nanjing metro 中文意思是什麼

nanjing metro 解釋
南京地鐵
  • nanjing : 建康府
  • metro : n. 〈英國〉1. = the Metropolitan Railway. 2. 地下鐵道。3. 〈m-〉大都市地方政府。adj. 〈m-〉大都市的。
  1. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及拱腰;大部分地段的液化區出現在隧道頂板上方。
  2. Monitoring technology of open deep excavation foundation work of nanjing metro

    南京地鐵明挖法深基坑工程監測技術
  3. In famous constructions and key projects such as capital international airport, sanxia three gorges hydropower project, nanjing metro subway, qingdao good - world sea palace, jinan railroad sub - bureau, suzhou amusement park, beijing 1st heating power plant, china 2nd autombile plant, xian peace villa, our products continue to operate safely

    其技術性能指標達到目前國內同類產品的領先水平,其空載損耗比s11型配電變壓器的空載損耗降低60以上。同時,由於本產品採用全密封結構,絕緣油和絕緣介質不與空氣接觸,因而可在潮濕的環境中運行,是城市和農村配電網路中理想的配電設備。
  4. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  5. This paper show the brief introduction the nanjing metro line 1 and the environment along the line, analyze the problems in the design and the construction stage

    摘要介紹南京地鐵1號線一期工程線路概況及沿線環境特點,通過實例對線路設計中的經驗和後期施工過程中發生的問題進行分析。
  6. Selection and life - cycle cost analysis of water chillers for nanjing metro

    南京地鐵冷水機組選擇與全壽命周期費用分析
  7. Based on some calculation methods on transverse ground settlement, the mechanics of ground settlement caused by shield tunnel construction are discussed. in combination with the shield driven section from xuanwu gate station to new mofan road station of nanjing metro, the monitoring data are analyzed. mainly zone and the subordinate zone of ground settlement caused by shield tunneling is summed up, and the influence zone are definite

    2 、通過對盾構推進產生地表沉降機理的論述,在總結了各種理論計算方法的基礎上,結合南京地鐵玄武門新模範馬路區間的實際情況,實測了大量的橫斷面數據,並進行分析研究,得出了盾構推進對地表影響的主區域和次區域,明確了盾構推進時對橫向地表的影響范圍,研究結論具有很好的社會效益和經濟效益。
  8. Venue : 17 / f, 58 liu he road ( nanjing east road ) metro line 1 & 2 at people square station ; or line 2 at east nanjing road station. ( please see detailed map as attached

    上海市六合路58號新一百大廈17層(南京東路800號第一百貨東樓,東方商廈後方) .地鐵一,二號線人民廣場站或二號線南京東路站。
分享友人