money of the day (mod) prices 中文意思是什麼

money of the day (mod) prices 解釋
付款當日價格
  • money : n 1 貨幣;錢 金錢。2 財產 財富 財力。3 〈主 pl 〉 (特種)貨幣;通貨;〈pl 〉〈古語〉【法律】金額...
  • of : OF =Old French 古法語。
  • the : 〈代表用法〉…那樣的東西,…那種東西。1 〈用單數普通名詞代表它的一類時(所謂代表的單數)〉 (a) 〈...
  • day : n. 戴〈姓氏〉。n. 1. 日,一日。2. 節日;規定的日期,約定的日子。3. 晝,白晝,白天;日光。4. 〈常 pl. 〉時代;全盛時代。5. 壽命,生平。6. (某日的)戰斗;勝負,勝利。
  • mod : n. 〈亦 M-〉〈英國〉現代派分子,時髦派分子〈英國六十年代的嬉皮士〉。adj. 〈亦 M-〉現代派分子的;有現代派分子的特點的。
  • prices : 公平價格
  1. Pwsc endorsed a commitment to upgrade part of 469cl to category a at an estimated cost of $ 119. 1 million in money - of - the - day ( mod ) prices to carry out site preparation and infrastructure works in the north apron area of the former kai tak airport to prepare the site for future developments including scl

    工務小組委員會通過把469cl號工程計劃的一部分提升為甲級,按付款當日價格計算,估計所需費用為1億1 , 910萬元,以便在前啟德機場北面停機坪進行地盤整理工程及基礎設施,以整理地盤作日後發展之用,有關發展項目包括沙田至中環線。
  2. Pwsc endorsed a commitment to upgrade part of 6gb to category a at an estimated cost of $ 104. 1 million in money - of - the - day ( mod ) prices for the employment of consultants to carry out site investigation, schematic proposal, detailed design, contract documentation, environmental impact assessment and drainage impact assessment for the proposed expansion of kiosks and other facilities at lok ma chau ( lmc ) boundary crossing

    工務小組委員會通過開立承擔額,把6gb號工程計劃的一部分提升為甲級;按付款當日價格計算,估計費用為1億410萬元,用以委聘顧問就建議擴建落馬洲跨界通道檢查亭及其他設施的計劃進行地盤勘測工作、制訂建議計劃大綱、進行詳細設計、擬備合約文件,以及進行環境影響評估和排水影響評估。
  3. A commitment to upgrade 237es, 252ep and 276ep to category a at an estimated cost of $ 118. 2 million, $ 103. 2 million and $ 92. 1 million respectively in money - of - the - day ( mod ) prices for the construction of a secondary school at kai lai road, a 30 - classroom primary school at wang chiu road and a 24 - classroom primary school at kai lai road, kowloon bay

    Pwsc ( 2000 - 01 ) 53建議一項承擔額,把237es 、 252ep和276ep號3項工程計劃提升為甲級;按付款當日價格計算,估計費用分別為1億1 , 820萬元、 1億320萬元和9 , 210萬元,用以在九龍灣興建3所學校,分別是啟禮道的1所中學,宏照道1所設有30間課室的小學,以及啟禮道1所設有24間課室的小學。
  4. Pwsc endorsed a commitment to upgrade 787th to category a at an estimated cost of $ 58. 9 million in money - of - the - day ( mod ) prices to employ consultants to undertake an investigation study for the section of the proposed hzmb between the boundary of hong kong and the landing point at northwest lantau, i. e. hong kong section ( hks ), and the connecting road with the north lantau highway, i. e. north lantau highway connection ( nlhc ), and to develop a conceptual design for the hks of hzmb as well as a preliminary design for nlhc

    工務小組委員會通過一筆承擔額,把787th號工程計劃提升為甲級,按付款當日價格計算,估計所需費用為5 , 890萬元,用以委聘顧問進行勘測研究,范圍包括建議的港珠澳大橋位於香港邊界至大嶼山西北部?陸點的一段橋梁,即香港段的該部分橋梁,以及連通大橋香港段與北大嶼山公路的北大嶼山公路連接路,即北大嶼山公路連接路,並進行港珠澳大橋香港段的概念設計工作及北大嶼山公路連接路的初步設計工作。