piled wharf 中文意思是什麼

piled wharf 解釋
樁基碼頭
  • piled : 有細毛的
  • wharf : n. (pl. wharves, wharfs) 碼頭。 a wharf rat 〈美俚〉碼頭賊。vt. 把(船)靠碼頭;把(貨)卸上碼頭。
  1. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型試驗在大連理工大學海岸和近海工程國家重點實驗室的大波流水槽中進行,試驗中選用的隨機波靶譜為改進的jonswap譜,入射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜水面的距離s與入射波波高h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜水面以下。
  2. Based on many years ' observation, this paper expounds the formation causes of cracks in piled wharf surface and preventive measures

    摘要通過多年的現場觀察,闡述高樁碼頭面層龜裂產生的原因及防治措施。
  3. This paper compares the spatial calculation of piled wharf with simplified plane bent structures ' calculation through selected models, and analyzes the effect on the simplified transverse beam at different location of the crane, so as to obtain the distribution rule and empiric coefficient of crane load

    摘要通過所選模型進行高樁碼頭結構空間計算與簡化的平面排架計算對比,分析門機不同位置時傳遞到所簡化橫梁的作用效應,從而得出門機荷載的傳遞分配規律及傳遞的經驗系數。
  4. So, the existed high - piled slab & beam wharf shall he demolished

    為此,需將舊的高樁梁板碼頭拆除。
  5. It was shown that renovation of sheet - piled wharf with barrier pile project were reasonable and feasible

    改造前後試驗結果的對比分析表明:遮簾樁方案用於改造板樁碼頭是合理的、可行的。
  6. The working state and deformation property of the structure of sheet - piled wharf renovated by the barrier pile project at berths 14, 15 of jingtang harbor were studied with centrifuge model tests

    摘要結合京唐港(上標# ) 14 、 (上標# ) 15泊位板樁碼頭升級改造工程,運用離心模型試驗技術對採用遮簾樁方案進行改造的碼頭結構受力狀態和變形特點展開研究。
  7. Project of three dimension intuitionistic and corporeal design is bringed forward about structure of the long piled wharf in a question for discussion. it have some applied value that evaluating engineering and structure about the high - pile wharf

    課題成果為碼頭結構設計提供一種直觀、有形的三維設計解決方案,對高樁碼頭設計的工程和結構評價等具有一定的應用價值。
  8. This paper describes the design and construction of the demolishing scheme of the high - piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast

    介紹高樁梁板碼頭拆除方案的設計及施工,重點分析巖質海岸地質條件下預制樁的拆除方案。
  9. Based on the unproved vof method, parametric studies have been carried out for random wave slamming on open piled wharf by numerical simulation. the governing equations are reynolds time - averaged equations and two equations k - model

    為能反映出波浪沖擊過程的湍流特徵,以湍流運動方程? ?雷諾方程,及修正的?模型封閉雷諾方程為控制方程。
  10. In recent years, evident deformation of shore slope for piled wharf occurred at many corners of piers in tianjin port, resulting in relative displacement and deformation of inshore structures, which grievously affects the safety of wharf structures

    摘要近幾年天津港多個突堤轉角處的高樁碼頭岸坡變形比較明顯,導致碼頭後方承臺結構構件出現明顯的相對錯位、變形等破損情況,嚴重影響了碼頭結構物安全。
  11. The integrated application of strengthening and anti - corrosive construction technologies for reinforced concrete during maintenance of piled beam - slab wharf is introduced in combination with the engineering practice

    摘要通過工程實踐介紹了高樁梁板式碼頭維修中鋼筋混凝土加固和防腐施工工藝的綜合應用。
  12. The numerical computation results of wave pressure on open - piled wharf deck for different parametric cases are verified by the experimental results. great progress is made on the numerical model for the study of wave slamming problem

    文中對不同情形的波浪沖擊問題進行了數值計算,並用物理模型試驗結果對數值模型進行了驗證,在建立波浪沖擊問題的數值模型方面取得了重要的進展。
分享友人