open phase 中文意思是什麼

open phase 解釋
開路相
  • open : adj 1 開著的,開放的;可進入的,可分享的 (to); 無蓋的,敞口的;敞開的;展開的;開的;開闊的,開...
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  1. It was restaurant industry graven topic that that of that of from input / output angle said, how advance restaurant kernel ability to compete, with the purpose of advance business economic benefit, as soon as possible brought return, accelerating demonetization end, abaft experience know clearly near twenty year stodgy state look forward to reform mechanism, our state hotel industry be around by babyhood trend maturity, by seller ' s market trend buyer ' s market, such transit should make part rational consumer enjoy to good value for money, too brought ought to part superficial restaurant taste to inevitable ; the government owned restaurant at multinational restaurant bloc and civilian battalion restaurant enterprise " dual impact down, calendar by know clearly reform of monetary system cum bank commercialization, market open cum solution control, market cum competitive mechanism three phase, owing to planned economy belated issues, structure irrationality wrought a matter of and overlapping investment wrought a matter of wait threefold cause, make government owned restaurant at market competition middle gradualness forfeiture competitive edge, in progression appearance hot water, how advance government owned hotel competitive power a matter of, toward me state tourism possess strong operation significance, hunan lotus hotel namely same family pole tool on government owned three stars level hotel behalf of the for the last years, by way of hotel industry occupy quite specific gravity

    從投入產出的角度講,如何提高飯店核心競爭能力,以達到提高企業經濟效益,盡快產生回報,加速貨幣回籠的目的,是飯店業嚴肅的話題。在經歷了近二十年步履艱難的國企改革歷程后,我國飯店業已開始由幼稚走向成熟,由賣方市場走向買方市場,這種轉變將使得部分理性的消費者享受到物有所值,也使部分膚淺的飯店品嘗到必然的失敗;近十年來,作為飯店業占相當比重的國有飯店在跨國飯店集團和民營飯店企業的雙重沖擊下,歷經了金融體制改革及銀行商業化、市場開放及解控、市場及競爭機制三個階段,由於計劃經濟遺留下來的問題、結構不合理造成的問題和重復投資造成的問題等三方面的原因,使得國有飯店在市場競爭中逐漸喪失競爭優勢,相繼出現困境,如何提高國有飯店競爭力的問題,對於我國旅遊業具有強烈的現實意義,湖南芙蓉賓館就是一家極具代表性的國有三星級飯店。
  2. The transition into the catabolic or open wound phase of burn injury is often not clearly demarcated.

    從燒傷休剋期轉變到分解代謝或開放傷期的界線時常是不清晰的。
  3. On open - phase protection for hv motors in power plants

    發電廠高壓電動機斷相保護的探討
  4. There is great change of negative current component when it happens the line - open fault. it is marked as the occurrence of the fault. and it can be concluded the phase characteristic of negative current in the line. in the transient course, there are plenty of harmonics in the fault line. through the transient analysis, it is drawed that the amplitude of each harmonic in fault phase is greater than other phases. harmonic current in fault line is far greater than other normal lines

    發生斷線故障以後,線路中會出現負序電流的突變,可以作為故障啟動判斷的標志,並且通過分析得出了故障時負序基波電流的相位特點。在故障暫態過程中,故障電流中含有大量豐富的諧波成分,各次諧波在故障期間有突變,並且衰減很快。
  5. This paper starts the research of the liquid floated pendulous accelerometer testing system according to the engineering. at first, this paper gives the brief introduction of the history and present status of accelerometer and its testing technology, the working principium and math model of the liquid floated pendu - lous accelerometer, and then, decides the binary width pulse force retrim loop as the design proposal of testing system, researches the transfer function of every part in the system emphasizly, analyses the stability of the whole accelerometer testing system from the angle of control theoretics by the open loop transfer function of system, and designed the correcting net, analyses the basal problems such as resolution, sampling restraint, precision and so on, designs the hardware testing circuits such as preamplification, band - pass filter, alternating amplifier, phase sensitive demodulatorn, pulse - width modulation, frequency scale circuit, moment current generator. finally, using the graphics program language labv - iew which is designed for testing field especially by ni accomplishes the solfware design of testing system, realized the testing functions

    首先對加速度計及其測試技術的發展歷史和現狀,液浮擺式加速度計的工作原理和數學模型等作了簡要的介紹,然後確定了以二元調寬脈沖再平衡測試迴路為設計方案,並從控制理論的角度進行了分析,著重研究了系統中各部分的傳遞函數,利用系統開環傳遞函數分析了系統的穩定性,同時設計了系統的校正網路;分析了二元調寬脈沖再平衡測試迴路的解析度、采樣約束以及測試精度等基本問題,並按照系統分析的結果設計了包括前置放大、帶通濾波、交流放大、相敏解調、脈寬調制、頻標電路以及力矩電流發生器等測試系統各部分硬體電路,驗證了電路的正確性,最後按照測試系統的要求,採用了美國ni公司專為測試領域所開發的虛擬儀器工具? ? labview作為測試軟體開發工具,利用該圖形化編程語言完成了測試系統軟體部分的設計,實現了測試功能。
  6. District open space in area 35, tsuen wan - phase 2

    荃灣第35區的地區休憩用地第2期
  7. The study has completed the design of two - phase inverter and made up of the two - phase inverter - motor system for experimental use it is a variable frequency adjustable speed system with a open - loop control of rotational speed, which consists of voltage - controlled oscillator circulating assign device inverter circuit and two - phase induction motor a accurate mathematical model is set based on the whole system, and simulator program of dynamic and steady condition is established, which is used to calculate the dynamic and steady performance by kron and symmetrical coordinate converter by simulator calculation and experimental research with specific parameter of the system, a comparison is made between predicted and experimental characteristics, experimental measurements are shown to compare closely with corresponding theoretical result it is compared with some variable frequency adjus table speed system comprising inverter and single - phase induction motor from the system efficiency torque pulsation and the effect of two - phase inverter capacitance based on the conclusion, harmonic cancellation pulse width modulation control of a two - phase inverter - fed induction - motor drive system is researched, which cancelled the low harmonic and improve the system performance

