on-site plant 中文意思是什麼

on-site plant 解釋
陸用裝置
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. On april 2, 2002, hyundai motor announced that it selected a site in alabama for its new assembly plant in the united states

    2002年4月2日, (韓國)現代汽車公司宣布選擇在阿拉巴馬州修建在美國的第一個汽車組裝廠。
  2. Japan ' s third - biggest automaker said in a statement it would build a new factory for solar cells on the site of a car plant in kumamoto prefecture, on the southwestern japanese island of kyushu

    日本第3大汽車製造商本田汽車公司12月19日宣布,將從2007年起開始大規模生產太陽能電池,以滿足各方對清潔能源日益增長的需求。
  3. Some changes are needed in the configuration of the plant to reflect the changes that have occurred on the site, primarily that both the hydrogen recovery plant that was fed with purge gas and supplied instrument air and the site auxiliary boilers that provide low pressure steam have been dismantled

    裝置布局發生了一些變化,主要的兩項就是拆除了氫回收裝置和輔助鍋爐,氫回收裝置消耗吹掃氣和儀表空氣,輔助鍋爐曾經用來提供低壓蒸汽。
  4. In 1970, the first desalination plant was built on castle peak road, near tai lam chung reservoir. this site was chosen because of its close proximity to the zhujiang river estuary, where the seawater was clearer and less salty. additionally, the desalinated water could be channelled directly to the nearby tai lam chung reservoir

    1970年首座海水化淡試驗廠于青山道大欖涌水塘附近興建,化淡廠興建地點,主要考慮到該地位於珠江出口,海水鹽份較低,水質較清,且鄰近大欖涌水塘,海水淡化后可直接輸往水塘等各因素。
  5. The article takes a 600mw natural cycle drum boiler ( soot blow using steam ) as investigating object, establishes soot accumulation loss and soot blowing energy loss models for its water cooling wall, superheater, economizer and air preheater respectively, set up instructions for soot blower operating. simulating calculation results are compared with site data to verify usefulness of key models. the article introduced the operation optimizing design of soot blowers of yanzhou no2 power plant based on theoretical research

    本文以600mw汽包自然循環鍋爐(蒸汽吹灰)為具體分析對象,分別建立其水冷壁、過熱器、省煤器、空預器的積灰損失和各受熱面吹灰能量損失的模型,建立相應的吹灰器運行規則指導,對設計中的關鍵模型問題,通過模擬計算及與現場數據作比較的方法,驗證其可用程度。
  6. 3. the great bustard is big - sized bird that build nest on the ground and the nests distribute in sparse group. most of their nests locate on the middle slope of hillocks, especially on the southern middle slopes towards to the sun, the biggest gradient is not more than 8 ?, the most important 3 factors that determine nest - site selection are height of plant. density and thickness of hay. 4

    大鴇是營地面鬆散型群巢的大型鳥類,多將巢築在海拔190 230m的草原崗坡的坡腰上,且以偏南向的朝陽緩坡的坡腰上為多,最大坡度不超過8 ,植被高度、密度和枯草厚度是決定其巢位選擇的3個最重要的因素。
  7. The purpose of this web site is to share my experiences with workers in any country on water logging in agricultural lands, irrigation induced soil salinity, subsurface drainage for agriculture ( horizontal and vertical ), reuse of groundwater, ground - water hydraulics, ( geo ) hydrology, rainfall and surface runoff relations, reclamation and improvement of water logged saline, salty, sodic alkaline, and acid sulphate soils, plant growth, crop production and responses as well as statistical analysis consisting of segmented linear regression and cumulative frequency distributions

    描述:探討農業耕地的水澇問題;灌溉導致的土壤鹽堿化;地表灌溉;地下水的再利用;地下水水力學;雨水與水流失的關系;淺地表排水;土壤開墾及水澇,酸性,堿性土壤的改良;片段線形回歸和累積頻數分佈的統計分析等。
  8. The lfg collection and utilization is company know how that is demonstrated at a site in meizhou, guangdong province that currently collects 2000 m3 hr of gas and treats all the leachate from the site, 2 mw electrical power plant will be installed on the site to utilize the collected gas soon

    該技術在中國梅州市進行了試點,現回收沼氣能力為2000立方米小時,同時循環處理該填埋場的全部滲濾液,並計劃近期在該填埋場建設裝機容量2兆瓦的發電廠,使用回收的沼氣發電。
  9. Mainly, history cultural history site and scenic sport has : " wangxian slope ", " revolution martyr monument ", " zhenning fort ", " visit fish at longtang ", " yinsheng plant garden " and so on

