piling noise 中文意思是什麼

piling noise 解釋
打樁噪音
  • piling : n. 1. 打樁,打樁工程。2. 樁,樁基;樁材。
  • noise : n 1 聲音,聲響。2 叫喊;嘈雜聲,噪音;喧鬧聲;吵鬧,騷動,騷擾。3 〈古語〉謠言,風聲。4 〈美國〉...
  1. Technical memorandum on noise from percussive piling

    管制撞擊式打樁工程噪音技術備忘錄
  2. Technical memorandum on noise from percussive piling,

    管制撞擊式打樁工程噪音技術備忘錄
  3. Construction noise permits for the carrying out of percussive piling

    進行撞擊式打樁工程的建築噪音許可證
  4. Noise and vibration control on construction and open sites - code of practice for noise and vibration control applicable to piling operations

    建築工地和露天場地噪聲控制.第4部分:打樁作業噪聲和振動控制慣例
  5. Dolphins, which use sonar for navigation, would be impacted by the loud noise associated with piling. potential disturbance of the seabed which may contain contaminated mud could impair the immune system of the dolphins, increasing their susceptibility to disease

    打樁工程所發出的噪音嚴重影響以聲納導航的海豚,而污染泥土亦可能破壞海豚的免疫系統,增加它們受感染的機會。
  6. As the result of the development of technology of integration of mechanics, electron and hydraulic pressure, hydraulic pile hammer has been researched and manufactured since 1970 ' s because it could save energy sources and benefit environment. compared to such conventional hammer as falling hammer and pile hammer using diesel oil, it owned some advantage like high transmission efficiency, low noise, high piling energy and easy controling

    液壓打樁錘從20世紀70年代中期開始研製,是世界各國對節能和環保問題重視以及機電液一體化技術發展的結果,與目前較常用的落錘、柴油錘相比,它具有能量傳遞效率高、噪音低、打擊能量高且易於控制等優點。
  7. Technical memorandum on noise from construction work other than percussive piling

    管制建築工程噪音撞擊式打樁除外技術備忘錄
  8. The conditions of a construction noise permit for the carrying out of percussive piling are subject to appeal

    如對用以進行撞擊式打樁工程的建築噪音許可證的條件不滿,可提出上訴。按
  9. A valid construction noise permit issued by the environmental protection department is required for the carrying out of percussive piling during the permitted hours

    如須于核準時間內進行撞擊式打樁工程,必須事先取得由環保署簽發的建築噪音許可證。
  10. Depending on the nature of the noise sensitive receivers, the construction noise permit may allow carrying out percussive piling of a total duration of 3, 5 or 12 hours during the permitted hours

    建築噪音許可證通常批準3 5或12小時的核準時間,視乎噪音感應強地方的情況而定。
  11. In considering applications for carrying out general construction work and percussive piling the authority will assess the impact of the noise generated by the equipment at any noise sensitive receiver such as domestic premises in the vicinity in accordance with the assessment procedures contained in the following technical memoranda

    監督在考慮一般建築工程及撞擊式打樁工程的申請時,將會依據下列技術備忘錄內載的評估程序,評估有關設備對噪音感應強地方例如住用處所所造成的影響:
分享友人