passing tunnel 中文意思是什麼

passing tunnel 解釋
通過隧道
  • passing : adj 1 通行的,通過的;越過的;經過的;過往的;供通行的。2 正在發生的;目前的,現在的。3 一時的,...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. Construction scheme of tunnel passing through landslide area and fault zone

    穿越坍方區及斷層帶的隧洞檢修洞施工方案
  2. An experimental unit for measuring the instantaneous speed of a high - speed train passing through tunnel

    高速列車進出隧道瞬時速度測量實驗裝置
  3. The result shows that the train passing capacity is closely linked with the train meeting place relative to the tunnel and that the train passing capacity decreases as the tunnel lengths and slops increase

    對計算結果的分析表明,隧道的列車通過能力與列車的交會地點息息相關,而且隨著隧道長度和坡度的增大逐漸變小。
  4. By analyzing the relation between the train passing capacity and tunnel length as well as tunnel slopes the upper and lower limits for installing mechanical ventilation in railway double track tunnel have been determined, which provides science foundations for the formulation the ventilation design norm for railway double track tunnels in operation

    通過對列車通過能力與隧道長度和坡度關系的進一步研究,得出了內燃牽引雙線鐵路隧道設置機械通風的上、下界限,為雙線鐵路隧道運營通風設計規范的制訂提供了科學依據。
  5. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  6. Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  7. Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    文摘:通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  8. Analysis of the pressure wave variation generated by a high - speed train passing through a tunnel

    高速列車通過隧道時壓力波動過程的模型試驗
  9. Way of large pipeline tunnel passing through river and its construction

    大型管道穿越大江大河方式和施工方法的探討
  10. Experimental study on phenomenon of high - speed railway train passing through tunnel with trumpet - shaped entrance

    高速列車通過喇叭形入口隧道的試驗研究
  11. Numerical calculations are performed by the standard k - model and dynamic mesh capability on vehicles being in crosswinds, running in tunnel, passing by and overtaking each other. their aerodynamic characteristics are analyzed and some different turbulence properties are obtained

    本文對fluent進行二次開發,採用動網格技術及標準k -兩方程湍流模型對類車體在側風情況、穿越隧道及超車、交會過程進行三維非定常數值模擬,獲得了規律性的認識。
  12. After hisher graduation, the scholar is expected to offer hisher services to the company as a first choice of preference for a period of not less than three years, subject to the availability of a suitable vacancy and hisher passing of the usual recruitment scrutiny by the western harbour tunnel company limited

    得獎同學于畢業后須以服務西隧公司為首選,任職年期不少於三年,但一切視乎當時職位空缺的情況及是否能通過正常招聘考核為準。
  13. After his her graduation, the scholar is expected to offer his her services to the company as a first choice of preference for a period of not less than three years, subject to the availability of a suitable vacancy and his her passing of the usual recruitment scrutiny by the western harbour tunnel company limited

    得獎同學于畢業后須以服務西隧公司為首選,任職年期不少於三年,但一切視乎當時職位空缺的情況及是否能通過正常招聘考核為準。
  14. A new type of model experimental system of aerodynamics effects caused by high - speed trains passing through tunnel

    新型高速列車隧道空氣動力學模型實驗系統
  15. You are, in a sense, passing through a tunnel

    你,實際上,正在穿過一個隧道。
分享友人