    通過對電機的kron變換和對稱分量變換,建立了系統較精確的數學模型,編制了系統動態及穩態運行的模擬計算程序分別計算系統的動態和穩態性能。通過對系統的具體參數進行了模擬運算和實驗研究,實驗和模擬結果進行比較,說明實驗和理論較為一致,並從系統效率、轉矩脈動及兩相逆變器電容的影響等方面與各種逆變器和單相異步電動機組成的變頻調速系統加以比較。在此基礎上,對兩相逆變器供電-異步電動機系統使用諧波抑制pwm控制進行了研究,由於減少了低次諧波,改善了系統性能。
  8. Phase 1 development comprising an exhibition pavilion and landscaped area has been open to the public since december 2000

    第一期設施包括展覽館及園景地帶,由二零零零年十二月起開放給市民參觀。
  9. Study on protection technology of overload and open - phase of minitype flameproof motor

    小型隔爆電動機過載斷相保護技術的研究
  10. The protector of electromotor have used heat relay for a long time, but heat relay not only has a dead area in the light over - loading area, but also ca n ' t protect open phase under so much circumstances

    電動機保護裝置採用熱繼電器已有很長的歷史,但熱繼電器在電機的輕過載區存在著「保護死區」 ,而且對斷相保護在許多情況下起不到保護作用。
  11. The device has realized the real - time control and protection for short circuit, failure to start, unbalance ( open phase ), under - voltage, earth faults, and overload

    保護與控制裝置實現了對短路、起動故障、不平衡(斷相) 、欠壓、接地故障、過負荷的實時監控和保護。
  12. Nonextractable phase open tubular column npot

    不可提取相開管柱
  13. Immobilized phase open tubular column ipot

    固定化相開管柱
  14. In the models, the time dependent parabolic equations, deduced from the mild slope equations with currents or not, are used as the governing equations. based on the general conditions for open and fixed natural boundaries with an arbitrary reflection coefficient and phase shift, the boundary conditions for the present models are treated. the alternative direction implicit method is used to solve the governing equations and the numerical schemes are unconditional stable

    在建立模型時,將原始的橢圓型緩坡方程的近似型式? ?依賴時間變化的拋物型方程,作為控制方程;從將開邊界條件、不同反射特性的固壁邊界條件相統一的表達式出發,對邊界條件進行處理;用adi法數值求解控制方程,格式無條件穩定;節省了計算機內存和計算量。
  15. Palo alto villas, kunshan the first phase of the palo alto villas project will be developed with 75 percent of the land set aside for residential homes and the remaining 25 percent set aside for public open space and a few commercial buildings. the major roads of the first phase of the project have already been completed

    本公司即將在崑山石牌鎮進行房地產開發項目,規劃為自石牌鎮過橋向東沿中華路南面30米內一狹長地段,總長820米,以及向東至興華路,北起中華路,南至蘇杭路共747畝的地塊。
  16. The development process for police colleges " cultivation purpose had two phases : phase one was the roughly establised stage for cultivalion purposes from reform and open policy to the middle of eighties of the 20th century. phase two is the exploration and debate stage from the middle of eighties until now

    我國公安院校培養目標的發展歷史可分為兩個階段,即十一屆三中全會以來至80年代中期是公安院校培養目標初步確立階段, 80年代中期至今是公安院校培養目標體系探討與爭鳴階段。
  17. The housing department has taken actions to address issues relating to development intensities both within the public housing sites and in the larger community. we have explored opportunities for rezoning public housing redevelopment sites within congested districts for non - residential uses. for example, the site at lam tin estate phase 9 will be used for the development of a family leisure centre, and the sites at lam tin estate phase 10 and sau mau ping estate phase 12 will be used as open spaces

    23 .為了改善人口稠密地區公共房屋及社區的發展密度問題,房屋委員會在重建舊屋時已將合適的地盤由住宅用地更改作非住宅用途,例如,藍田重建第九期將會發展為家庭康樂中心,而藍田重建第十期及秀茂坪重建第十二期將會作休憩用地。
  18. In chapter 2, we analyzed the effect of the driving field phase fluctuation on the gain and dispersion and population differences in an open v - type three - level non - inversion lasing system and then discussed the effects of the incoherent pumping rate, the ratio of the atomic injection rates, the atomic exit rate, the rabi frequency of the probe and driving fields and their corresponding detuning on the gain, dispersion and population differences of the system, and got some important conclusions different from those in closed or other open systems

    第二章討論了驅動場的相位漲落對開放的v型三能級無反轉激光系統的影響,根據解析解的數值計算結果討論了非相干泵浦速率、粒子注入速率之比、粒子退出速率、探測場和驅動場的rabi頻率和相應失諧對系統增益、色散和粒子數差的影響,得到了一些不同於封閉的v型系統及其他開放的無反轉激光系統的重要結論。
  19. The project is open to the environment until the closure phase

    項目是對環境開放的,直到項目結束階段。
  20. In light of the system fault happened in shaoguan power plant, the electromagnetic process during the open - phase running of gate - out switch of generator - transformer unit is analyzed in detail with the measures to handle the failure included

    結合韶關發電廠曾發生的系統故障,詳細分析了發變組出口開關非全相運行時的電磁過程,提出了限制故障擴大的處理方法和故障發生時的安全處理措施。
分享友人