no-load test 中文意思是什麼

no-load test 解釋
空載試驗
  • no : adj 1 〈加在單數名詞前,相當于冠詞 a an 的否定形式〉(一個也)沒有。 Is there a book on the table...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. No - load characteristic test

    空載特性試驗
  2. Stand test methods of diesel locomotives - locomotives no - load performance test

    內燃機車臺架試驗方法機車空載性能試驗
  3. Windings d. c. resistance measurement, measurement of impedance voltage and on - load loss, measurement of no - load loss and on cload current, power frequency withstand voltage test, inductive voltage with standing test, measurement of partial discharge level, inspection of appearance and dimension inspection of name plate

    直流電阻測試匝數比測量及電壓矢量關系的校定阻抗電壓及負載損耗的測量空載損耗及空載電流的測量工頻耐壓測試感應耐壓測試絕緣電阻測試局部放電測試外觀和尺寸的檢驗銘牌的檢驗等。
  4. The combustion - optimizing and automatic control system is being adopted on boiler no. 2 in jiaozuo power plant, successfully realizing the combustion optimizing control of said boiler under constant load and varying load conditions, the on - line combustion debugging test, and the monitoring analysis of operation economic behavior, making the said boiler always to be safe operation with highest efficiency, enhancing averagely the boiler efficiency to more than 0. 5 %, economic benefit being obvious

    摘要焦作電廠2號爐採用燃燒優化與自動控制系統,成功地實現了鍋爐定負荷和變負荷過程的燃燒優化控制、鍋爐在線燃燒調整試驗和運行經濟監測分析,使鍋爐時刻在最高效率下安全運行,鍋爐效率平均提高0 . 5 %以上,經濟效益顯著。
  5. Test code for machine tools. part 1 : geometric accuracy of machines operating under no - load or finishing conditions

    機床試驗規程.非負載或精加工條件下機械加工的幾何精確度
  6. Initial recovery voltage and peak recovery voltage across the circuit - breaker have an essential affect on re - strike. for assessing performance of circuit - breaker, the higher inductance and lower inductance must be considered at the same time when testing according to theoretic analysis, the directly test circuit on switching the no - load overhead by high - voltage circuit breakers of rated voltage 252kv and below, in compliance with the correlative standard jb5871 and the test devices, and the test circuit parameters have been calculated and the many testes have been carried out

    在理論分析的基礎上,考慮實驗室現有設備的情況依據標準jb5871的規定,選用合適的試驗設備,對試驗線路的參數進行計算,在實驗室建立了252kv及以下電壓等級斷路器開合線路充電電流直接試驗線路,利用該線路進行了數臺產品的試驗,分析了試驗結果,並根據試驗結果和理論基礎討論了gb t1984 - 200 《交流高壓斷路器》 (報批稿)關于開合線路充電電流試驗的有關規定。
  7. When switching the no - load overhead lines by alternating - current high - voltage circuit breaker which is a kind of daily operations in electric power system, over - voltage is probably bringed out and insulating property of the electric devices is breakdowned sometimes, especially, when occuring re - strike. the main purposes that the tests on switching line - charging current are performed in the laboratory are assessing re - strike performance of circuit - breakers. according to the test results, the design of the circuit - breaker is optimized and re - strike performance is improved

    交流高壓斷路器是電力系統中最關鍵最重要的設備之一,斷路器開合空載架空線路是電力系統中常見的操作,操作過程中通常會出現過電壓,對系統絕緣造成威脅,嚴重時會破壞系統的絕緣性能,發生事故,隨著電力系統電壓等級的提高、輸電線路不斷延長及傳輸容量的增大,由操作過電壓引起的絕緣閃絡、設備破壞事故的幾率更加突出。
  8. Abstract : based on the classical theory, the harmonic winding potential of the tooth harmonic brushless exciting generator have been calculated and analysed. the results tally with the data of no - load test very well. it was demonstrated the designing thread of harmonic winding is correct

    文摘:從經典理論出發,對齒諧波無刷勵磁發電機的諧波繞組電勢進行了分析計算,其結果與空載實驗得出的數據完全吻合.說明諧波繞組的設計思路是正確的
  9. A motor that is be directly coupled to a fan - blade or blower - wheel load is to be operated at the applicable test voltage and under no - fan, no - load conditions with the shaft running free

