pipe way 中文意思是什麼

pipe way 解釋
管子隔間
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • way : n 1 路,道路,通路。2 路程;距離。3 (要走的)路線;途中,路上;進行,前進;【法律】通行權。4 方...
  1. When the dinner bell rang he listened for count muffat, who was on his way to the dining room, and ten minutes later, when he was certain that no one would see him, he slipped from the window to the ground with the assistance of a rain pipe

    晚飯鐘聲敲響時,他窺伺著向飯廳走去的繆法。十分鐘后,他覺得肯定不會被人看見了,就敏捷地爬上窗戶,抓住一條下水管溜到室外他的臥室在二樓,窗戶朝向房子的背面。
  2. There are 500 ton and 315 ton oil pressure, and 176 sets of kinds of machine process and checking equipments in the factory. the mould we designed are economical applied and low making charge short period. we produce back - door level air - spring, jack, brake oil pipe, accelerator pedal for micro car and engine mid - parts, gemel, tri - way air pipe, adiabatic board and other welding parts

    工廠主要生產微型汽車系列背門撐桿制動油管千斤頂等總成,以及發動機倉中置構件側圍頂上內蒙皮等沖焊件,已形成年產30萬車付的能力,其中背門支撐桿制動油管供應量佔了長安公司一半以上。
  3. The result shows that the simply math - model which is pipe add turbine for this kind of system is unsuitable. the only way is that when calculating the transient of the all hinge of this system, the effect of the ground swell must be taken into account, the result shows that the ground swell will be effect the buildings around the river, the ship which run on the river and the transient of this hinge system

    計算結果表明,對此類樞紐系統進行過渡過程模擬計算時,不能簡化為管道加機組的簡單系統進行模擬計算,而必須進行計及涌浪的全樞紐過渡過程模擬計算,才能從模擬結果中反應實際存在的涌浪對周圍建築物、行船以及樞紐系統的過渡過程的影響。
  4. Communication is the key problem in distributed systems, in didsa, pipe is chosen as the intra - agents communication way and socket as niter - agents communication way

    通信是任何分散式系統都需要著重考慮的問題。 didsa系統選定管道( pipe )來作為agent內部通信方式, socket來作為agent間通信方式。
  5. From the studies of the methods of photoemission, capacitance and ultrasonic to detect the air in the transfusion pipe, the best way to detect the air is the use of ultrasonic

    通過比較光電式、電容式和超聲波式三種對輸液過程中空氣的檢測方法,可知超聲波檢測法為輸液管內空氣檢測的理想方法。
  6. 3. a number of test parameters of insulation, position of reflux pipe inlet arrangemts, injection etc. are explored in the experiment. the experimental results demonstrate that the natural circulation is an efficient way to precool the pump system and maintain it at cryogenic temperatures

    進行了多組對比實驗,著重對兩種不同迴流方式對于自然循環和預冷的影響進行了比較,並研究了系統增壓、引射、迴流管絕熱效果以及泵體絕熱效果對于自然循環的建立和維持以及對循環預冷效果的影響。
  7. The plastic dual - pipe extrusion machine set traditionally called as pipe drawing machine offers high efficient, reliable way to produce hard pipes, which, incorporating the dual - pipe extrusion design, is composed of single - screw or tapered twin - screw extruder, vacuum molding system, dual - hauling mechanism, and synchronal cutter

    本塑料管材雙管擠出機組俗稱拉管機屬于高效生產高品質硬管材的專用設備。由單螺桿或錐形雙螺桿擠出機,真空定徑系統,雙牽引和同步切割機構組合而成,融進了先進的雙管擠壓新理念。
  8. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  9. Water and fuel oil, pumped here and there through pipe mazes, made the long tube tilt one way or another.

    通過密如蛛網的管道,這兒用水泵抽水,那兒用油泵抽柴油,弄得長長的艇身東倒西歪。
  10. Thus, with beer - drinking, pipe - smoking, song - roaring, and infinite caricaturing of woe, the disorderly procession went its way, recruiting at every step, and all the shops shutting up before it

    這個烏煙瘴氣的行列就像這樣行進著,有人喝啤酒,有人抽煙斗,有人哇哇地唱,還有人沒完沒了地裝出椎心泣血的樣子。
  11. Three precautionary measures to prevent natural gas hydrates in pipe from blocking are put forward, that is, not to used bending pipe if possible during construction stage ; increasing pigging frequency before pipeline commissioning to elimninate water within pipe ; injecting inhibitor in regular way

    提出了三項預防水化物的措施:施工階段避免過多使用彎管;投產前增加吹掃次數,徹底清除水;運行初期定期注入抑制劑。
  12. By this way, however, the working pressure of the fire water system will be at higher level in case of the central stabilizing high pressure system and undesirable consequences related to the pressure - acceptance of the pipe and the joints shall come forth

    而在集中穩高壓給水系統中,這樣確定的穩壓泵揚程及設定壓力值,往往使消防給水管網始終處于較高壓力工況,因而使管網內水壓與管道及其介面的承壓能力這一對矛盾趨于突出。
  13. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  14. In this way it can prevent from the phenomenon of filler block caused by scrap iron and its life is prolonged. all parts that will contact ethanol in the device such as condensor. buffer tank, cooling snake pipe are made of stainless steel in order to guaran - tee that the finished product, ethanol, is not polluted

    蒸餾塔體採用不銹鋼製作,從而防止了鐵屑堵塞填料的現象,延長了裝置的使用期限。本裝置中凡接觸酒精的設備部份如冷凝器、穩壓罐、冷去口蛇管等均採用不銹鋼,以確保成品酒精不被污染。
  15. The process of effluent flow during loading in self - propelled trailing suction hopper dredgers was simulated by way of physical modeling and was measured and analyzed by using the flow rate and concentration of spoil in the hoppers, particle sizes of sediments at the inlet and outlet of the effluent flow pipe and hopper volume as the major control parameters