    主要的文物古跡和景點有: 「望仙坡」 , 「革命烈士紀念碑」 , 「鎮寧炮臺」 , 「龍塘觀魚」 , 「蔭生植物園」等。
  10. It is a huge task to collect all the waste ; they have over ten collection and storage centers located outside of the power plant, as well as enough storage on - site to hold seven days of biomass fuel

    收集生物廢料也是一件巨大的工作;國能單縣有在電廠以外的超過10的存儲中心,同時在電廠里也有一個巨大的能儲存滿足電廠七天發電所需生物肥料的倉庫。
  11. The power plant was decided to be sited at yahekou in 1972. beginning leveling of the site on aug. 10, 1992, taking 9 months to finish an earthwork with volume of 1. 67 million m3

    1鴨河口電廠1972年選址, 1992年8月10日場地破土平整,歷時9個月,挖填土石方267萬立六米。
  12. Based on these, the 200mw turbine unit of panxian thermal power plant is selected, and the key problems are analyzed, such as, selection of cool medium, flow path of medium, thermal stress during fast cooling etc. the cfd software is adopted, and the maximal thermal stress, the optimum cooling model and system, and the autocontrol scheme during fast cooling, are gotten. in the end, the results are applied in the site. the optimum cooling model and system, and the autocontrol scheme would be provided reference as the other similar units

    於此,本文以盤縣發電廠200mw汽輪機為研究對象,對發電廠汽輪機組空氣冷卻裝置及系統現狀深入分析基礎上,應用cfd軟體數值模擬了不同工況時汽輪機缸壁溫度變化情況,對200mw汽輪機快冷過程中控制指標進行分析,優化機組的快速冷卻過程,合理快冷設備、系統,優化控制曲線,分析最大熱應力值及最佳冷卻方式選擇,同時,對現有盤縣發電廠汽輪機組快速冷卻系統進行優化改進,並進行了實驗與實施。
  13. The fabricators all over the country can provide designing and packing services on site. if needed can station in customer ' s plant

    按客戶遍布全國各地的小公司可承接上門設計,捆包服務項目也可進駐需包裝服務的客戶工廠。
  14. Sophisticated technology is employed to minimise the environmental impact of the refuse, with an on - site bio - gas plant incorporating a leachate management system to prevent unacceptable leachate migration off - site into the surrounding environment

    堆填區採用先進的處理廢物技術,利用有機廢物釋出的可燃性氣體推動污水設備,減低不合格污水對附近環境的影響。
  15. It came true to take advantage of transfer standard to compare and analyze the naturalgas standards of measurement on site. the dissertation used the transfer standards to take the site comparative experiments to the sonic nozzle standard measurement of the nation crude oil great flux measure station carried by vehicle and the standard measurement of the general pertrifaction plant. it evaluated and analyzed the measure capability of these two standards, thus to keep them fulfilling the rules of the verification and the regulations of relative criterions

    本文通過使用傳遞標準,對國家原油大流量計量站車裝音速噴嘴標準裝置和大慶石化總廠計量站氣體計量標準裝置進行現場比對試驗,對這兩項天然氣計量傳遞標準裝置的計量性能進行了評價和分析,使國家站和大慶石化的天然氣流量計量標準裝置達到了檢定規程和相關標準的規定要求。
  16. Do the noise levels of all plant and machinery on site comply with prc standards on noise emissions

    所有機械設備的的噪聲尺度是否與中國噪聲散發標準進行了比較?
  17. During the operation stage, the main on - site activities are routine maintenance of the golf course and operation of the desalination plant for irrigation purposes during the dry season

    2 . 3 . 2運作期的主要場內作業為高爾夫球場的常規維修活動和在旱季以灌溉為目的的化淡工序。
  18. On - site treatment of residual unbalance of fan ' s rotator in a pelletizing plant

    一起風機轉子殘余不平衡現場處理實例
  19. The leakage of condensers of 4 generators ( 300mw ) in mawan power plant and its preventive measures were discussed. the practically effective leakage inspection method on - site was introduced as well

    摘要闡述了媽灣電廠4臺300mw機組凝汽器泄漏的常見問題及預防措施,並介紹了現場實際工作中所採用的較為成功和有效的查漏方法。
  20. By the data observed on - site, it indicate that the reinforcing plan which the plant to disembark and the dam to be connected has solved the problem that the plant to disembark occurs resonance vibration with the frequency of the turbogenerator units, but the problem of resonance vibration of the downriver structure of the plant has not been solved, hence the study of the reinforce structure of the downriver plant must be made

    廠房在此長期嚴重的振動下,立柱出現水平周邊裂縫,門窗墻壁也均產生裂縫,威脅到電站的安全運行。現場測試表明上游廠壩間在一定范圍內連接加固,雖然解決了廠房上游一階頻率與轉頻的共振問題,但對下游結構作用不明顯,因此需要對廠房下游結構的加固作進一步的研究。
分享友人