plant schedule 中文意思是什麼

plant schedule 解釋
企業工作制度
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager

    本文作者應用廣義網路計劃技術和關鍵線路法對鍋爐安裝項目進行作業劃分和建立結構模型,並通過p3軟體在平涼電廠在建工程中的應用,實現了安裝工程計劃的動態管理,並通過計算機網路向電廠發布電建工程的施工進度、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。
  2. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐管道工程各種型號除塵環保設備,再如橋梁鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  3. The curious plant of overseas, such as safinia, blue carnation ( schedule ), and barzeria, will also be exhibited together

    將同時展出風信子、藍色康乃馨(預計) 、毛葉鐵線蓮等海外珍稀植物呦!
  4. Planning and schedule control of the iran refine plant reconstruction project

    伊朗煉廠改造項目計劃和進度控制
  5. The construction of the methanol plant by our joint venture with cnooc s chemical division in hainan province is on schedule and trial production has commenced

    集團與中國海洋石油總公司旗下的化學部門在海南省合資興建的甲醇廠,工程現正如期進行,並已開始試產。
  6. The construction of the methanol plant by our joint venture with cnooc s chemical division in hainan province is on schedule with trial production target in the third quarter of 2006

    集團與中國海洋石油總公司旗下的化工部門在海南島合資興建的甲醇廠,工程現正如期進行,試產將訂於二零零六年第三季實行。
  7. The research work is held on schedule ; the first sample machine was taken testing in foundry plant of tsinghua university in late of 1995 and confirmed systematical control thought and technical parameter ; it is proved that this system has high precision of moisture measuring and creditability that establishes good preparation for new research

    研製工作如期進行,一九九五年底第一代試驗樣機在清華大學鑄造廠進行試驗,初步確定了系統的控制思路及各項技術參數,驗證了自行開發的水分檢測裝置的精度及可靠性,為產品的樣機設計打下堅實的基礎。
  8. The expansion of caustic soda plant in hengyang of hunan province with pent - up demand is on schedule, and its monthly capacity will triple by the middle of the current year

    市場對燒需求殷切,在湖南衡陽的燒鹼廠擴產計劃正如期進行,預期每月產能可在本年中增加二倍。
  9. The seller may replace or reduce their advisors provided that such replacement or reduction does not affect the completion schedule of the plant and by prior agreement with buyer

    如果不影響完成裝置工作計劃,並經與買方事先協商,賣方可以更換或減少其指導人員。
  10. 1 plant location along with the size of the distillation, refining, blending, and oil storage facilities as well as the construction schedule and the plant completion date

    一工廠廠址;蒸餾、精煉、摻配及儲油設備之規模、設置進度及建廠完工日期。
  11. The definition, the essential, the orietation model and eleven kinds of functions of mes was dissertated in the article, the relation between mes and the plan layer and the control layer was deeply analysised, and the characteristic of mes in the industry application was researched in detail. after analysised the current production condition and the existent problem in jigang plate plant, the design of system frame, dadabase and function module have been studied, and the realization of it has been expounded. for solving the low efficiency in arranging the rolling plan by man, based on the traveling salesman problem and the pack problem about 0, 1, the mathematics model of the schedule of rolling plan was put forward, and the most near insert way was introduced to solve it, the result was satisfied. based on the practical demands of jigang plate plant combined the academic research of mes software, it has been realized the valid combination between the management of production scene and the upper management software in the dissertation

    本文論述了mes的定義及其實質、 mes的定位模型和其十一項功能,深入分析它與計劃層和控制層的關系,並闡述了mes在行業應用中的特點。在分析濟鋼中厚板廠生產現狀及其存在的問題后,研究了系統的體系結構設計、數據庫設計和功能模塊設計,並對其實現進行了闡述。為了解決人工經驗編排軋製作業計劃問題的低效性,提出了基於旅行商問題和0 1背包問題的軋製作業計劃排序數學模型,並採用最近插入法進行求解,取得了滿意的效果。
  12. The plant is to produce polyester bottle chips and it is schedule to come onstream in q1 2005. zimmer will adopt its continuous polycondensation process technology and use pta and eg as feedstock

    Wap網址: http : xiangsheng . tsou . cn用戶僅需通過手機訪問集團公司wap網站,就可以查詢到相關公司信息產品介紹等。
  13. In accordance with the characteristics of expansion project of huanglongtan power plant, the optimized plan for the construction was designed and the project time schedule was guaranteed

    摘要根據黃龍灘電廠擴建工程的特點,設計了工程建設的優化方案,確保了工期目標。
  14. Lead, manage, and direct all mp & l operators ( plant site ) to meet mp & l objectives, including analysis customer ' s requirement, material planning, and production schedule, packaging design, shipping management, receiving and dispatching goods, physical control of stock, inventory control, outside warehousing management, transportation management

    領導,管理並指導公司物流庫管理員工作,達到物流管理的要求,包括分析客戶需求,制定物料計劃,制定生產排程,包裝設計,發貨管理,運輸管理,收發貨物,庫存控制,外庫管理,實物保管的目標。
  15. This article is the schedule design of the project, are as follows : it is introduced the basic condition of company, the reason of project building, expecialy introduced the good value in manstrength ensure, filed of plant, traffic, pipe rack and maintenance etc of jilin chemical fiber group co., ltd. it is the analys of product market and price

    本文將對該工程項目進行方案設計,具體內容如下:第一章介紹項目建設單位基本情況、項目背景及建設理由,重點陳述吉林化纖集團有限責任公司在人力資源、裝置用地、交通運輸、外管網、維修設施等方面的優勢;第二章對項目方案設計所採用的理論方法做了簡要的介紹。
分享友人