    摘要通過物理模型試驗模擬自航耙吸挖泥船裝艙溢流施工過程,以艙內流速、艙內濃度、溢流進出口泥沙粒徑、裝艙量幾方面為主要控制因素,進行實測、分析,並比較自航耙4種常用裝艙裝置的消能效果。
  16. The construction includes 31 buildings, including administration building, maintenance factory, wheel - cutting factory, signals and telecommunication facility control room, machinery and electricity equipment factory, etc. furthermore, there are also several kinds of equipments facility : such as, oil tank, gasoline station, automobile - washing factory, way dregs storage area, way dregs loading machine shelter, water discharge channel, wasted water pipe line and scenic spots facility, etc

    工程內容包含有31棟建築物如行政綜合大樓檢驗修理廠車輪鏃削廠號志及通訊設備機房機電與工務設備廠等。另有各項設備施如:油槽加油站洗車廠道渣儲存區,道渣裝卸機棚排水溝渠污水管線景觀設施等。
  17. Company is specialized in producing more than twenty series and 200 specifications, such as stop valve, ball valve, electrical magnetic valve, one - way valve, distributor, guiding pipe, filter, accumulator, motor. all of the products are of good quality and are adopted by many famous air - conditioner companies : haier, midea, gree, shinco, fedders xinle, hualing, hitachi, yuetu and so on. some products have been exported to usa, middle east, italy, spain and southeast of asia and are warmly welcomed by the customers

    公司專業生產空調用截止閥電磁閥電控板四通換向閥球閥單向閥分流器引管儲液筒過濾器電機等二十多個系列200多個品種,產品符合各項技術指標,性能卓越質量穩定可靠,為國內著名的海爾美的奧柯瑪格力新科飛達仕新樂華凌日立月兔等空調企業配套,部份產品已進入美國中東義大利西班牙和東南亞等國際市場,頗受用戶青睞。
  18. Based on the ana1yse of the way of the water pipe network ’ s management and the difficult problem which exist in the course of running water pipe network it presents the collectivity project of the city service pipe network geography information manage system and estab1ish the waterpipe network ’ s basic data - base, and conform afresh the network data by the mode of data - base organization. then on the base of it, open out the water pipe networks graphics show and edit, hydraulic simulation module, disposal accident module and data query andanalyse module and set up the geography information system. it will exert the network ’ s data - base and computer effect on the city water management

    在對目前給水管網管理方式以及管理過程中碰到的問題進行分析的基礎上,給出了城市給水管網地理信息管理系統的總體方案和詳細設計,同時建立了給水管網基礎數據庫,依照數據庫的組織方式對管網數據進行管理、編輯和分析,並在此基礎上,開發了城市給水管網圖形顯示、圖形編輯、水力模擬、管網事故處理、管網數據查詢分析和管網數據專題圖等功能模塊,建立了城市給水管網地理信息系統,以充分發揮管網數據和計算機技術在城市供水管理中的作用。
  19. The influence of insulation effect and resistance property of the cryogenic system on the temperature rise was discussed, the formula of flow temperature rise and optimal flow rate was deduced, the relationship among the flow rate, pipe diameter and flow temperature rise was analyzed and the way to determine flow rate and pipe diameter was introduced

    摘要論述了低溫系統絕熱性能和流阻特性對液流溫度的影響,推導了液流溫升及最優流速公式,分析了流速和管徑與液流溫升的關系,提出了確定流速和管徑的方法。
  20. Air filtration portfolio, air filters, valve, oil mist machine, filter valve, oil mist separator, micro - mist separator, stability activated solenoid valve, pressure gauge, micro - valve and vacuum valves, links the release of the closure - pressure valves, and pipe connection, a one - way valve, t - shelves, shelves, brackets, diaphragm - type flow switches, blades type flow switches, further growth actuator, the valve lock, precision valve, pressure switches, mechanical pressure switches, pneumatic control ratio positioning devices, and electric - gas ratio positioning devices, and telecommunications - pressure converters, electro - pneumatic proportional valve, filter valve, shuttle valve, gas - electric relay and gas indicator, delay pneumatic valve and cylinder fcl, plumbing fcl, mufflers and exhaust cleaner, the excess flow valve with silencer, a one - way valve, rapid valve, rapid joints, rapid valve with fcl, rapid joint sub - cluster gas, micro joints, gas pipes, pipe from the devices, and helical coils, pipes, channels, scissors, multiple fastener, high - speed rotary joint, 10000 threaded joints, and insert the tube joints, rotary joints began, 68. 25 rapid joints and hoses, hose fittings and rapid non - electrostatic

    空氣過濾組合空氣過濾器減壓閥油霧器過濾減壓閥油霧分離器微霧分離器穩定啟動電磁閥壓力表微型減壓閥減壓氣閥三通釋放式截流閥壓力開關管接頭單向閥t型隔板隔板托架膜片型流量開關漿葉型流量開關增速繼動器鎖定閥精密減壓閥壓力開關機械式壓力開關氣控比例定位器電-氣比例定位器電訊號-氣壓轉換器電-氣比例閥過濾減壓閥梭動閥氣-電繼電器氣源指示器氣動延時閥氣缸限流器管道限流器消聲器排氣潔凈器限流閥帶消聲器單向止回閥快速排氣閥快速接頭快速排氣閥帶限流器快速接頭集束分氣微型接頭氣喉管喉管脫離器螺旋管排管管道剪刀多管扣件高速旋轉接頭萬用螺紋接頭插入式管接頭旋式緊鎖接頭難燃性快速接頭和軟管不帶靜電快速接頭和軟管
分享友人