  1. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  2. The goal is to control the water outlet temperature by manipulating the flow rate of the steam and control the water inlet rate by manipulating the height of the water level in the water tank

    本文中,換熱器的控制任務主要有兩個,首先通過控制水箱進口水閥門開度,進而控制水箱水位,進而控制換熱器進口水流量。
  3. Cdq series coal gas producer outlet spawning, lined set help water, stove inner every arrangement of ideas saturated temperature, upper material, get rid of grey system equal device voluntarily move round process middle, hooverize clouded or frosted imitation glass, safe reliable, operation convenient

    Cdq系列煤氣發生爐出口放散夾套補水爐內各層次飽和溫度上料除灰系統均可裝置自動運轉過程中,可節約燒料,安全可靠,操作方便。
  4. Besides the basic requirements of a usual home heater like safety and auto - control on water temperature in tank, the new one was supposed to have more functions, the most important ones of which are temperature control on outlet and remote - switch on / off the machine

    本項目除了通常對電熱水器的安全性和水膽溫度的自動控制等要求外,還希望所設計的控制器具有恆溫出水控制、遠程開關控制等功能。
  5. When temperature changed, in order to keep the outlet temperature of the cooling water stable, we can change the areas of draught deflectors, so the speed and area of the draught is changed, which will improve the safety and economy of the running assembling sets with the assumption of economizing water in winter

    當外界溫度發生變化時,為保證出塔水溫不發生變化,可通過改變擋風板面積的方法,使進風口面積及進塔風速發生改變,進而保證出塔水溫,保證冷卻塔在冬季的正常運行。
  6. This program can work out some changes made by the operation of wet compression, such as the maximal mass of water spray, the temperature in the outlet of supercharger, and the consumed energy by the supercharger. in addition, this thesis gives the definition of efficiency of wet compression when the entropy of compressed air keeps constant, and it can be the standard for the study of wet compression

    本文首先對增壓柴油機濕壓縮研究的主要部分? ?壓氣機,建立濕壓縮的數學模型,從理論上分析濕壓縮的最大噴水量,壓氣機出口溫度,壓氣機耗功等變化情況,並給出了等熵濕壓縮的定義,為濕壓縮研究建立了比較標準。
  7. Through developing a 2 - dimensions heat transfer model of buried pipe - in - pipe heat exchanger and simulating the process by computer, the author figures out inter - relations of factors which influence characteristics of buried pipe - in - pipe heat exchanger, such as pipe diameter, pipe length, ratio of pipe diameters, flow rate, inlet water temperature, patterns of water inlet and outlet, and material features made of pipe, and proposes some optimizing indexes of buried pipe - in - pipe heat exchanger. the author studies the " heat - - short circuit " phenomenon as well and gives < wp = 5 > some important results

    本文通過建立地下套管式埋管換熱器傳熱過程的二維傳熱模型,並藉助計算機對分析結果進行解析,弄清了影響埋管換熱器性能的管徑、管長、管徑比、通過流量、進水溫度、進出水方式以及管材等參數的作用,並提出了相應的優化指標,對研究界懸而未決的「熱短路」問題也進行了細致分析,得出了有關結論。
  8. There are several important issues to that attention should be paid in the design of test bed, such as the measurement of the temperature difference between the inlet and outlet of test section and the temperature of cooling water in the inlet and outlet of condensing tubes, filled volume of the steam boiler and its level control, the determination of the natural acting head of high temperature tank and design of the cooling water flow of measuring tank

    試驗臺由高溫工質自然循環子系統、冷卻水機械循環子系統和計算機監測控制子系統構成,試驗段進出口溫差及冷凝管進出口溫度的測試、蒸汽鍋爐充注量及液位控制、高溫水箱自然作用水頭的設計、冷卻水流量計量水箱的設計等是試驗臺設計中值得重視的問題。
  9. After the optimizing system is put into operation, online calculating results and operation effect is analyzed, pointing out that the base for the whole boiler soot blow optimization is the minimum loss of soot accumulation and energy consumption of soot blowing, the base for water cooling wall soot blow optimization is the combustion house outlet gas temperature difference, the base for a single heat exchange surface soot blow optimization is the degree of its soot accumulation

