值,以及即使本行已獲知該等賠償之可能性vi因客戶之疏忽故意失責或欺詐行為而導致的任何偽造授權簽名或不獲授權使用該簽名vii在第5 . 5 a條之規限下,與本行無關者之任何行動或遺漏或無償債能力包括但不限於第三者代名人或寄存處viii代收或存入或貸存於保管人賬戶的無效偽造或假冒證券或在保管人賬戶記入可能與此有關之賬項ix任何電子機械或系統失靈或因該等機件或系統產生的資料傳送錯誤或任何通訊設施之終斷不正常操作情況勞工問題天災或非本行所能合理控制之任何類似或非類似原因及x盡管有第ix項,任何其他人系統機構或付款設施的錯誤故障疏忽行動或遺漏。
  4. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  5. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  6. The bank said the loan will aid chery in its foreign investment and overseas contracts for its cars and other mechanical, electrical and high - tech products. the move furthers state support to the domestic auto industry inits efforts to enter the international market

    「尼奧普蘭」客車研究所所長李冬梅介紹說,這兩款車總載客人數分別可以達到99人和120人,車內還設有輪椅和嬰兒乘坐區,更加體現人性化特點。
  7. The convention was hosted by hongkong post and co - organized by ten renowned member organizations, namely, electrical and mechanical services department, the hong kong and china gas company limited, the hong kong jockey club, hsin chong real estate management limited, kowloon - canton railway corporation, mass transit railway corporation, motorola semiconductors hong kong limited, standard chartered bank, tuen mun hospital and vitasoy international holdings limited

    今屆交流會由香港郵政主辦,由本地十間著名機構協辦。這些成員機構分別為機電工程署、香港中華煤氣有限公司、香港賽馬會、新昌地產管理有限公司、九廣鐵路公司、地鐵公司、萬力半導體香港有限公司、渣打銀行、屯門醫院及維他奶國際集團有限公司。
分享友人