out-of-specification results 中文意思是什麼

out-of-specification results 解釋
檢驗不合格結果
  • out : adv 1 〈位置及運動的方向〉向外,向外部;在外,在外部;出去,出外,離開;離岸,向海面;(船等)開...
  • of : OF =Old French 古法語。
  • specification : n. 1. 詳細說明,逐一登記,詳記。2. 〈pl. 〉規范,規格。3. 清單,明細單。4. 【法律】(申報新發明時的)設計說明書。5. 【法律】用來料加工製成新產品所取得的權利。
  • results : 調查結果
  1. For confirming the results, a full - size model ( dj / dj = 0. 6, t / t = 1. 5 ) was analyzed by means of strain gauge test. the reliability of finite element analysis was proved because the results basically accorded with that of the test. secondly, in this paper, in order to carry out a fair assessment of the reinforcement design on spherical shell with transnormal nozzle, a comparison of reinforcement method was done between jb4732 - 1995 steel pressure vessels ? esign by analysis appendix a4 and hg20582 - 1998 specification for stress calculation of steel chemical vessels

    為了驗證ansys分析結果的可靠性,對其中一組參數下(開孔率0 . 6 、厚度比1 . 5 )的模型容器,採用電測法進行了應力測試,並將得到的實驗結果與有限元結果進行了比較,二者在應力分佈狀況和大小上均基本吻合,證明此種結構運用ansys進行分析,其結果是完全可靠的。
  2. The author redesigned the common concrete beams and carried out a comparative analysis to the existing beams according to the specification for design of reinforced concrete and prestressed concrete highway bridges and culverts ( jtj023 - 85 ), the specification for design of reinforced concrete and prestressed concrete highway bridges and culverts ( informal version for advices ) and relevant rules of its matching stipulations, light aggregate concrete bridge technology stipulations ( ( informal version for advices ) and on the basis of prestressed concrete theory. the thesis emphasized on the research of the variation of the concrete, prestressing tendon quantities, their spans, beams " height and their rigidity of both the designed beams and the existing beams, and obtained the quantitative results from above research

    採用hslc置換梁體中的普通混凝土,並運用預應力混凝土理論,依據《公路鋼筋混凝土及預應力混凝土橋涵設計規范》 ( jtj023 - 85 ) , 《公路鋼筋混凝土及預應力混凝土橋涵設計規范》 (徵求意見稿)和與之配套編制的《輕骨料混凝土橋梁技術規程》 (徵求意見稿)的有關規定,對上述普通混凝土梁進行了重新設計並與既有梁進行了對比分析,得出了設計梁與既有梁在混凝土及預應力筋用量、跨度、梁高以及剛度等方面的變化情況,得到了定量結果。
  3. Test engineer is responsible for scheduling and conducting tests according to global test specification, analizing testing results and releasing test reports ; is responsible for maintenance of testing facilities and implementing 5s in test lab, troubleshooting of test stands ; is also responsible for designing testing jig to carry out the special test which can not be done on standard test stands

    試驗工程師負責按照全球試驗規范,根據本地和全球的試驗要求,計劃和執行各種試驗,分析試驗結果並撰寫試驗報告;負責制訂試驗設備的維護保養計劃和負責試驗室的5s管理,解決試驗臺故障;負責設計試驗裝置來完成標準試驗臺無法完成的特別試驗。
  4. Present the experimental research carried out on strain and stress by applying the resistance strain surveying technique to the big hole sealed heads in the new fire - tube heating boilers with the laws of strain and stress distribution obtained and allowable working pressure given because there is no applicable standards or specification for calculating the strength of crude oil heating boiler heads perforated by densely distributed big - holes, which, to a certain extent, hampered the further development of crude oil heating boilers in china, and concludes from experimental results that strain and the stress of circumference are fairly large near the edge of big - hole, and the cross ribs enhance strength of sealed head to a certain degree

    油田火筒加熱爐密集大開孔封頭的設計計算,因沒有相應的強度計算標準在一定程度上限制了我國油田火筒加熱爐技術的發展.採用電阻應變測量技術,對新型火筒加熱爐大開孔封頭進行了應力應變試驗研究,得到了封頭的應變和應力分佈規律,給出了大開孔封頭允許的工作壓力.試驗結果表明,大孔邊緣圓周處應力應變較大,十字筋板對封頭有一定加強作用
  5. All out - of - specification results must be investigated by a defined procedure that complies with global quality standards

    所有超標結果必須按照一個明確規定的符合全球質量標準的規程進行調查。
  6. The senior site quality manager ( io ) or quality assurance ( di & a ) is responsible for ensuring that there is a procedure for handling out - of - specification results from laboratory tests that complies with the global quality standards

    高級質量管理人員或質量部門應保證具有一個處理實驗室試驗結果超標的,符合全球質量標準的規程。
  7. Under such background, the author does much investigation of college students " dormitories of xi ' an area first, the thesis focuses on the construction actualities of college students " dormitories and does many investigations and data collection. then, analys the investigation results by comparing the current edition of < the dormitory buildings design specification ^ and draw a conclusion that many clauses of the specification are out of date

    論文首先從西安地區高校學生宿舍的建設現狀調查入手,對學生宿舍建築進行了大量的實地調查和資料收集,繼而對照現行《宿舍建築設計規范》 ,對調查資料進行統計分析,得出《規范》的許多條款已經落後于實際建設的結論。
分享友人