    並對優化系統在線運行后,取得的實時計算結果和實際效果進行了分析,著重指出積灰和吹灰的經濟性最佳可作為整個鍋爐吹灰優化的決策依據,爐膛出口煙溫差可以作為爐膛吹灰優化決策的依據,受熱麵灰污程度可以作為單個對流受熱面吹灰優化決策的依據。
  10. Standing clear of the outlet ( discharged water may be hot ), slowly lift and release the lever handle on the temperature and pressure relief valve to allow the valve to operate freely and return to its closed position

    經常清洗出口(排泄水可能是熱的) ,慢慢提起並釋放降溫減壓安全閥上的杠桿手柄,使得閥門能夠靈活工作並恢復到關閉位置。
  11. The water temperature at the reactor pressure vessel outlet is about 330 degree c whereas the water temperature at the inlet of the vessel is about 290 degree c. the cooling water is in a sub - cooled condition at such high temperature and pressure to prevent it from boiling

    反應堆出水的溫度約為攝氏330度,而入水口的溫度約攝氏290度。在這高溫及高壓狀態下的冷卻水會處于欠熱狀態即冷卻水的溫度與其沸點有一段距離,因此不會沸騰。
  12. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  13. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the post - cooling water, the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper

    本文通過對原材料及配合比、混凝土出機口溫度控制、運輸過程溫度控制、澆築過程的溫度控制以及混凝土澆筑後的養護和冷卻通水等一系列研究,提出景洪電站高氣溫條件下大壩碾壓混凝土連續施工的綜合措施,並在計算和已有經驗的基礎上給出具體實施方法。
  14. Temperature process lines with tidal cycles of multi engineering conditions of characteristic sections are obtained, the relationship between temperature distribution and velocity field is established, the inner mechanism change of temperature process lines is investigated, the interrelation between water intake and outlet is analyzed, the relation between the ratio of dimensionless temperature rise span of the plant intake and the ratio of river discharge volume and plant cooling water intake volume is obtained

    得到了特徵斷面多種工況隨潮周期變化的溫度過程線,建立了溫度場與流速場的相關關系,研究了溫度過程線的變化機理,分析了取排水口對溫度場的相互影響關系,探討了無量綱溫升時長比與無量綱來取流量比的相關關系。
  15. Through static emulating calculation of the high - pressure heater, the influence of high - pressure heater leakage upon its operation paeameters, such as outlet temperature of the feed - water, pressure loss of the steam extraction pipeline, and temperature of the drain, has been analysed

    摘要通過對高壓加熱器的靜態模擬計算,分析了高壓加熱器?漏對其運行參數,如給水出口溫度、抽汽管道壓損、疏水溫度的影響。
  16. After the modification, the characteristic of outlet water of the spray nozzle is changed and the outlet temperature of the cooling water from the spray nozzle is decreased. as a result, the coal consumption is reduced and the efficiency of the steam turbine is better

    通過對噴濺裝置的改造,改變了噴頭的出水特性,從而降低了冷卻水出水溫度,提高了汽輪機真空和汽輪機熱效率,降低了煤耗,提高了機組運行的經濟性。
  17. The rotation of the motor is controlled according to the temperature of the outlet, the changing of motor ' s rotation changes the proportion of cold to hot water to adjust the temperature to the preset value

    恆溫出水功能通過控制一個直流電機的正、反轉來調節冷、熱水的混水比例,從而達到出水溫度控制的目的。
  18. 4 ) three - dimensional nonlinear analysis of the bottom outlet of the xiao wan arch dam is presented using sub - model techniques. the structural characteristics and failure mechanism of the bottom outlet, under loading of concrete deadweight, hydraulic pressure, internal water pressure and temperature are studied. it is shown that the meshing of the structure becomes easy and the computing time is reduced by using sub - modeling method

    4 )對小灣拱壩的1 ~ #底孔進行了三維非線性分析,研究了孔口在壩體自重、庫水壓力、孔內水壓力和庫水溫度影響等作用下的孔口應力分佈、混凝土開裂、裂縫發展規律以及配筋對孔口開裂和裂縫擴展的影響。
  19. In the water inlet rate control, a pid - fuzzy two - mode controller is used. in the outlet temperature control, this paper proposes to use takagi - sigeno type fuzzy system to construct controller for plants with time delay