nuclear thermal power plant 中文意思是什麼

nuclear thermal power plant 解釋
供熱核電站
  • nuclear : adj 1 核的,成核的;有核的。2 【物理學】原子核的;原子能的;原子彈的;核動力的。3 〈比喻〉核心的...
  • thermal : adj. 1. 熱的,熱量的,溫熱的;由熱造成的。2. 溫泉的。n. 【航空】上升暖氣流。adv. -ly
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. Ln power system full dynandc simulation, the electric - mechanical transient processes of dynamic elements of power system should be simulated in detail, and the detailed dynandc models of mid - term and long - term processes are necessary based on the research and analysis for the ndd - term and long - term models, the dynandc models, such as thermal power plant, hydraulic power plant, nuclear power plant and the automatic generation control ( agc ), which are necessary to power syst

    電力系統全過程動態模擬除了需要詳細模擬電力系統動態元件的機電暫態過程外,還要有詳細的中長期過程的模型。本文在綜合調查和分析的基礎上,研究了電力系統全過程動態模擬所需要的火電廠動力系統的數學模型、水電廠動態模型、壓水堆核電站模型以及自動發電控制( agc )模型及其演算法,並在電力系統全過程動態模擬軟體中得到了實現。
  2. More thermal power units will be used as peak load regulation units because many hydropower and nuclear power plants have put into production in recent decade, and three gorges hydropower plant is being constructed

    摘要近十年來,新建了很多水力發電廠、核電站,三峽水力發電廠正在建設,將有更多的火力發電機組成為調峰機組。
  3. To major in developing the power plant simulators and thermal energy automation systems for several years, making the selection and comparison with different types of the nuclear power plant designs and equipments, and doing some research in the waste burning technology

    從事電廠模擬機和熱工自動化控制系統的開發工作多年;從事核電設備技術特點的比較與選型工作;從事垃圾發電技術研究。
  4. My major research interests are 1 aquatic pathology, 2 aquatic pathobiology, 3 fungal diseases of fishes, 4 eel diseases, 5 thermal physiology pathology, 6 the causes of the deformed fish in the nuclear power plant ii, 7 fish neoplasia, 8 alzheimer s disease

    研究興趣:水族病理生理學,組織生理學,病理學,養殖生物疾病學,老年失憶癥,核二畸形魚成因,腫瘤學,魚類真菌病學等。
  5. Test investigation on sgtr of single tube break and three - tube break is carried out on hpitf of ciae to deeply understand the thermal - hydraulic behavior during pressurized - water - reactor ( pwr ) sgtr and to provide an integral data base for code assessment and development. the facility, a full height and 1 / 1000 - scale ( by volume ) of qinshan nuclear power plant, incorporates two identical loops with active pumps and steam generators ( sg ). the initial steady state of the test basically simulated that of the reference plant operation

    為了深入了解核電廠蒸汽發生器傳熱管破裂事故發生后的熱工水力現象,以及對壓水堆( pwr )核電廠系統分析程序進行分析和評價,在高壓綜合試驗裝置上開展了蒸汽發生器傳熱管破裂試驗研究高壓綜合試驗裝置以秦山核電廠主迴路系統為模擬對象,該裝置為雙環迴路系統,容積比為1 : 1000 ,高度比為1 : 1 。
分享友人