overflow section 中文意思是什麼

overflow section 解釋
溢流段
  • overflow : vt ( flowed flown; flowing) 使溢出,使泛濫,使漲滿;淹沒;人滿得走不進(房間等)。 The river ov...
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley.

    方案表明,在寬闊而平坦的河谷內,一種在中間段設置混凝土重試溢洪道的土壩是最經濟的。
  3. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  4. 5. based on longtan project, temperature control and crack prevention of a typical overflow section block of the high rcc gravity dam is studied as a case study

    以「十?五」國家電力公司科技攻關項目為背景,深入系統地進行了龍灘高碾壓混凝土重力壩典型溢流壩段的溫控防裂研究。
分享友人