    直接耦合到一個風扇葉片或鼓風機葉輪負荷的馬達,將在適用的試驗電壓下做無風扇,無負荷,軸空轉狀態的運行。
  10. Pressure seal design without live load bonnet ( no spring washers ) : the gasket bolt tightness must be rechecked after operating test pressure and temperature has been achieved

    沒有動負載閥帽的壓力密封結構(沒有彈簧墊圈) :在工作試驗壓力和溫度達到限制值時,必須重新檢查墊圈螺栓的緊固性。
  11. Load test and analysis on a bridge on national highway no

    105國道某大橋荷載試驗及分析
  12. Based on the theoretical solutions developed herein, not only q - s curve but also s - log ( t ) curve obtained from field static load test of pile can be simulated. this overcomes the shortcoming involved with available relevant theory for pile settlement that no time effect can be taken into consideration, and thus makes the theory for pile settlement more perfect

    利用本文的理論解不但可以較好地模擬單樁在工作荷載下的q - s曲線,而且可以模擬單樁靜載荷試驗的s - logt曲線,從而克服了以往相關理論難以考慮單樁沉降的時間效應的不足,豐富和完善了單樁沉降計算理論。
  13. The spiral sheet metal carry the lotus test to be apply in the bearing power test of the deep foundation soil and water table following foundation soil extensively because the ability goes into the surface of earth is following the certain depth area curve carry on test, according to the element that the spiral sheet metal carries the lotus test, through contrast with plate load test, the spiral sheet metal carries the lotus test to be applicable to the shallow storey foundation soil equally, the size of the spiral sheet metal time area concentration diagram is not big to the test result influence, the spiral sheet metal carries the bearing power of the lotus test assurance to no longer carry on the depth area curve redress

    摘要螺旋板載荷試驗因能旋入地面以下一定深度進行試驗而廣泛應用於深層地基土及地下水位以下地基土的承載力測試,根據螺旋板載荷試驗的原理,經與平板載荷試驗對比,螺旋板載荷試驗同樣適用於淺層地基土,螺旋板面積的大小對試驗成果影響不大,螺旋板載荷試驗確定的承載力不再進行深度修正。
  14. Test code for machine tools - geometric accuracy of machines operating under no - load or finishing conditions

    機床試驗法規.在空載或精加工條件下機床工作的幾何精度
  15. Test code for machine tools - part 1 : geometric accuracy of machines operating under no - load or finishing conditions

    機床檢驗通則第1部分:在無負荷或精加工條件下機床的幾何精度
  16. Machine tools - test code for machine tools - part 1 : geometric accuracy of machines operating under no - load or finishing conditions iso 230 - 1 : 1996

    機床.機床試驗規程.第1部分:在無負載和精加工狀況下
  17. Second, engine ' s partial velocity characteristics model and universal characteristics model are built the throttle opening is considered as an essential factor to build the model for reflecting the actual working performance of engine. the situation of the throttle opening change is studied, and a simulation method is given to use torque curved surface and vehicle dynamics equation on base of differential approach method. engine test software is developed for the engine no - load test, variable throttle opening test and throttle step change test

    其次,建立了發動機的部分速度特性模型和萬有特性模型;為了更好的反映發動機的實際工作特性,將油門開度作為一個重要參數參與建模,並對發動機變油門的情況進行了研究;結合轉矩曲面和整車動力學方程,採用微區間逼近法確定了發動機變油門過程模擬方法;開發了發動機試驗測控軟體,利用該軟體進行了發動機空載響應試驗、發動機不同油門開度試驗和油門階躍變化試驗,並對實際試驗數據和數學模型計算數據進行對比;在vc + +平臺上開發了發動機特性模擬模塊,在系統中用軟體實現了變油門控制發動機特性的功能。
  18. As no flexible field load test has been developed, prototype observation and numerical analysis are reasonable way to study composite foundation under embankment

    目前還沒有在柔性荷載下進行現場試驗的方法,加強現場測試和計算分析是探討路堤下復合地基工作性狀的一種途徑。
  19. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試指標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系數k _ ( c1 )和k _ ( c2 )及深度修正系數,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行數值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸探試驗指標以及施工工藝修正系數等預測黃土地基中鉆孔灌注樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  20. The load test for bridge no. str18 foreground has been completed while work continues on the construction of the abutments pier for bridge no. str19 background

    鄰近於長沙橋編號str18的樁柱負載測試經已完成前景觀與及繼續進行橋編號str19的橋墩和中間橋墩的工程後景觀
分享友人